← Back
Elevator apt, fireproof without stores
558 RIVERSIDE DRIVE
MANHATTAN · BIN 1059890
💬 Discuss this project
1968Year Built
26Stories
D3Building Class
R8Zoning
256,528 sfGross Floor Area
146Units
LL97 Covered14 Open Violations 13 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · 21,075 sf lot · 12.17 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Roof2p · 1 filing · 9 docs
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLUMBIA UNIVERSITY607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M&A PROJECTS RESTORATION*General Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SITE SAFETY LLC8555202/06/2025
SUPERSTRUCTURES ENGINEERI374202/06/2025
KZ ENGINEERING, P.C.4665101/04/2024
Building Lifecycle
All (73)Filed (10)Permit Issued (2)Signed Off (2)Facade (FISP) (15)Violation (18)Objection (8)Special Inspection (18)
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/05/2026
Objection raised — Admin
05/05/2026
Objection raised — Admin
05/05/2026
Objection raised — Admin
05/05/2026
Objection raised — Admin
04/07/2026
Filed — Alteration
INTERIOR REHABILITATION OF RESIDENTIAL BUILDING LOBBY. SCOPE INCLUDES THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01372867-S3
04/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/02/2026
Special inspection requirement — Structural Steel - Welding
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/02/2026
Special inspection requirement — Structural Steel - Details
04/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/30/2026
Filed — Alteration
INTERIOR REHABILITATION OF RESIDENTIAL BUILDING LOBBY. SCOPE INCLUDES THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01372867-S2
03/30/2026
Filed — Alteration
INTERIOR REHABILITATION OF RESIDENTIAL BUILDING LOBBY. SCOPE INCLUDES THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01372867-S1
03/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/28/2026
Filed — Alteration
INTERIOR REHABILITATION OF RESIDENTIAL BUILDING LOBBY. SCOPE INCLUDES THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01372867-I1
03/26/2026
Special inspection requirement — Final
07/14/2025
Filed — Alteration
EXTERIOR REHAB OF OUTDOOR PLAZA, INLCUDING THE REMOVAL OF EXISTING ROOFING AND OVERBURDEN, NEW ROOFING AND OVERBURDEN, AND INSTALLATION OF NEW STAIRS AND LANDSCAPE, RENOVATIONS TO EXISTING BREEZEWAY AND ADA RAMP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01123611-P1
04/21/2025
Cycle 10 facade report submitted
03/21/2025
Cycle 10 facade report signed — SAFE
03/12/2025
Cycle 10 facade inspection completed
02/11/2025
Signed off — Alteration
Columbia University, Exterior facade repairs as per the plans filed including: Brick masonry & joint sealant replacement. Concrete spall and crack repairs. Steel lintel/ shelf angle replacement. Brick pointing, Steel coating.
M08034909-I1
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/10/2025
Special inspection requirement — Final
David May
02/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
02/10/2025
Special inspection requirement — Masonry
David May
02/06/2025
Filed — Alteration
Columbia University, Exterior facade repairs as per the plans filed including: Brick masonry & joint sealant replacement. Concrete spall and crack repairs. Steel lintel/ shelf angle replacement. Brick pointing, Steel coating.
M08034909-P1
02/04/2025
Filed — Alteration
EXTERIOR REHAB OF OUTDOOR PLAZA, INLCUDING THE REMOVAL OF EXISTING ROOFING AND OVERBURDEN, NEW ROOFING AND OVERBURDEN, AND INSTALLATION OF NEW STAIRS AND LANDSCAPE, RENOVATIONS TO EXISTING BREEZEWAY AND ADA RAMP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01123611-S1
02/04/2025
Cycle 9 facade report signed — SAFE
01/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/13/2025
Objection resolved — Addressed
01/10/2025
Special inspection requirement — Masonry
David May
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
01/10/2025
Special inspection requirement — Final
David May
01/07/2025
Cycle 9 facade report submitted
01/03/2025
Objection resolved — Addressed
01/02/2025
Signed off — Alteration
M00985901-I1
12/26/2024
Objection raised — Scope
12/26/2024
Objection raised — Scope
12/24/2024
Filed — Alteration
EXTERIOR REHAB OF OUTDOOR PLAZA, INLCUDING THE REMOVAL OF EXISTING ROOFING AND OVERBURDEN, NEW ROOFING AND OVERBURDEN, AND INSTALLATION OF NEW STAIRS AND LANDSCAPE, RENOVATIONS TO EXISTING BREEZEWAY AND ADA RAMP. NO CHANGE TO USE EGRESS OR OCCUPANCY
M01123611-I1
12/12/2024
Cycle 9 facade inspection completed
12/02/2024
Violation issued (ECB, closed)
Construction
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2024
Violation issued (ECB, closed)
Construction
03/26/2024
Violation issued (ECB, closed)
Construction
01/23/2024
Permit issued — General Construction
M08034909-I1-GC
01/05/2024
Permit issued — Suspended Scaffold
M00985901-I1-SC
01/04/2024
Filed — Alteration
M00985901-I1
01/04/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
01/04/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
06/14/2023
Filed — Alteration
Columbia University, Exterior facade repairs as per the plans filed including: Brick masonry & joint sealant replacement. Concrete spall and crack repairs. Steel lintel/ shelf angle replacement. Brick pointing, Steel coating.
M08034909-I1
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/10/2023
Violation issued (ECB, open)
Local Law
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*01/23/2024
DOB NOWSuspended ScaffoldSigned-offM & A PROJECTS INC01/05/2024
BISEQISSUEDWEST NEW YORK RESTORATION OF CT05/02/2007
1 project · most recent 04/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2026——Heating and Air Conditioning Systems
Heat / Cool
Trane ×1
1 project · most recent 04/07/2026
Storm
FiledStatusContractorScope
04/07/2026——Storm
2 projects · most recent 04/07/2026
Steel
FiledStatusContractorScope
04/07/2026——Steel
07/14/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/06/2026Fire-Resistant Penetrations and Joints—special
04/02/2026Tenant Protection Plan Compliance—special
04/02/2026Structural Steel - Welding—special
04/02/2026Structural Stability – Alterations of existing buildings—special
04/02/2026Structural Steel - Details—special
04/02/2026Structural Steel - High Strength Bolting—special
03/29/2026Tenant Protection Plan Compliance—special
03/26/2026Final—progress
02/11/2025Fire-Resistant Penetrations and Joints—special
02/10/2025FinalDavid Mayprogress
02/10/2025Tenant Protection Plan ComplianceKHALID ALGENDEspecial
02/10/2025MasonryDavid Mayspecial
01/29/2025Tenant Protection Plan Compliance—special
01/10/2025MasonryDavid Mayspecial
01/10/2025Tenant Protection Plan ComplianceKHALID ALGENDEspecial
01/10/2025FinalDavid Mayprogress
01/04/2024Post-installed AnchorsKarol Zdancewiczspecial
01/04/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026M00985901-I1Request digital key ↗
08/25/2026M01123611-P1Request digital key ↗
08/25/2026M01123611-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026M01123611-S1Open ↗
08/25/2026M01123611-P1Open ↗
08/25/2026M01123611-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026M00985901-I1Open ↗
08/27/2026M00985901-I1Open ↗
08/24/2026M08034909-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M08034909-P1Open ↗
08/23/2026M08034909-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026M08034909-I1Open ↗
08/25/2026M08034909-P1Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/25/2026M01123611-S1Open ↗
08/25/2026M01123611-P1Open ↗
08/18/2026M01372867-S1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M00985901-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00985901-I1Open ↗