← Back
Two family converted from one family
552 MACON STREET
BROOKLYN · BIN 3046895
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,594 sfGross Floor Area
2Units
Two family converted from one family · 1,950 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RDG807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2025$1.5M—— → —$565/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP402/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP BUILD CONTRACTORS INCGeneral Contractor207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275402/11/2026
Building Lifecycle
All (10)Filed (4)Permit Issued (3)Signed Off (3)
07/28/2026
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#B01319404.
B01319418-I1
07/28/2026
Signed off — Alteration
PROPOSED INTERIOR AND EXTERIOR RENOVATION AND MODIFICATION TO EXISTING TWO STORY, BASEMENT AND CELLAR, TWO FAMILY TO REMAIN. NO CHANGE TO BUILDING BULK, USE GROUP, EGRESS OR OCCUPANCY.
B01319404-I1
05/08/2026
Signed off — Alteration
PROPOSED INTERIOR AND EXTERIOR RENOVATION AND MODIFICATION TO EXISTING TWO STORY, BASEMENT AND CELLAR, TWO FAMILY TO REMAIN. NO CHANGE TO BUILDING BULK, USE GROUP, EGRESS OR OCCUPANCY.
B01319404-S1
04/24/2026
Permit issued — Mechanical Systems
B01319404-S1-MS
02/12/2026
Permit issued — General Construction
B01319404-I1-GC
02/11/2026
Filed — Alteration
PROPOSED INTERIOR AND EXTERIOR RENOVATION AND MODIFICATION TO EXISTING TWO STORY, BASEMENT AND CELLAR, TWO FAMILY TO REMAIN. NO CHANGE TO BUILDING BULK, USE GROUP, EGRESS OR OCCUPANCY.
B01319404-S1
01/15/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#B01319404.
B01319418-P1
12/04/2025
Permit issued — Plumbing
B01319418-I1-PL
11/20/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT#B01319404.
B01319418-I1
11/18/2025
Filed — Alteration
PROPOSED INTERIOR AND EXTERIOR RENOVATION AND MODIFICATION TO EXISTING TWO STORY, BASEMENT AND CELLAR, TWO FAMILY TO REMAIN. NO CHANGE TO BUILDING BULK, USE GROUP, EGRESS OR OCCUPANCY.
B01319404-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTOP BUILD CONTRACTORS INC04/24/2026
DOB NOWGeneral ConstructionSigned-offTOP BUILD CONTRACTORS INC02/12/2026
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/04/2025
1 project · most recent 01/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/15/2026Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 projects · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026CompleteAYYUB ELECTRIC CORPGeneral Wiring
06/24/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/11/2026HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
02/11/2026Ventilation and air distribution systemBAKHTIAR SHAMLOOenergy_progress
02/11/2026HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
02/11/2026Duct leakage testing, insulation and designBAKHTIAR SHAMLOOenergy_progress
02/11/2026HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
02/10/2026Mechanical SystemsBAKHTIAR SHAMLOOspecial
02/10/2026FinalBAKHTIAR SHAMLOOprogress
01/22/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/14/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
11/14/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
11/14/2025MeteringBAKHTIAR SHAMLOOenergy_progress
11/14/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
11/14/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
11/14/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
11/14/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
11/14/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
11/14/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
11/14/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
11/14/2025FinalBAKHTIAR SHAMLOOprogress
11/14/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
11/14/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
11/14/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01319404-S1Request digital key ↗
08/19/2026B01319404-I1Request digital key ↗
08/18/2026B01319418-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B01319404-S1Open ↗
08/28/2026B01319404-S1Open ↗
08/27/2026B01319404-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01319404-S1Open ↗
08/19/2026B01319404-I1Open ↗
08/18/2026B01319418-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01319418-I1Open ↗
08/28/2026B01319404-S1Open ↗
08/27/2026B01319418-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01319404-I1Open ↗
08/19/2026B01319404-S1Open ↗
08/18/2026B01319418-P1Open ↗
Showing 3 of 4 on file for this type