← Back
Two family frame
555 ARGYLE ROAD
BROOKLYN · BIN 3120143
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R3XZoning
3,262 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction21p · 1 filing · 20 docs
Floor 2Under Construction22p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIANA LUI ARCHITECT1009/07/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2024$1.6M—— → —$490/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIANA LUI ARCHITECT508/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MC SQUARED CORPGeneral Contractor403/21/2026
TESTERMAN PLBG & HTG INCPlumbing209/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANDREW REYNIAK ARCHITECT,4712208/07/2024
Building Lifecycle
All (23)Filed (5)Permit Issued (4)Inspection (6)Special Inspection (8)
09/03/2026
Permit issued — Plumbing
B01019021-S1-PL
05/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2024
Permit issued — General Construction
B01019021-I1-GC
10/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2024
Filed — Alteration
Plumbing work proposed for an existing two-family home. No change to use, occupancy or egress.
B01019021-P3
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew Reyniak
08/08/2024
Special inspection requirement — Final
DIANA LUI
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
DIANA LUI
08/08/2024
Special inspection requirement — Lighting in dwelling units
DIANA LUI
08/07/2024
Filed — Alteration
Plumbing work proposed for an existing two-family home. No change to use, occupancy or egress.
B01019021-P2
08/07/2024
Filed — Alteration
Plumbing work proposed for an existing two-family home. No change to use, occupancy or egress.
B01019021-P1
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew Reyniak
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
DIANA LUI
08/06/2024
Special inspection requirement — Final
DIANA LUI
08/06/2024
Special inspection requirement — Lighting in dwelling units
DIANA LUI
07/02/2024
Permit issued — Plumbing
B01019021-S1-PL
05/02/2024
Permit issued — General Construction
B01019021-I1-GC
03/25/2024
Filed — Alteration
Plumbing work proposed for an existing two-family home. No change to use, occupancy or egress.
B01019021-I1
03/25/2024
Filed — Alteration
Plumbing work proposed for an existing two-family home. No change to use, occupancy or egress.
B01019021-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTESTERMAN PLBG & HTG INC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedMC SQUARED CORP10/25/2024
DOB NOWPlumbingPermit IssuedTESTERMAN PLBG & HTG INC07/02/2024
DOB NOWGeneral ConstructionPermit IssuedMC SQUARED CORP05/02/2024
1 project · most recent 08/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/29/2024Permit IssuedTESTERMAN PLBG & HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/08/2024Fire-Resistant Penetrations and JointsAndrew Reyniakspecial
08/08/2024FinalDIANA LUIprogress
08/08/2024Energy Code Compliance InspectionsDIANA LUIprogress
08/08/2024Lighting in dwelling unitsDIANA LUIenergy_progress
08/06/2024Fire-Resistant Penetrations and JointsAndrew Reyniakspecial
08/06/2024Energy Code Compliance InspectionsDIANA LUIprogress
08/06/2024FinalDIANA LUIprogress
08/06/2024Lighting in dwelling unitsDIANA LUIenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01019021-P2Request digital key ↗
08/24/2026B01019021-P1Request digital key ↗
08/24/2026B01019021-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026B01019021-I1Open ↗
08/29/2026B01019021-I1Open ↗
08/29/2026B01019021-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01019021-P2Open ↗
08/24/2026B01019021-P1Open ↗
08/24/2026B01019021-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01019021-I1Open ↗
08/27/2026B01019021-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01019021-P1Open ↗
08/24/2026B01019021-S1Open ↗
08/24/2026B01019021-I1Open ↗
Showing 3 of 5 on file for this type