Elevator cooperative
553 PARK AVENUE
MANHATTAN · BIN 1042010
💬 Discuss this project
1913Year Built
12Stories
D4Building Class
R10Zoning
95,603 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 555 PARK AVE INC · 10,165 sf lot · 9.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Penthouse2p · 2 filings · 20 docs
Floor 121 filing · 4 docs
Floor 111 filing · 4 docs
Floor 101p · 2 filings · 10 docs
Floor 91 filing · 4 docs
Floor 84p · 4 filings · 20 docs
Floor 71 filing · 4 docs
Floor 6Under Construction23p · 4 filings · 20 docs
Floor 53p · 2 filings · 20 docs
Floor 41 filing · 4 docs
Floor 34p · 4 filings · 20 docs
Floor 21 filing · 4 docs
Floor 12p · 3 filings · 17 docs
Cellar1p · 1 filing · 5 docs
BasementUnder Construction14p · 3 filings · 20 docs
Sub-Basement1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL1009/12/2026
PLATINUM SERVICES NY604/09/2026
B&H RESTORATION, INC.903/22/2026
555 PARK AVENUE5303/22/2026
EVERETT SCAFFOLDING INC103/22/2026
TUDOR REALTY803/22/2026
TUPOR REALTY SVCS. CORP.103/22/2026
OWNER OF 100 EAST 62ND ST103/22/2026
BENCHMARK CONSTRUCTION103/22/2026
C O TUDOR REALTY SERVICES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1203/21/2026
RMBA LLC403/21/2026
MUNICIPAL BUILDING CONSULTANTS1403/21/2026
AE DESIGN SOLUTION603/21/2026
PLATINUM SERVICES NY403/21/2026
GREEN LIGHT EXPEDITING LLC803/21/2026
DVA Advisors403/21/2026
MIDTOWN PRESERVATION ARCHITECTURE203/21/2026
Rigid Structural Design, LLC203/21/2026
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NSR II COMPANY INCGeneral Contractor1908/26/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1407/08/2026
JUNO CONTRACTING CORPGeneral Contractor607/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor603/21/2026
K.J. REMODELING OF NY CO*General Contractor507/08/2026
THINK CONSTRUCTION LLCGeneral Contractor507/08/2026
BENCHMARK CONSTRUCTION COGeneral Contractor507/08/2026
KRESHNIK SMAJLAJGeneral Contractor303/21/2026
C-SQUARED CONTRACTING INC.General Contractor307/08/2026
PP COUSIN INCPlumbing307/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor307/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
TM SELECT ELECTRIC CORPElectrical203/22/2026
SO PLUMBING & HEATING INCPlumbing207/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
MACREDDIN PLBG & HTG INCPlumbing207/08/2026
G. LUCAJ HOME IMPROVEMENTGeneral Contractor209/12/2026
Z.W. PLBG & HTG CORPPlumbing107/08/2026
CHARLES LENORD STEEL SERVElectrical103/21/2026
FRANCIS, WALLINGTONElectrical103/21/2026
JUMPER ELECTRIC CORPElectrical103/22/2026
KORMAN, NEILElectrical103/21/2026
LOCAL UNION 40Electrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
RICHARD ADAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS7079503/27/2026
ALAN MARGOLIN & ASSOC423603/14/2024
RICHARD B. KORNBLAU, AIA3208811/01/2023
SKYLINE ENGINEERING, PLLC267409/19/2023
PROJECT TACTICAL SOLUTION5859109/07/2023
CHEN ENGINEERING SERVICES1826206/09/2023
PIRO STUDIO LLC7503306/01/2023
MIDTOWN PRESERVATION ARCH2634103/03/2023
ENTHINK ENGINEERS LLC6247105/05/2022
CES ENGINEERING LLC1277304/08/2022
Building Lifecycle
All (300)Filed (49)Permit Issued (64)Signed Off (23)Facade (FISP) (15)Violation (44)Inspection (19)Objection (56)Special Inspection (30)
09/10/2026
Permit issued — Mechanical Systems
M01236337-I1-MS
08/18/2026
Permit issued — General Construction
M00912473-I1-GC
06/30/2026
Permit issued — General Construction
M00912473-I1-GC
06/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOLLY GLENN
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOLLY GLENN
05/08/2026
Special inspection requirement — Final
MOLLY GLENN
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
04/30/2026
Objection resolved — Addressed
04/27/2026
Special inspection requirement — Final
MOLLY GLENN
04/27/2026
Special inspection requirement — Mechanical Systems
MOLLY GLENN
04/27/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
04/27/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
MOLLY GLENN
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection resolved — Addressed
04/08/2026
Permit issued — General Construction
M00912473-I1-GC
04/06/2026
Objection raised — Cost
04/06/2026
Objection raised — Admin
04/06/2026
Objection raised — Inspections
04/06/2026
Objection raised — Scope
03/27/2026
Filed — Alteration
