← Back
Three families
555 CHAUNCEY STREET
BROOKLYN · BIN 3040966
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6Zoning
2,361 sfGross Floor Area
3Units
Rent Stabilized24 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 555 CHAUNCEY STREET LLC · 1,967 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof4p · 1 filing · 9 docs
Floor 35p · 2 filings · 17 docs
Floor 23p · 1 filing · 9 docs
Floor 13p · 1 filing · 9 docs
Cellar8p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
490 CHAUNCEY ST1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/02/2022$1.3M—— → —$561/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECHNEMOTION DESIGN601/01/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616301/01/2024
DOYUN KIM; RA7415305/15/2023
Building Lifecycle
All (89)Filed (6)Permit Issued (3)Signed Off (2)Violation (38)Inspection (8)Objection (2)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
03/13/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/24/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/08/2025
Signed off — Alteration
FILED TO INSTALL NEW MECHANICAL UNITS, AS PER PLAN. HERE WITH GC WORK TYPE DOB NOW JOB# B00756934-I1. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00760516-I1
08/08/2025
Signed off — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00756934-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00757691-I1
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2025
Violation issued (HPD, closed)
A
05/28/2025
Permit issued — General Construction
B00983692-I1-GC
05/22/2025
Permit issued — Mechanical Systems
B00760516-I1-MS
11/21/2024
Objection resolved — Addressed
07/04/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/04/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/04/2024
Special inspection requirement — Metering
FAHAD FATEH
07/04/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/09/2024
Violation issued (HPD, closed)
A
01/09/2024
Objection raised — Scope
01/01/2024
Filed — Alteration CO
RENOVATION OF EXISTING 3 FAM. BUILDING, COMBINE CELLAR WITH FIRST FLOOR, NEW CONVENIENCE STAIR TO ROOF FROM 3RD FLOOR APARTMENT AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00983692-I1
01/01/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/01/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/01/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/01/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/29/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/06/2023
Filed — Alteration
FILED TO INSTALL NEW MECHANICAL UNITS, AS PER PLAN. HERE WITH GC WORK TYPE DOB NOW JOB# B00756934-I1. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00760516-I1
06/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
06/06/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/15/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00756934-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00757691-P1
05/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
05/15/2023
Special inspection requirement — Fenestration areas
DOYUN KIM
05/15/2023
Special inspection requirement — Fenestration air leakage
DOYUN KIM
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/15/2023
Special inspection requirement — Final
DOYUN KIM
05/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/15/2023
Special inspection requirement — Interior lighting power
DOYUN KIM
05/15/2023
Special inspection requirement — Air barrier — testing
DOYUN KIM
05/12/2023
Filed — Alteration
ALT2 FILED FOR INTERIOR RENOVATION OF EXISTING 3 FAM. BUILDING, AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00756934-P1
03/21/2023
Violation issued (HPD, closed)
A
11/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/01/2022
Permit issued — Plumbing
B00757691-I1-PL
10/21/2022
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00756934-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00757691-I1
07/02/2022
Filed — Alteration
ALT2 FILED FOR INTERIOR RENOVATION OF EXISTING 3 FAM. BUILDING, AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00756934-I1
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO05/28/2025
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO05/22/2025
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC11/01/2022
1 project · most recent 09/06/2023
General Wiring
FiledStatusContractorScope
09/06/2023CompleteJP & SON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/13/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/24/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/04/2024Permanent certificateFAHAD FATEHenergy_progress
07/04/2024Interior lighting powerFAHAD FATEHenergy_progress
07/04/2024MeteringFAHAD FATEHenergy_progress
07/04/2024Maintenance informationFAHAD FATEHenergy_progress
01/01/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/01/2024Fenestration areasFAHAD FATEHenergy_progress
01/01/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/01/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/01/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/29/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/29/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/29/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
12/29/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/06/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/06/2023Shutoff dampersFAHAD FATEHenergy_progress
06/06/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/15/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/15/2023Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
05/15/2023Fenestration areasDOYUN KIMenergy_progress
05/15/2023Fenestration air leakageDOYUN KIMenergy_progress
05/15/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/15/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/15/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/15/2023Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
05/15/2023Fire-Resistant Penetrations and JointsDOYUN KIMspecial
Latest 25 of 39.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026B00756934-I1Request digital key ↗
08/29/2026B00756934-P1Request digital key ↗
08/28/2026B00757691-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00983692-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B00756934-I1Open ↗
08/31/2026B00756934-I1Open ↗
08/28/2026B00760516-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026B00756934-I1Open ↗
08/29/2026B00756934-P1Open ↗
08/28/2026B00757691-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00756934-I1Open ↗
08/28/2026B00760516-I1Open ↗
08/26/2026B00983692-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00983692-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026B00756934-I1Open ↗
08/29/2026B00756934-P1Open ↗
08/28/2026B00757691-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/26/2026B00983692-I1Open ↗