DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB02/19/2002V-DOB VIOLATION - ACTIVE
DOB03/08/2001V-DOB VIOLATION - ACTIVE
DOB03/10/2000V-DOB VIOLATION - ACTIVE
DOB01/20/1999V-DOB VIOLATION - ACTIVE
DOB01/06/1998V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB03/08/1996V-DOB VIOLATION - ACTIVE
DOB04/17/1995V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
DOB04/07/1992V-DOB VIOLATION - ACTIVE
DOB04/25/1991V-DOB VIOLATION - ACTIVE
DOB06/29/1990V-DOB VIOLATION - ACTIVE
ECB01/13/2023FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #912536.REMEDY:SUBMIT ACCEPTABLE REQUIRED TENothing owed — awaiting certificate of correction
ECB12/22/2022FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.OBSERVED CRACKED BRICK AND CRACKED MORTAR JOINT ON EXP1 SOUTH ELEVATION.CRACKED BRICK AND CRACKED MORTAR OBSERVED ON EXP2 WEST ELEVATION.OBSERVED CNothing owed — awaiting certificate of correction
ECB12/22/2022FAILURE TO POST EXTERIOR BUILDING WALL CERTIFICATE AS PER 1RCNY 103-04(F)REMEDY:COMPLY WITH CODE AS PER 1RCNY 103-04.Nothing owed — awaiting certificate of correction
Elevator apt, semi-fireproof without stores · 12,618 sf lot · 4.38 FAR built · Flood zone X