General construction work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
M01236302-P1
03/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOLLY GLENN
03/26/2026
Filed — Alteration
Mechanical work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
M01236337-P1
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
03/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOLLY GLENN
03/19/2026
Special inspection requirement — Final
MOLLY GLENN
02/26/2026
Permit issued — Mechanical Systems
M01236337-I1-MS
01/20/2026
Permit issued — General Construction
M01236302-I1-GC
01/16/2026
Permit issued — General Construction
M00912473-I1-GC
01/14/2026
Permit issued — Plumbing
M01236417-I1-PL
01/02/2026
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/22/2025
Objection raised — Scope
12/15/2025
Objection resolved — Addressed
12/14/2025
Objection resolved — Addressed
12/12/2025
Signed off — Alteration
M01032523-I1
12/11/2025
Objection raised — Inspections
12/11/2025
Objection raised — Scope
12/08/2025
Objection resolved — Addressed
12/02/2025
Cycle 10 facade report submitted
12/02/2025
Cycle 10 facade report signed — SWARMP
11/18/2025
Cycle 10 facade inspection completed
10/08/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
09/18/2025
Objection raised — Admin
08/25/2025
Objection raised — Admin
08/15/2025
Filed — Alteration
Plumbing work associated with the renovation of a 6th floor apartment. No change to use, egress, or occupancy.
M01236417-I1
08/15/2025
Filed — Alteration
Mechanical work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
M01236337-I1
08/14/2025
Filed — Alteration
General construction work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
M01236302-I1
06/30/2025
Signed off — Alteration
FACADE REPAIRS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00717296-I1
04/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00646669-I1
04/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/03/2025
Signed off — Alteration
Modifications to existing PL system and related piping for unit 3W. No change in use, egress or occupancy.
M00848109-I1
04/03/2025
Signed off — Alteration
Modifications to existing HVAC system for unit 3W. No change in use, egress or occupancy.
M00848086-I1
04/02/2025
Signed off — Alteration
M00848067-I1
02/07/2025
Permit issued — Structural
M00850164-I1-ST
02/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedG. LUCAJ HOME IMPROVEMENT09/10/2026
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC04/08/2026
DOB NOWMechanical SystemsPermit IssuedG. LUCAJ HOME IMPROVEMENT02/26/2026
DOB NOWGeneral ConstructionPermit IssuedKRESHNIK SMAJLAJ01/20/2026
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC01/16/2026
DOB NOWPlumbingPermit IssuedZATOS PLBG AND HTG INC01/14/2026
DOB NOWStructuralSigned-offNSR II COMPANY INC02/07/2025
DOB NOWSuspended ScaffoldPermit IssuedJUNO CONTRACTING CORP01/28/2025
DOB NOWFoundationSigned-offNSR II COMPANY INC01/23/2025
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC01/23/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/09/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC08/28/2024
DOB NOWGeneral ConstructionSigned-offJUNO CONTRACTING07/30/2024
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING07/18/2024
DOB NOWMechanical SystemsPermit IssuedNSR II COMPANY INC07/09/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO06/11/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/17/2024
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC04/01/2024
DOB NOWSuspended ScaffoldPermit IssuedJUNO CONTRACTING CORP03/20/2024
DOB NOWGeneral ConstructionSigned-offBENCHMARK CONSTRUCTION03/01/2024
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP02/22/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC02/08/2024
DOB NOWSuspended ScaffoldPermit IssuedJUNO CONTRACTING CORP01/10/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/11/2023
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC09/19/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC08/23/2023
DOB NOWMechanical SystemsSigned-offTHINK CONSTRUCTION LLC08/09/2023
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC08/09/2023
DOB NOWGeneral ConstructionSigned-offJUNO CONTRACTING08/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offCEPRINE CONSTRUCTION INC07/12/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC07/12/2023
