0 Active ViolationsFDNY Report ↗
Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEquinorUnder Construction478p · 2 filings · 20 docs
BulkheadEquinorUnder Construction6p · 1 filing · 20 docs
Floor 2EquinorUnder Construction699p · 1 filing · 20 docs
Floor 1EquinorUnder Construction705p · 2 filings · 20 docs
CellarEquinorUnder Construction78p · 2 filings · 20 docs
Site & exteriorEquinorUnder Construction749p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Economic Development16310/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jacobs2009/03/2026
Jacobs Solutions308/07/2026
Jacobs Civil Consultants2304/07/2026
Homerun Solar103/25/2026
AG Engineering204/29/2025
Ancora Engineering409/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kazam Consultants403/21/2026
Milrose Consultants3903/21/2026
Expedite Dem803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skanska USA BuildingGeneral Contractor3307/08/2026
Rael Automatic Sprinkler CoFire Protection607/23/2026
Aspro PlumbingPlumbing507/08/2026
Skanska USA BuildingScaffold407/08/2026
North Shore Neon Sign CoSign hanger307/08/2026
Maccarone PlumbingPlumbing207/08/2026
B & G Electrical Contracting of NY IElectrical103/22/2026
Sunrise Electrical SRVspecialty_contractor104/09/2026
Sunrise Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering80114009/03/2026
Homerun Solar8772103/25/2026
Atlantic Engineeringlabor1381105/02/2024
Building Lifecycle
All (231)Filed (53)Permit Issued (44)Signed Off (8)Violation (1)Inspection (21)Objection (74)Special Inspection (30)
09/29/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S2
09/29/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S1
09/21/2026
Objection resolved — Resolved
09/09/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. ELECTRICAL APP# B01337971-I1 FILED SEPARATELY. NO CHANGETO USE, EGRESS OR OCCUPANCY.
B01342704-I1
09/04/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S9
09/03/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D9
09/03/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D8
09/01/2026
Special inspection requirement — Structural Cold-Formed Steel
RONALD GRAPIN
09/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RONALD GRAPIN
09/01/2026
Special inspection requirement — Masonry
RONALD GRAPIN
09/01/2026
Special inspection requirement — Structural Steel - Details
RONALD GRAPIN
09/01/2026
Special inspection requirement — Designated Seismic System
09/01/2026
Special inspection requirement — Structural Steel - Welding
Angel Cambero
09/01/2026
Special inspection requirement — Concrete - Cast-In-Place
RONALD GRAPIN
09/01/2026
Special inspection requirement — Concrete - Precast
RONALD GRAPIN
09/01/2026
Special inspection requirement — Final
Angel Cambero
08/26/2026
Objection raised — Other
08/24/2026
Special inspection requirement — Final
Angel Cambero
08/24/2026
Special inspection requirement — Footing and Foundation
RONALD GRAPIN
08/24/2026
Special inspection requirement — Designated Seismic System
RONALD GRAPIN
08/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
RONALD GRAPIN
08/24/2026
Special inspection requirement — Deep Foundation Elements
Christopher O'Malley
08/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Michael Mudalel
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
RONALD GRAPIN
08/18/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D2
08/14/2026
Special inspection requirement — Standpipe Systems
Angel Cambero
08/14/2026
Special inspection requirement — Sprinkler Systems
Angel Cambero
08/07/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D7
07/22/2026
Permit issued — Sprinklers
B00895541-S6-EW-SP
07/22/2026
Permit issued — Standpipe
B00895541-S6-EW-SD
07/15/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D5
07/13/2026
Special inspection requirement — Preliminary
RONALD GRAPIN
07/13/2026
Special inspection requirement — Lowest Floor Elevation
Angel Cambero
07/13/2026
Special inspection requirement — Interior lighting power
Angel Cambero
07/13/2026
Special inspection requirement — Fenestration areas
RONALD GRAPIN
07/13/2026
Special inspection requirement — Insulation placement and R values
Angel Cambero
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Angel Cambero
07/13/2026
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
07/13/2026
Special inspection requirement — Air barrier - visual inspection
RONALD GRAPIN
07/13/2026
Special inspection requirement — Vestibules
RONALD GRAPIN
07/13/2026
Special inspection requirement — Exterior lighting power
Angel Cambero
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Angel Cambero
06/24/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/18/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
06/10/2026
Signed off — Alteration
MPP#000000297
B01235995-I1
06/04/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
05/29/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-D1
05/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/27/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Objection resolved — Addressed
05/08/2026
Permit issued — Mechanical Systems
B00895541-S7-MS
04/30/2026
Permit issued — Sign
B01210962-I1-SG
04/15/2026
Objection raised — Other
04/07/2026
Filed — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-C6
03/25/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. ELECTRICAL APP# B01337971-I1 FILED SEPARATELY. NO CHANGETO USE, EGRESS OR OCCUPANCY.
