← Back
Three families
559 PUTNAM AVENUE
BROOKLYN · BIN 3051807
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,060 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · Owner of record: 559 PUTNAM LLC · 1,700 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof13p · 1 filing · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar13p · 2 filings · 20 docs
Sub-Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FANGZHENGCON1007/08/2026
559 PUTNAM LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2021$1.4M—— → —$462/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT103/06/2024
FLUSHING ENGINEERING SERVICE PC606/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Q&F CONSTRUCTION INCGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513103/06/2024
FLUSHING ENGINEERING SERV4373606/08/2023
Building Lifecycle
All (68)Filed (7)Permit Issued (3)Violation (17)Inspection (11)Special Inspection (30)
11/20/2025
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, closed)
A
03/06/2024
Filed — Alteration CO
B01010878-I1
02/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
02/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
02/26/2024
Special inspection requirement — Final
DEZHANG FANG
02/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/26/2024
Special inspection requirement — Structural Steel - Details
DEZHANG FANG
02/26/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
02/26/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
02/26/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
02/26/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
11/21/2023
Violation issued (HPD, closed)
I
08/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2023
Special inspection requirement — Interior lighting power
KY FU
06/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
06/09/2023
Special inspection requirement — Maintenance information
KY FU
06/09/2023
Special inspection requirement — Fenestration areas
KY FU
06/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
06/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
06/09/2023
Special inspection requirement — Fenestration air leakage
KY FU
06/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
06/09/2023
Special inspection requirement — Energy Code Compliance Inspections
KY FU
06/09/2023
Special inspection requirement — Final
KY FU
06/09/2023
Special inspection requirement — Air barrier - visual inspection
KY FU
06/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
06/09/2023
Special inspection requirement — Mechanical Systems
KY FU
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
06/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
06/08/2023
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, CEILING. AND OVERLAY NEW FLOOR OVER EXIST. FLOORING. EXTERIOR WORK FOR NEW REAR DECK AND STAIR. AND MECHANICAL WORK FOR INSTALL AC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS.
B00695387-P3
05/11/2023
Special inspection requirement — Fenestration air leakage
KY FU
05/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
05/11/2023
Special inspection requirement — Mechanical Systems
KY FU
05/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
04/10/2023
Permit issued — Plumbing
B00695388-I1-PL
04/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2023
Violation issued (HPD, closed)
A
03/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/08/2023
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, CEILING. AND OVERLAY NEW FLOOR OVER EXIST. FLOORING. EXTERIOR WORK FOR NEW REAR DECK AND STAIR. AND MECHANICAL WORK FOR INSTALL AC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS.
B00695387-P2
11/10/2022
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, CEILING. AND OVERLAY NEW FLOOR OVER EXIST. FLOORING. EXTERIOR WORK FOR NEW REAR DECK AND STAIR. AND MECHANICAL WORK FOR INSTALL AC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS.
B00695387-P1
11/10/2022
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 3-STORY BUILDING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B00695388-P1
11/10/2022
Violation issued (HPD, closed)
I
10/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/17/2022
Permit issued — Plumbing
B00695388-I1-PL
03/14/2022
Permit issued — General Construction
B00695387-I1-GC-CX
03/10/2022
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 3-STORY BUILDING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
B00695388-I1
03/10/2022
Filed — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, CEILING. AND OVERLAY NEW FLOOR OVER EXIST. FLOORING. EXTERIOR WORK FOR NEW REAR DECK AND STAIR. AND MECHANICAL WORK FOR INSTALL AC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS.
B00695387-I1
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP04/10/2023
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP03/17/2022
DOB NOWGeneral ConstructionPermit IssuedQ&F CONSTRUCTION INC03/14/2022
1 project · most recent 06/08/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2023Permit IssuedQ&F CONSTRUCTION INCAir Conditioning Systems
Cooling
Daikin 3MXS24RMVJUA 24,000 BTU · Heat Pump Outdoor ×6
York YCD48B21SA 48,000 BTU · Condensing Unit ×3
1 project · most recent 11/10/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/10/2022Permit IssuedTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 project · most recent 05/26/2021
FiledStatusContractorScope
05/26/2021CompleteSTERLING ELECTRIC INC.3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
02/26/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/26/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
02/26/2024FinalDEZHANG FANGprogress
02/26/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/26/2024Structural Steel - DetailsDEZHANG FANGspecial
02/26/2024Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
02/26/2024Fenestration air leakageDEZHANG FANGenergy_progress
02/26/2024Air barrier - visual inspectionDEZHANG FANGenergy_progress
02/26/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
02/26/2024Fenestration areasDEZHANG FANGenergy_progress
06/09/2023Energy Code Compliance InspectionsKY FUprogress
06/09/2023Fire-Resistance Rated ConstructionKY FUprogress
06/09/2023FinalKY FUprogress
06/09/2023Mechanical SystemsKY FUspecial
06/09/2023Fire-Resistant Penetrations and JointsKY FUspecial
06/09/2023Structural Stability – Alterations of existing buildingsKY FUspecial
06/09/2023Air barrier - visual inspectionKY FUenergy_progress
06/09/2023Fenestration air leakageKY FUenergy_progress
06/09/2023Fenestration areasKY FUenergy_progress
06/09/2023Maintenance informationKY FUenergy_progress
06/09/2023Interior lighting powerKY FUenergy_progress
06/09/2023Fenestration and door U-factor and product ratingsKY FUenergy_progress
06/09/2023HVAC-R and service water piping design and insulationKY FUenergy_progress
06/09/2023HVAC-R and service water heating system controlsKY FUenergy_progress
06/09/2023HVAC-R and service water heating equipmentKY FUenergy_progress
Latest 25 of 80.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00695388-I1Request digital key ↗
08/28/2026B00695388-P1Request digital key ↗
08/27/2026B00695387-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications80
▸DOB NOWProgress Inspector Seal & Signature58
09/01/2026B00695388-P1Open ↗
09/01/2026B00695388-P1Open ↗
09/01/2026B00695388-P1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00695388-P1Open ↗
08/26/2026B00695387-I1Open ↗
08/26/2026B00695387-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00695388-P1Open ↗
08/28/2026B00695388-I1Open ↗
08/27/2026B00695387-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01010878-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00695388-P1Open ↗
08/28/2026B00695388-I1Open ↗
08/27/2026B00695387-P2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01010878-I1Open ↗