← Back
Two family brick
559 PINE STREET
BROOKLYN · BIN 3095720
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5Zoning
2,120 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: REL ASSOCIATES LLC · 1,983 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof1 filing · 8 docs
Basement3p · 1 filing · 18 docs
1 job · most recent 03/20/2026
Gas
FiledStatusContractorScope
03/20/2026Signed-offSENID PL & HTG CORPGas
1 job · most recent 06/25/2023
Wood
FiledStatusContractorScope
06/25/2023Permit IssuedKMN BUILDERS INCWood
Building Lifecycle
All (13)Filed (5)Permit Issued (3)Signed Off (2)Violation (3)
06/16/2026
Signed off — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-S1
06/16/2026
Signed off — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-I1
03/20/2026
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-P2
02/03/2026
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-P1
11/17/2025
Permit issued — Plumbing
B01311257-I1-PL
11/17/2025
Permit issued — Mechanical Systems
B01311257-S1-MS
11/10/2025
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-S1
11/10/2025
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER WITH TWO (2) DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. INSTALL TWO (2) NEW GAS METERS AND GAS PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01311257-I1
08/23/2023
Violation issued (ECB, open)
Construction
07/25/2023
Permit issued — Structural
B00885842-I1-GC-CX
06/25/2023
Filed — Alteration
B00885842-I1
02/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2016
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REL ASSOCIATES LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/28/2025$1.1M—POINT HOLDINGS LLC → Private party$519/sf building
03/17/2016$100K—Private party → REL ASSOCIATES LLC$47/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.403/20/2026
J.K.DESIGN106/25/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KMN BUILDERS INCGeneral Contractor107/08/2026
SENID PLUMBING & HEATINGGeneral Contractor104/09/2026
SENID PL & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808403/20/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSENID PL & HTG CORP11/17/2025
DOB NOWMechanical SystemsSigned-offSENID PLUMBING & HEATING11/17/2025
DOB NOWStructuralPermit IssuedKMN BUILDERS INC07/25/2023
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/10/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/20/2026Fire-Resistant Penetrations and JointsJoseph Bazinispecial
03/20/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/19/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/19/2025Fire-Resistant Penetrations and JointsJoseph Bazinispecial
10/30/2025Mechanical SystemsJoseph Bazinispecial
10/30/2025FinalJoseph Baziniprogress
06/07/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
06/07/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
06/07/2023Insulation placement and R valuesNANIK MASSANDenergy_progress
06/06/2023Finaljacob Kannerprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00885842-I1Request digital key ↗
08/19/2026B01311257-I1Request digital key ↗
08/19/2026B01311257-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01311257-S1Open ↗
08/29/2026B01311257-I1Open ↗
08/28/2026B00885842-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00885842-I1Open ↗
08/19/2026B01311257-P2Open ↗
08/19/2026B01311257-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01311257-S1Open ↗
08/29/2026B01311257-I1Open ↗
08/26/2026B01311257-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00885842-I1Open ↗
08/19/2026B01311257-I1Open ↗
08/19/2026B01311257-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00885842-I1Open ↗