B01342704-I1
03/25/2026
Permit issued — Solar
B01342704-I1-SL
03/20/2026
Violation issued (ECB, closed)
Unknown
03/18/2026
Signed off — New Building
(AS PER HUB CONSULTATION) Proposed installation of Mechanical system in connection to New Building Construction (I1) as per plans filed herewith.
B00895541-S8
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co07/22/2026
DOB NOWStandpipePermit IssuedRael Automatic Sprinkler Co07/22/2026
DOB NOWMechanical SystemsPermit IssuedSkanska USA Building05/08/2026
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co04/30/2026
DOB NOWSolarSigned-offSunrise Electrical SRV03/25/2026
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz02/26/2026
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building12/16/2025
DOB NOWConstruction FencePermit IssuedSkanska USA Building12/04/2025
DOB NOWFoundationSigned-offSkanska USA Building12/01/2025
DOB NOWStructuralSigned-offSkanska USA Building11/25/2025
DOB NOWFoundationPermit IssuedSkanska USA Building11/19/2025
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building11/18/2025
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building08/27/2025
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building08/25/2025
DOB NOWStandpipePermit IssuedRael Automatic Sprinkler Co07/17/2025
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co07/16/2025
DOB NOWPlumbingSigned-offAspro Plumbing06/20/2025
DOB NOWFoundationSigned-offSkanska USA Building06/10/2025
DOB NOWFoundationSigned-offSkanska USA Building06/10/2025
DOB NOWPlumbingSigned-offAspro Plumbing06/09/2025
DOB NOWStructuralSigned-offSkanska USA Building05/06/2025
DOB NOWMechanical SystemsPermit IssuedSkanska USA Building05/06/2025
DOB NOWSignPermit IssuedNorth Shore Neon Sign Co05/01/2025
DOB NOWSignSigned-offNorth Shore Neon Sign Co05/01/2025
DOB NOWPlumbingSigned-offMaccarone Plumbing04/01/2025
DOB NOWPlumbingSigned-offAspro Plumbing03/11/2025
DOB NOWConstruction FencePermit IssuedSkanska USA Building12/06/2024
DOB NOWFoundationPermit IssuedSkanska USA Building08/29/2024
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building08/27/2024
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building08/27/2024
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co07/16/2024
DOB NOWStandpipePermit IssuedRael Automatic Sprinkler Co07/16/2024
DOB NOWPlumbingSigned-offAspro Plumbing06/26/2024
DOB NOWEarth WorkSigned-offSkanska USA Building06/11/2024
DOB NOWEarth WorkSigned-offSkanska USA Building06/11/2024
DOB NOWMechanical SystemsPermit IssuedSkanska USA Building05/20/2024
DOB NOWStructuralSigned-offSkanska USA Building05/17/2024
DOB NOWFoundationPermit IssuedSkanska USA Building05/08/2024
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building05/03/2024
DOB NOWGeneral ConstructionPermit IssuedSkanska USA Building04/15/2024
+ 4 more permits on file
1 project · most recent 09/03/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2026Permit IssuedSkanska USA BuildingAir Conditioning Systems
Cooling
Aaon RN-025-3-0 7,200 CFM · Rooftop Unit ×16
RN-016-3-0 4,600 CFM · Rooftop Unit ×4
RN-020-3-0 5,520 CFM · Rooftop Unit ×3
RN-016-3-0-HBBC-V0-21-000-A 3,600 CFM · Rooftop Unit ×8
RN-020-3-0-HBBC-V0-21-000-A 3,400 CFM · Rooftop Unit ×1
RNA-025-C-A-3-HJB0C-A02NB 3,400 CFM · Rooftop Unit ×1
Mitsubishi Electric PLA-36A-HAG 1,060 CFM · Vrf Indoor ×6
