BROOKLYN
552 2 AVENUE
BROOKLYN · BIN 3429635
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Permit Issued — active, not yet Signed-off
RoofUnder Construction385p · 2 filings · 20 docs
Floor 2Under Construction394p · 1 filing · 20 docs
Floor 1Under Construction400p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPMENT CORP16009/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACOBS1808/18/2026
JACOBS SOLUTIONS, INC.308/07/2026
JACOBS CIVIL CONSULTANTS2304/07/2026
HOMERUN SOLAR103/25/2026
AG ENGINEERING PLLC204/29/2025
ANCORA ENGINEERING, PLLC409/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAZAM CONSULTANTS403/21/2026
A1 EXPEDITING SERVICE CORP.3903/21/2026
EXPEDITE DEM803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKANSKA USA BUILDING, INCGeneral Contractor3707/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection607/23/2026
ASPRO PLUMBING INCPlumbing507/08/2026
NORTH SHORE NEON SIGNScaffold307/08/2026
MACCARONE PLUMBING INCPlumbing207/08/2026
SUNRISE ELECTRICAL SRVGeneral Contractor104/09/2026
SUNRISE ELEC'L SERVICESElectrical103/22/2026
B & G ELECL CONTR OF NY IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80113808/18/2026
HOMERUN SOLAR8772103/25/2026
ATLANTIC ENGINEERINGLABOR1381105/02/2024
Building Lifecycle
All (231)Filed (51)Permit Issued (44)Signed Off (4)Violation (1)Inspection (27)Objection (74)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
08/26/2026
Objection raised — Other
08/18/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D2
08/14/2026
Special inspection requirement — Standpipe Systems
Angel Cambero
08/14/2026
Special inspection requirement — Sprinkler Systems
Angel Cambero
08/07/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D7
07/22/2026
Permit issued — Standpipe
B00895541-S6-EW-SD
07/22/2026
Permit issued — Sprinklers
B00895541-S6-EW-SP
07/15/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D5
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Angel Cambero
07/13/2026
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
07/13/2026
Special inspection requirement — Exterior lighting power
Angel Cambero
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
07/13/2026
Special inspection requirement — Lighting controls
Angel Cambero
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Angel Cambero
07/13/2026
Special inspection requirement — Vestibules
RONALD GRAPIN
07/13/2026
Special inspection requirement — Lowest Floor Elevation
Angel Cambero
07/13/2026
Special inspection requirement — Air barrier - visual inspection
RONALD GRAPIN
07/13/2026
Special inspection requirement — Fenestration areas
RONALD GRAPIN
07/13/2026
Special inspection requirement — Interior lighting power
Angel Cambero
07/13/2026
Special inspection requirement — Insulation placement and R values
Angel Cambero
07/13/2026
Special inspection requirement — Preliminary
RONALD GRAPIN
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Angel Cambero
07/13/2026
Special inspection requirement — Air barrier — testing
Angel Cambero
07/13/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RONALD GRAPIN
07/13/2026
Special inspection requirement — Masonry
RONALD GRAPIN
07/13/2026
Special inspection requirement — Fenestration air leakage
Angel Cambero
07/13/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Angel Cambero
06/24/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/18/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/10/2026
Signed off — Alteration
MPP#000000297
B01235995-I1
06/04/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
05/29/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D1
05/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/27/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/20/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
RONALD GRAPIN
05/20/2026
Special inspection requirement — Masonry
RONALD GRAPIN
05/20/2026
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
05/20/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RONALD GRAPIN
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
05/20/2026
Special inspection requirement — Lowest Floor Elevation
RONALD GRAPIN
05/20/2026
Special inspection requirement — Preliminary
RONALD GRAPIN
05/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Objection resolved — Addressed
05/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2026
Permit issued — Mechanical Systems
B00895541-S7-MS
04/30/2026
Permit issued — Sign
B01210962-I1-SG
04/15/2026
Objection raised — Other
04/07/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-C6
03/25/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. ELECTRICAL APP# B01337971-I1 FILED SEPARATELY. NO CHANGETO USE, EGRESS OR OCCUPANCY.