DOB NOWSupported ScaffoldPermit IssuedJUNO CONTRACTING06/27/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/02/2023
DOB NOWPlumbingSigned-offPP COUSIN INC04/14/2023
DOB NOWStructuralSigned-offBENCHMARK CONSTRUCTION03/22/2023
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC03/03/2023
DOB NOWGeneral ConstructionSigned-offBENCHMARK CONSTRUCTION02/24/2023
DOB NOWMechanical SystemsSigned-offBENCHMARK CONSTRUCTION02/22/2023
+ 60 more permits on file
2 projects · most recent 03/26/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2026Permit IssuedG. LUCAJ HOME IMPROVEMENTAir Conditioning Systems
Cooling
Airquest FMC5Z1800AL 18,000 BTU · Fan Coil Indoor ×4
FMC5Z2400AL 24,000 BTU · Split System ×2
Task TYC021TW-19K 19,500 BTU · Condensing Unit ×4
TYC021TW-25K 25,400 BTU · Condensing Unit ×2
Islandaire EZLT12BBD1E45AL 11,800 BTU · Ptac ×4
Friedrich WCT16B30A 15,400 BTU · Ptac ×2
11/01/2023——Air Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P54-NMAU-E3 54,000 BTU · Vrf Indoor ×2
PUHY-P96TKMU-A 96,000 BTU · Vrf Outdoor ×2
PEFY-P24-NMAU-E3 24,000 BTU · Vrf Indoor ×1
PEFY-P48-NMAU-E3 48,000 BTU · Vrf Indoor ×1
PUMY-P48NHMU 48,000 BTU · Vrf Outdoor ×1
PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/15/2025Permit IssuedZATOS PLBG AND HTG INCGas, Water/Sanitary
16 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteRJ ELECTRICAL CONTRACTORSGeneral Wiring
01/05/2026Permit IssuedRJ ELECTRICAL CONTRACTORSGeneral Wiring
02/25/2025CompleteJUMPER ELECTRIC CORPGeneral Wiring
04/29/2024CompleteJUMPER ELECTRIC CORPGeneral Wiring
04/17/2024CompleteFRACCAVENTO ELEC. CORPGeneral Wiring
04/16/2024CompleteILLUMINOUS ELECTRIC CORP.—
07/19/2023CompleteV.I.P. ELECTL CONTR CORPGeneral Wiring
03/16/2023CancelledG. POULAKIS ELEC'L CONTR'General Wiring
02/01/2023CompleteTM SELECT ELECTRIC CORPGeneral Wiring
05/31/2022CompleteJAM ELECTRICAL CORP—
03/31/2022CompleteGAUGE TECH ELECTRIC INCGeneral Wiring
12/21/2021CompleteBOROWIDE ELECT'L CONTR'S—
05/15/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/19/2020Permit IssuedROBERT CHIMENTIGeneral Wiring
01/16/2020Permit IssuedPRUDENT ELECTRIC INCGeneral Wiring
3 projects · most recent 08/15/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/15/2025Permit IssuedZATOS PLBG AND HTG INC1 scope_items
02/13/2024Signed-offNSR II COMPANY INCSteel, Concrete, Masonry
05/15/2023Permit IssuedNSR II COMPANY INC1 scope_items
1 project · most recent 06/27/2023
Scaffold
FiledStatusContractorScope
06/27/2023Permit IssuedJUNO CONTRACTING CORPScaffold
1 project · most recent 03/26/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/26/2026Permit IssuedG. LUCAJ HOME IMPROVEMENTTenant Protection Plan 72 Hour
1 project · most recent 02/12/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/12/2024Permit IssuedJUNO CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
06/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
05/08/2026Fire-Resistance Rated ConstructionMOLLY GLENNprogress
05/08/2026FinalMOLLY GLENNprogress
05/08/2026Structural Stability – Alterations of existing buildingsMOLLY GLENNspecial
05/08/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
04/27/2026FinalMOLLY GLENNprogress
04/27/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
04/27/2026Post-installed AnchorsMOLLY GLENNspecial
04/27/2026Mechanical SystemsMOLLY GLENNspecial
04/27/2026Exhaust and Vent Systems in Plenums and DuctsMOLLY GLENNspecial
03/27/2026Structural Stability – Alterations of existing buildingsMOLLY GLENNspecial
03/19/2026FinalMOLLY GLENNprogress
03/19/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
03/19/2026Fire-Resistance Rated ConstructionMOLLY GLENNprogress
10/08/2025Post-installed AnchorsMOLLY GLENNspecial
03/17/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
03/04/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
02/27/2024Fire-Resistance Rated ConstructionHENLIA CHENprogress
02/27/2024Footing and FoundationHENLIA CHENprogress
02/27/2024FinalHENLIA CHENprogress
02/27/2024Structural Cold-Formed SteelHENLIA CHENspecial
02/27/2024MasonryHENLIA CHENspecial
02/27/2024Structural Steel - WeldingHENLIA CHENspecial
02/27/2024Sprayed fire-resistant materialsHENLIA CHENspecial
02/27/2024Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
02/27/2024Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
Latest 25 of 100.