PKA-A36 920 BTU · Split System ×4
PKA-A18HAG 425 CFM · Split System ×2
PKA-A36 W 920 CFM · Vrf Indoor ×2
PUZ-AK36NL 38 BTU · Heat Pump Outdoor ×8
PLA-AE36NL 1,200 CFM · Vrf Indoor ×7
PKA-AK36NL 920 BTU · Vrf Indoor ×3
PKA-AL18NL 450 CFM · Split System ×2
PUZ-AK18NL 18 BTU · Heat Pump Outdoor ×2
42U024437H1L63 36 BTU ×1
PUZAK36NL 36 BTU · Heat Pump Outdoor ×1
Liebert MMD96ENAJEL2 3,750 CFM · Crac Unit ×12
Carrier 38AXDU12A0A6A0A0C0 98 BTU · Condensing Unit ×6
__Junk__ CRAC 4,200 CFM ×5
crac 4,200 CFM ×1
1 project · most recent 09/03/2026
Sprinkler System
FiledStatusContractorScope
09/03/2026Permit IssuedRael Automatic Sprinkler CoSprinkler System
1 project · most recent 09/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/03/2026Signed-offAspro PlumbingStorm, Water/Sanitary
6 projects · most recent 09/20/2026
General Wiring
FiledStatusContractorScope
09/20/2026CompleteTF ElectricalGeneral Wiring
07/29/2026CompleteB & G Electrical Contracting of NY IGeneral Wiring
04/07/2026Permit IssuedCity Electrical Sign Erectors—
12/19/2025CompleteSunrise Electrical Services—
09/11/2025Permit IssuedB & G Electrical Contracting of NY I1 meters, 1 new_meters
01/30/2024CompleteB & G Electrical Contracting of NY I—
1 project · most recent 09/03/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/03/2026Permit IssuedRael Automatic Sprinkler CoSteel, Concrete, Masonry
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Signed-offSunrise Electrical SRV418 panels, 244.53 kw, 20,000 roof_area_sqft
1 project · most recent 02/02/2024
Fence
FiledStatusContractorScope
02/02/2024——Fence
1 project · most recent 09/03/2026
Dewatering Earthwork
FiledStatusContractorScope
09/03/2026Permit IssuedRael Automatic Sprinkler CoDewatering, Earthwork
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
06/24/2026Pass-Final SD - Fire PumpPassView ↗
06/18/2026Pass-Final SD - Fire PumpPassView ↗
06/04/2026Fail-Final SD - Fire PumpFailView ↗
05/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/27/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/01/2026Concrete - Cast-In-PlaceRONALD GRAPINspecial
09/01/2026Structural Steel - WeldingAngel Camberospecial
09/01/2026Designated Seismic System—special
09/01/2026Structural Steel - DetailsRONALD GRAPINspecial
09/01/2026Structural Cold-Formed SteelRONALD GRAPINspecial
09/01/2026Concrete - PrecastRONALD GRAPINspecial
09/01/2026MasonryRONALD GRAPINspecial
09/01/2026FinalAngel Camberoprogress
09/01/2026Structural Steel - High Strength BoltingRONALD GRAPINspecial
08/24/2026Footing and FoundationRONALD GRAPINprogress
08/24/2026Designated Seismic SystemRONALD GRAPINspecial
08/24/2026Subsurface Investigations (Borings/Test Pits)Michael Mudalelspecial
08/24/2026Deep Foundation ElementsChristopher O'Malleyspecial
08/24/2026Concrete - Cast-In-PlaceRONALD GRAPINspecial
08/24/2026FinalAngel Camberoprogress
08/24/2026Subsurface Conditions – Fill Placement & In-Place DensityRONALD GRAPINspecial
08/14/2026Standpipe SystemsAngel Camberospecial
08/14/2026Sprinkler SystemsAngel Camberospecial
07/13/2026Interior lighting powerAngel Camberoenergy_progress
07/13/2026PreliminaryRONALD GRAPINprogress
07/13/2026Fire-Resistance Rated ConstructionRONALD GRAPINprogress
07/13/2026Fire-Resistant Penetrations and JointsAngel Camberospecial
07/13/2026MasonryRONALD GRAPINspecial
07/13/2026Lighting controlsAngel Camberoenergy_progress