B01342704-I1
03/25/2026
Permit issued — Solar
B01342704-I1-SL
03/20/2026
Violation issued (ECB, closed)
Unknown
03/18/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S8
02/26/2026
Permit issued — Boiler Equipment
B01235995-I1-BE
02/17/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/07/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S4
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC07/22/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/22/2026
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC05/08/2026
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO04/30/2026
DOB NOWSolarSigned-offSUNRISE ELECTRICAL SRV03/25/2026
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ02/26/2026
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC12/16/2025
DOB NOWConstruction FencePermit IssuedSKANSKA USA BUILDING, INC12/04/2025
DOB NOWFoundationSigned-offSKANSKA USA BUILDING, INC12/01/2025
DOB NOWStructuralSigned-offSKANSKA USA BUILDING, INC11/25/2025
DOB NOWFoundationPermit IssuedSKANSKA USA BUILDING, INC11/19/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC11/18/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/27/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/25/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/17/2025
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC07/16/2025
DOB NOWPlumbingSigned-offASPRO PLUMBING INC06/20/2025
DOB NOWFoundationSigned-offSKANSKA USA BUILDING, INC06/10/2025
DOB NOWFoundationSigned-offSKANSKA USA BUILDING, INC06/10/2025
DOB NOWPlumbingPermit IssuedASPRO PLUMBING INC06/09/2025
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC05/06/2025
DOB NOWStructuralSigned-offSKANSKA USA BUILDING, INC05/06/2025
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO05/01/2025
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/01/2025
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC04/01/2025
DOB NOWPlumbingPermit IssuedASPRO PLUMBING INC03/11/2025
DOB NOWConstruction FencePermit IssuedSKANSKA USA BUILDING, INC12/06/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/29/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/27/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/27/2024
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC07/16/2024
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC07/16/2024
DOB NOWPlumbingSigned-offASPRO PLUMBING INC06/26/2024
DOB NOWEarth WorkSigned-offSKANSKA USA BUILDING, INC06/11/2024
DOB NOWEarth WorkSigned-offSKANSKA USA BUILDING, INC06/11/2024
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC05/20/2024
DOB NOWStructuralSigned-offSKANSKA USA BUILDING, INC05/17/2024
DOB NOWFoundationPermit IssuedSKANSKA USA BUILDING, INC05/08/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC05/03/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC04/15/2024
+ 4 more permits on file
1 project · most recent 08/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedSKANSKA USA BUILDING, INCAir Conditioning Systems
Cooling
Aaon RN-025-3-0 7,200 CFM · Rooftop Unit ×16
RN-016-3-0 4,600 CFM · Rooftop Unit ×4
RN-020-3-0 5,520 CFM · Rooftop Unit ×3
RN-016-3-0-HBBC-V0-21-000-A 3,600 CFM · Rooftop Unit ×8
RN-020-3-0-HBBC-V0-21-000-A 3,400 CFM · Rooftop Unit ×1
RNA-025-C-A-3-HJB0C-A02NB 3,400 CFM · Rooftop Unit ×1
Mitsubishi Electric PLA-36A-HAG 1,060 CFM · Vrf Indoor ×6
PKA-A36 920 BTU · Split System ×4
PKA-A18HAG 425 CFM · Split System ×2
PKA-A36 W 920 CFM · Vrf Indoor ×2
PUZ-AK36NL 38 BTU · Heat Pump Outdoor ×8
PLA-AE36NL 1,200 CFM · Vrf Indoor ×7
PKA-AK36NL 920 BTU · Vrf Indoor ×3
PKA-AL18NL 450 CFM · Split System ×2
PUZ-AK18NL 18 BTU · Heat Pump Outdoor ×2
42U024437H1L63 36 BTU ×1
PUZAK36NL 36 BTU · Heat Pump Outdoor ×1
Liebert MMD96ENAJEL2 3,750 CFM · Crac Unit ×12
Carrier 38AXDU12A0A6A0A0C0 98 BTU · Condensing Unit ×6
__Junk__ CRAC 4,200 CFM ×5
crac 4,200 CFM ×1
1 project · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSprinkler System
1 project · most recent 08/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Signed-offASPRO PLUMBING, INCStorm, Water/Sanitary
6 projects · most recent 09/20/2026
General Wiring
FiledStatusContractorScope
09/20/2026CompleteTF ELECTRICAL CORPGeneral Wiring
07/29/2026CompleteB & G ELECL CONTR OF NY IGeneral Wiring
04/07/2026Permit IssuedCITY ELEC'L SIGN ERECTORS—
12/19/2025CompleteSUNRISE ELEC'L SERVICES—
09/11/2025Permit IssuedB & G ELECL CONTR OF NY I1 meters, 1 new_meters
01/30/2024CompleteB & G ELECL CONTR OF NY I—
1 project · most recent 08/18/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/18/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSteel, Concrete, Masonry
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Signed-offSUNRISE ELECTRICAL SRV418 panels, 244.53 kw, 20,000 roof_area_sqft
1 project · most recent 02/02/2024
Fence
FiledStatusContractorScope
02/02/2024——Fence
1 project · most recent 08/18/2026
Dewatering Earthwork