▾Documents — 514 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch45
09/03/2026M00601421-I1Request digital key ↗
09/03/2026M00601421-P1Request digital key ↗
09/03/2026M00646669-P2Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00341633-I1Request digital key ↗
08/15/2026M00231753-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00231737-I1Request digital key ↗
▸Applications & Permits81
▸DOB NOWLPC Approval/Permit37
09/03/2026M00627146-P1Open ↗
09/03/2026M00627146-I1Open ↗
09/02/2026M00601263-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION26
04/01/2022123856933Open ↗
03/28/2022123856933Open ↗
07/02/2021123776486Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION16
02/18/2021123856933Open ↗
01/15/2020123776486Open ↗
01/09/2020123776486Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/01/2019140871313Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/25/2016122808596Open ↗
▸Seals & Professional Certifications156
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00231753-I1Open ↗
09/05/2026M00231737-I1Open ↗
09/03/2026M00601421-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/25/2026M00912473-I1Open ↗
09/23/2026M01236337-I1Open ↗
09/14/2026M00850164-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/26/2026M00627146-P1Open ↗
09/25/2026M00912473-I1Open ↗
09/25/2026M00912473-I1Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
01/28/2020102285144Open ↗
01/23/2020123156404Open ↗
07/03/2019123776486Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/03/2019123776486Open ↗
07/03/2019123776486Open ↗
03/28/2017140622707Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/03/2019123776486Open ↗
08/20/2012121136617Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/20/2012121136617Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/28/2017140622707Open ↗
06/20/2016140510980Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/28/2017140622707Open ↗
06/20/2016140510980Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/16/2019140871313Open ↗
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING12
06/24/2021123776486Open ↗
03/12/2021123776486Open ↗
03/05/2021123776486Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
08/20/2012121136617Open ↗
Showing 1 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
05/31/2013120816723Open ↗
10/17/2012120816723Open ↗
10/03/2012120816723Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/17/2012120816723Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/03/2019123776486Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes7
05/04/2020123856933Open ↗
01/23/2020123156404Open ↗
10/16/2019140871313Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan2
08/15/2026M00231753-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report37
09/05/2026M00231737-I1Open ↗
09/03/2026M00601421-I1Open ↗
09/03/2026M00601421-P1Open ↗
Showing 3 of 37 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
05/18/2020123856933Open ↗
01/23/2020123156404Open ↗
10/16/2019140871313Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/20/2017122808596Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
01/20/2023123856933Open ↗
01/20/2023123856933Open ↗
01/19/2023123856933Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/23/2020123156404Open ↗
07/03/2019123776486Open ↗
10/20/2017122808596Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/23/2021123776486Open ↗
07/13/2021140871313Open ↗
10/20/2017122808596Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/19/2023123856933Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY24
01/20/2023123856933Open ↗
01/20/2023123856933Open ↗
01/20/2023123856933Open ↗
Showing 3 of 24 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/20/2023123856933Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/20/2023123856933Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
01/20/2023123856933Open ↗
11/23/2021123776486Open ↗
07/13/2021140871313Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL9
06/03/2020123856933Open ↗
03/20/2020123156404Open ↗
01/28/2020102285144Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF2
01/19/2023123856933Open ↗
07/13/2021140871313Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/20/2012121136617Open ↗
Showing 1 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/29/2016122808596Open ↗
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
11/23/2021123776486Open ↗
07/13/2021140871313Open ↗
05/04/2020123856933Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/19/2023123856933Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION12
04/05/2022123856933Open ↗
03/07/2021123776486Open ↗
12/11/2020123776486Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET7
05/01/2020123856933Open ↗
01/23/2020123156404Open ↗
07/03/2019123776486Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
02/18/2021123856933Open ↗
01/28/2020102285144Open ↗
01/17/2020102285144Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/16/2019140871313Open ↗
03/28/2017140622707Open ↗
06/20/2016140510980Open ↗
▸Other Documents28
▸DOB NOWProof of Historic Building21
09/03/2026M00627146-I1Open ↗
09/03/2026M00627146-P1Open ↗
08/29/2026M00848109-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWCalculations2
08/28/2026M00979854-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/28/2026M00979854-I1Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/20/2017122808596Open ↗
▸DOB NOWProperty Ownership Certification1
08/29/2026M00912473-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type