07/13/2026Fenestration and door U-factor and product ratingsAngel Camberoenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EquinorOfficeCellar, Floors 1, 2, Roof
Project B01342704 Alteration · LOC Issued · 03/25/2026
Project B01210946 Alteration · Permit Entire · 04/29/2025
Project B00895541 New Building · Permit Entire · 07/11/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 415 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch53
08/26/2026B00934894-I1Request digital key ↗
08/26/2026B00934894-S2Request digital key ↗
08/26/2026B00934894-S1Request digital key ↗
Showing 3 of 53 on file for this type
▸Applications & Permits23
▸DOB NOWDEP Stormwater Construction Permit20
08/25/2026B00895541-D8Open ↗
08/16/2026B00895541-D1Open ↗
08/16/2026B00895541-D5Open ↗
Showing 3 of 20 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/09/2025340903981Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/14/2024340903981Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026B00895541-D1Open ↗
08/16/2026B00895541-D5Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications167
▸DOB NOWSpecial Inspector Seal & Signature56
10/05/2026B00895541-S3Open ↗
10/05/2026B00895541-S3Open ↗
10/05/2026B00895541-S3Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWProgress Inspector Seal & Signature56
10/05/2026B00895541-S3Open ↗
10/05/2026B00895541-S3Open ↗
10/05/2026B00895541-S3Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
10/04/2026B00895541-D9Open ↗
08/26/2026B00987679-P1Open ↗
08/26/2026B00987679-I1Open ↗
Showing 3 of 53 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/14/2024340903981Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/14/2024340903981Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist7
08/16/2026B00895541-B3Open ↗
08/16/2026B00895541-D1Open ↗
08/16/2026B00895541-D5Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/14/2024340903981Open ↗
▸BISSTREET TREE CHECKLIST1
02/14/2024340903981Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT6
08/25/2026B00895541-D8Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWTR5 Test Report3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWConcrete Testing Exception Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/14/2024340903981Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs88
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter53
10/04/2026B00895541-D9Open ↗
08/25/2026B00895541-D8Open ↗
08/21/2026B01210946-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)32
10/04/2026B00895541-D9Open ↗
08/25/2026B00895541-D8Open ↗
08/16/2026B00895541-D2Open ↗
Showing 3 of 32 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
02/14/2024340903981Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
04/09/2025340903981Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/14/2024340903981Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/09/2025340903981Open ↗
▸Other Documents44
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWSite Survey: Initial16
08/16/2026B00895541-D5Open ↗
Showing 1 of 16 on file for this type
▸DOB NOWGeotechnical Peer Review Report (BC 1818)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWWaiver Document3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYS DEC TIDAL WETLANDS MAP1
02/14/2024340903981Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type