FiledStatusContractorScope
08/18/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCDewatering, Earthwork
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
06/24/2026Pass-Final SD - Fire PumpPassView ↗
06/18/2026Pass-Final SD - Fire PumpPassView ↗
06/04/2026Fail-Final SD - Fire PumpFailView ↗
05/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/27/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/14/2026Standpipe SystemsAngel Camberospecial
08/14/2026Sprinkler SystemsAngel Camberospecial
07/13/2026Fenestration air leakageAngel Camberoenergy_progress
07/13/2026Lighting controlsAngel Camberoenergy_progress
07/13/2026Air barrier - visual inspectionRONALD GRAPINenergy_progress
07/13/2026Fenestration areasRONALD GRAPINenergy_progress
07/13/2026Exterior lighting powerAngel Camberoenergy_progress
07/13/2026Sprayed fire-resistant materialsRONALD GRAPINspecial
07/13/2026Energy Code Compliance InspectionsAngel Camberoprogress
07/13/2026Interior lighting powerAngel Camberoenergy_progress
07/13/2026Fire-Resistance Rated ConstructionRONALD GRAPINprogress
07/13/2026Lowest Floor ElevationAngel Camberoprogress
07/13/2026PreliminaryRONALD GRAPINprogress
07/13/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Angel Camberospecial
07/13/2026VestibulesRONALD GRAPINenergy_progress
07/13/2026Insulation placement and R valuesAngel Camberoenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsAngel Camberospecial
07/13/2026MasonryRONALD GRAPINspecial
07/13/2026Fenestration and door U-factor and product ratingsAngel Camberoenergy_progress
07/13/2026Mastic and Intumescent Fire-resistant CoatingsRONALD GRAPINspecial
07/13/2026Air barrier — testing Angel Camberoenergy_progress
05/20/2026VestibulesRONALD GRAPINenergy_progress
05/20/2026Lighting controlsRONALD GRAPINenergy_progress
05/20/2026Exterior lighting powerRONALD GRAPINenergy_progress
05/20/2026Air barrier — testing RONALD GRAPINenergy_progress
Latest 25 of 150.
▾Documents — 396 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch53
08/26/2026B00934894-S1Request digital key ↗
08/26/2026B00934894-I1Request digital key ↗
08/26/2026B00934894-S2Request digital key ↗
Showing 3 of 53 on file for this type
▸Applications & Permits23
▸DOB NOWDEP Stormwater Construction Permit20
08/25/2026B00895541-D8Open ↗
08/16/2026B00895541-D5Open ↗
08/16/2026B00895541-D1Open ↗
Showing 3 of 20 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/09/2025340903981Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/14/2024340903981Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026B00895541-D1Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications150
▸DOB NOWDPL-1: Design Professional Seal & Signature52
08/26/2026B00987679-I1Open ↗
08/26/2026B00987679-P1Open ↗
08/25/2026B00895541-D8Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/24/2026B00895541-S7Open ↗
09/24/2026B00895541-S7Open ↗
09/24/2026B00895541-S7Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/24/2026B00895541-S7Open ↗
09/23/2026B00895541-S5Open ↗
09/23/2026B00895541-S5Open ↗
Showing 3 of 46 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/14/2024340903981Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/14/2024340903981Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist7
08/16/2026B00895541-A7Open ↗
08/16/2026B00895541-D5Open ↗
Showing 2 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/14/2024340903981Open ↗
▸BISSTREET TREE CHECKLIST1
02/14/2024340903981Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification3
08/16/2026B00895541-S9Open ↗
08/16/2026B00895541-S7Open ↗
Showing 2 of 3 on file for this type
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT6
08/25/2026B00895541-D8Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWTR5 Test Report3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWConcrete Testing Exception Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/14/2024340903981Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs86
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter52
08/25/2026B00895541-D8Open ↗
08/21/2026B01210946-I1Open ↗
08/17/2026B01342704-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)31
08/25/2026B00895541-D8Open ↗
08/16/2026B00895541-D2Open ↗
Showing 2 of 31 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
02/14/2024340903981Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
04/09/2025340903981Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/14/2024340903981Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/09/2025340903981Open ↗
▸Other Documents44
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWSite Survey: Initial16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWGeotechnical Peer Review Report (BC 1818)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWWaiver Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYS DEC TIDAL WETLANDS MAP1
02/14/2024340903981Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type