556 WEST 44 STREET
MANHATTAN · Hell's Kitchen · BIN 1026933
💬 Discuss this project
1940Year Built
2Stories
G2Building Class
R9Zoning
—Gross Floor Area
2Units
0 Open Violations
Auto body / collision or auto repair · Owner of record: 556-558 W 44TH STREET LLC · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 17 docs
Floor 2Under Construction6p · 1 filing · 17 docs
Floor 1Under Construction7p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
558 WEST 44TH STREET603/21/2026
556-558 W 44TH STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC305/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.M.P. PLG & HTG CORPGeneral Contractor307/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402205/18/2026
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Violation (4)Special Inspection (6)
05/29/2026
Permit issued — Mechanical Systems
M01394235-S2-MS
05/29/2026
Permit issued — General Construction
M01394235-I1-GC
05/20/2026
Permit issued — Construction Fence
M01394235-S1-FN
05/18/2026
Filed — Alteration
remove exist. rtu-1 on roof & existing air handler above ceillng. on 2nd floor. reuse existing hanger & reconnect duct main supply and install two new multi-split units cu-1 and cu-2 on exist. roof dunnage. Run ac piping to ah units on 1st and 2nd floors
M01394235-S1
05/18/2026
Filed — Alteration
remove exist. rtu-1 on roof & existing air handler above ceillng. on 2nd floor. reuse existing hanger & reconnect duct main supply and install two new multi-split units cu-1 and cu-2 on exist. roof dunnage. Run ac piping to ah units on 1st and 2nd floors
M01394235-S2
05/18/2026
Filed — Alteration
remove exist. rtu-1 on roof & existing air handler above ceillng. on 2nd floor. reuse existing hanger & reconnect duct main supply and install two new multi-split units cu-1 and cu-2 on exist. roof dunnage. Run ac piping to ah units on 1st and 2nd floors
M01394235-I1
05/11/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
05/11/2026
Special inspection requirement — Final
BRIAN ILL
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
05/11/2026
Special inspection requirement — Maintenance information
BRIAN ILL
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/17/2012
Violation issued (ECB, closed)
Unknown
10/17/2012
Violation issued (ECB, closed)
Plumbing
10/16/2012
Violation issued (ECB, closed)
Construction
10/16/2012
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedI.M.P. PLG & HTG CORP05/29/2026
DOB NOWGeneral ConstructionPermit IssuedI.M.P. PLG & HTG CORP05/29/2026
DOB NOWConstruction FencePermit IssuedI.M.P. PLG & HTG CORP05/20/2026
BISOTISSUEDELEGANCE CONTRACTING CORP06/30/2006
BIS—ISSUEDI.M.P. PLG & HTG CORP02/12/2004
BIS—ISSUEDI.M.P. PLG & HTG CORP04/15/2003
BISPLISSUEDI.M.P. PLBG. & HTG. CORP04/15/2003
1 project · most recent 05/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedI.M.P. PLG & HTG CORPAir Conditioning Systems
Cooling
Fujitsu AUOA120ULBV5 12,000 BTU · Vrf Outdoor ×2
1 project · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedA.X.M. ELECTRIC CORPGeneral Wiring
1 project · most recent 05/18/2026
Fence
FiledStatusContractorScope
05/18/2026Permit IssuedI.M.P. PLG & HTG CORPFence
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/11/2026Mechanical SystemsBRIAN ILLspecial
05/11/2026FinalBRIAN ILLprogress
05/11/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
05/11/2026Maintenance informationBRIAN ILLenergy_progress
05/11/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
05/11/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026M01394235-S1Request digital key ↗
08/17/2026M01394235-I1Request digital key ↗
08/17/2026M01394235-S2Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026M01394235-S2Open ↗
08/26/2026M01394235-S2Open ↗
08/26/2026M01394235-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026M01394235-I1Open ↗
08/17/2026M01394235-S2Open ↗
08/17/2026M01394235-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M01394235-S2Open ↗
▸Safety & Tenant Protection3
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
08/17/2026M01394235-I1Open ↗
08/17/2026M01394235-S2Open ↗
08/17/2026M01394235-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026M01394235-I1Open ↗
08/17/2026M01394235-S2Open ↗