ECB02/23/2017CONTRARY TO APPROVED DOCUMENTS.NOTICED AT TIME OF INSPECTION.PERMIT FOR JOB IS FOR SITE PERPERATION AND INTERIOR DEMO ONLY.WORK ON GOING ON SITE NOTICED ALL NEW WOOD FRAMING THRU OUT ENTIRE.REM:STOP ALL WORK AN$500 due
ECB02/23/2017CONTRARY TO APPROVED DOCUMENTS.NOTED AT TIME OF INSPECTION.PERMIT FOR JOB IS FOR JOB PREPORTION AND INTERIOR DEMO ONLY.WORK ON GOING ON SITENOTICED ALL NEW WOOD FRAMING THRU OUT ENTIRE SITE.REM:STOP ALL WORK CO$500 due
HPD09/27/2013§ 27-2089 ADM CODE ABOVE PREMISES HAVE BEEN VACANT AND UNTENANTED EXCEPT FOR CARETAKER FOR 60 DAYS OR MORE, AND CANNOT BE REOCCUPIED UNTIL A NEW CERTIFICATE OF OCCUPANCY HAS BEEN OBTAINED. PREMISES HAVE BEEN VACANT SINCE SEPTEMBER 27, 2013
HPD05/25/2012§ 27-2089 ADM CODE ABOVE PREMISES HAVE BEEN VACANT AND UNTENANTED EXCEPT FOR CARETAKER FOR 60 DAYS OR MORE, AND CANNOT BE REOCCUPIED UNTIL A NEW CERTIFICATE OF OCCUPANCY HAS BEEN OBTAINED. PREMISES HAVE BEEN VACANT SINCE 05/25/2012
HPD02/20/2009§ 27-2089 ADM CODE ABOVE PREMISES HAVE BEEN VACANT AND UNTENANTED EXCEPT FOR CARETAKER FOR 60 DAYS OR MORE, AND CANNOT BE REOCCUPIED UNTIL A NEW CERTIFICATE OF OCCUPANCY HAS BEEN OBTAINED. PREMISES HAVE BEEN VACANT SINCE DATE UNKNOWN
DOB07/09/2008V-DOB VIOLATION - ACTIVE
DOB02/02/2007VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB11/30/2006VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB11/03/2006WORK WITHOUT A PERMIT,WORK NOTED:SECTION OF EXTERIOR BRICK WALL AT ENTRANCE TO BASEMENT DEMO,NEW BRICK WORK CONSTRUCTION IN PROGRESS INTERIOR PARTITION WALLS AND CEILING DEMO REMEDY:STOP ALL WORK IMMEDIATELY.,MAKE SITE SAFE, OBTAIN A PERMIT.CALL DOB@(718/802/3685)PRIOR TO RETURNING TO WORK
HPD02/10/2006§ 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT ROTTEN WOOD JOIST AT CEILING, CENTER PUBLIC HALL BASEMENT STY. AT BASEMENT
HPD11/04/2004§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
HPD12/09/2002§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS HOT WATER SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, APARTMENT AT NORTH
ECB02/23/2017FAILURE TO SAFEGUARD SITE NOTICED AT TIME OF INSPECTION.NOTICED BUILDING CONSTRUCTION SITE NOT SECURED AND ACCESSIBLE TO PUBLIC.WINDOWS NOT BOARDED UP.BASEMENT ACCESSIBLE TO PUBLIC.NO WORKERS ON SITE.REM:STOP AHearing held — result not yet published$-1,000 proposed
ECB02/22/2017BC3307.3/NO OVERHEAD PROTECTION,NOTICED AT TIME OF INSPECTION ALT WORKIN PROGRESS.NOTICED AT EXP 4 ADJACENT PROPERTY REAR YARD HAS NO OVERHEAD PROTECTION.WORK ON GOING ABOVE YARD.REM:STOP ALL WORK WITHIN 10FT ONothing owed — awaiting certificate of correction
ECB02/22/2017NO GUARD RAILS.NOTICED AT TIME OF INSPECTION GUARD ROLLS MISSING THRU OUT ENTIRE BLDG ALL WINDOW OPENINGS HAVE NO GUARD RAILS.REM:STOP ALL WORK PROVIDE GUARD RAILS.Nothing owed — awaiting certificate of correction
ECB02/22/2017ELECTRICAL WORK WITHOUT PERMIT.NOTICED AT TIME OF INSPECTION TEMP ELECTRIC RAN THRU OUT ENTIRE BUILDING AS WELL AS ELECTRICAL LINES AND FIXTURES REMOVED WITHOUT ELECTRIC PERMIT.REM:STOP ALL ELECTRIC WORK OBTAINNothing owed — awaiting certificate of correction
ECB02/22/2017ELECTRICAL WORK WITHOUT PERMIT.NOTICED TEMP LIGHTS RAN THRU OUT BUILDING NOTICED ELECTRICAL LINES AND FIXTURES REMOVED WITHOUT PERMIT.REM:STOP ALL ELECTRIC WORK OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB06/20/2010UNLAWFUL ACTS FAILURE TO COMPLY W /AN ORDER OF THE COMM IN THAT THERE IS A VACATE ORDER ON FILE 7/7/08 1ST FL OCCUPIED AT THE TIME OF INSP REM: COMPLY W/ VACATE ORDER 7/7/08 & RESEAL OPENINGS IN BLDGNothing owed — awaiting certificate of correction
ECB10/23/2009FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: AREA AT FRONT OF BLDG LEADING TO BASEMENT IS FILLED W/COMBUSTIBLE GARBAGE & DEBRIS. REMEDY: MAINTAIN BLDG. REMOVE ALL DEBRIS.Nothing owed — awaiting certificate of correction
ECB07/07/2008FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER NOTE INTERIOR OF 3STY BLDG IN GRAVE NEED OF REPAIR AT 1ST OBSERVED 3 BROKEN JOIST AND 2 CUT MAKING FL STRUCTURALY UNSTABLE EXCESSIVE DEBRIS PILED FRONT BSMT TONothing owed — awaiting certificate of correction