Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsRelated Companies5 filings
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
26 documents · 1 drawing sheet
SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NB #121204366 AS PER THE PLANS FILED HEREWITH.
On file for this project
42 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD PER DRAWINGS. CD-5 NOT REQUIRED BECAUSE SUSPENDED SCAFFOLD WILL BE USED DURING NB CONST. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
RoofProposed pergola at 10th floor terraceUnder Construction1 filing · 5 docs
EquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
FILING FOR INSTALLATION OF UNENCLOSED SUN CONTROL DEVICE ON TERRACE OF 10TH FLOOR SET BACK TERRACE/ROOF PURSUANT TO FLOOR DEFINITION IN NYC ZONING RESOLUTION 12-10 CONSTRUCTION LANGUAGE AND DEFINITIONS FLOOR AREA PARAGRAPH (l)
On file for this project
5 documents
Floor 23HUDSON RIVER 22 LLC c/O McLANE MIDDLETON1 filing · 3 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
No filed description on record for this project.
On file for this project
3 documents · 12 drawing sheets
Floor 22
Floor 21Unit 21AUnder Construction7p · 2 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
Modification to the existing MS system, including the associated ductwork. No change of use, egress, or occupancy.
On file for this project
18 documents · 1 drawing sheet
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY
On file for this project
20 documents · 6 drawing sheets
Floor 20Apartment plumbing and sprinkler fit outUnder Construction1p · 1 filing · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY
On file for this project
20 documents · 1 drawing sheet
Floor 19Unit 21BWUnder Construction2 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
Modification to the existing MS system, including the associated ductwork. No change of use, egress, or occupancy.
On file for this project
18 documents
APARTMENT INTERIORS AESTHETIC RENOVATION: TO REVEIVE NEW PAINT, CLOSET SHELVING, NEW LIGHTING. NO STRUCTRUAL ALTERATTION ARE PROPOSED. NO PLUMBING ALTERATIONS ARE PROPOSED. NO CHANGE OF USE, EGRESS OR OCCUPANCY
On file for this project
3 documents
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13Proposed pergola at 10th floor terraceUnder Construction1p · 1 filing · 5 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
FILING FOR INSTALLATION OF UNENCLOSED SUN CONTROL DEVICE ON TERRACE OF 10TH FLOOR SET BACK TERRACE/ROOF PURSUANT TO FLOOR DEFINITION IN NYC ZONING RESOLUTION 12-10 CONSTRUCTION LANGUAGE AND DEFINITIONS FLOOR AREA PARAGRAPH (l)
On file for this project
5 documents · 1 drawing sheet
Floor 12
Floor 1122nd And 11th Associates, LLC2p · 1 filing
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
On file for this project
6 documents · 2 drawing sheets
Floor 10Proposed pergola at 10th floor terraceUnder Construction1p · 1 filing · 5 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
FILING FOR INSTALLATION OF UNENCLOSED SUN CONTROL DEVICE ON TERRACE OF 10TH FLOOR SET BACK TERRACE/ROOF PURSUANT TO FLOOR DEFINITION IN NYC ZONING RESOLUTION 12-10 CONSTRUCTION LANGUAGE AND DEFINITIONS FLOOR AREA PARAGRAPH (l)
On file for this project
5 documents · 1 drawing sheet
Floor 9Unit 10HW1 filing · 13 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
Minor interior renovations to existing Class A apartment 10HW on the 9th floor of an existing mixed-use building. Scope includes selective demolition of non-load-bearing walls, installation of non-load-bearing walls and miscellaneous finishes.
On file for this project
13 documents
Floor 8Unit 10B2p · 1 filing · 7 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
Job filed for the interior renovation of Apt# 10B West located on the 8th floor. No change in use, occupancy or egress.
On file for this project
7 documents · 2 drawing sheets
Floor 7
Floor 6Unit 6EW2p · 2 filings
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
INTERIOR ALTERATIONS OF EXISTING RESIDENTIAL UNIT TO INCLUDE PARTIAL DEMO OF EXISTING NON-LOAD BEARING PARTITIONS, LIMITED MODIFICATIONS TO CEILING FINISH AND HEIGHT AND DOOR MODIFICATIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
5 documents · 1 drawing sheet
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
On file for this project
6 documents · 1 drawing sheet
Floor 5Unit 5H2 filings · 4 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sprinklers · Standpipe · Supported Scaffold
Installation of new gypsum board dropped ceiling at living/dining room of existing Class A apartment #5H. Also install new storage room and remove interior partitions in areas shown in plans herewith filed. No change in use, egress or occupancy.
On file for this project
2 documents
Installation of new gypsum board dropped ceiling at living/dining room of existing Class A apartment #5H. Also install new storage room and remove interior partitions in areas shown in plans herewith filed. No change in use, egress or occupancy.
On file for this project
2 documents
Floor 422nd And 11th Associates, LLC1p · 1 filing
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sprinklers · Standpipe · Supported Scaffold
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
On file for this project
6 documents · 1 drawing sheet
Floor 322nd And 11th Associates, LLC1 filing
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sprinklers · Standpipe · Supported Scaffold
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
On file for this project
6 documents
Floor 2Unit 2D, Unit 2E1p · 1 filing
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers · Standpipe · Supported Scaffold
RENOVATION OF EXISTING APARTMENTS 2D AND 2E TO COMBINE THEM TO BECOME 2DE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Floor 1Related Companies1p · 3 filings
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Curb Cut · General Construction · Mechanical Systems · Sprinklers · Standpipe · Supported Scaffold
EMERGENCY GENERATOR FILED IN CONJUNCTION WITH NB #121204366 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED FUEL STORAGE FILED IN BIS UNDER JOB #140866294.
On file for this project
13 documents · 1 drawing sheet
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
On file for this project
6 documents
CURB CUT ON WEST 22ND STREET FILED IN CONJUNCTION WITH NB#121204366 AS PER PLANS FILED HEREWITH.
On file for this project
7 documents
Site & exteriorPlywood fence installation5 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SIDEWALK AND ROADWAY. DOT PERMITS BY OTHERS.
On file for this project
11 documents · 6 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.. SIDEWALK SHED TO BE INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.
On file for this project
10 documents · 9 drawing sheets
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NEW BLDG CONSTRUCTION, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.