| Owner | Filings | Most Recent |
|---|---|---|
| USTA | 169 | 09/24/2026 |
| CAPITAL PROJECTS DIV NYC PARKIN | 7 | 03/21/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MATTHEW L ROSSETTI ARCHITECT PC | 49 | 08/11/2026 |
| DIPROPERZIO & MALLIA ARCHITECTS,LLP | 47 | 08/11/2026 |
| ME ENGINEERS | 14 | 08/11/2026 |
| RAYMOND CHAN ARCHITECT, PC. | 12 | 07/24/2026 |
| CLARK REDER ENGINEERING | 1 | 07/06/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 3 | 06/09/2026 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 3 | 04/30/2026 |
| BREEZE NATIONAL INC. | 13 | 03/05/2026 |
| MG ENGINEERING D.P.C. | 2 | 01/12/2026 |
| PLATFORM SOLUTIONS INC | 3 | 01/09/2026 |
| FL&M ENGINEERING DESIGN &INSPECTION | 4 | 01/07/2026 |
| GEIGER ENGINEERS PC | 6 | 11/20/2025 |
| WSP | 10 | 08/01/2025 |
| URBAN INTEGRATIONS | 8 | 07/29/2025 |
| MCLAREN ENGINEERING GROUP | 5 | 07/22/2025 |
| DEEP FOUNDATION ENGINEERING | 1 | 07/11/2025 |
| MUESER RUTLEDGE CONSULTING ENGINEER | 4 | 03/19/2025 |
| EXDEM ENGINEERING SERVICES | 2 | 03/05/2025 |
| ROBERT W. DE BRUIN | 1 | 02/20/2025 |
| M-E ENGINEERS | 4 | 01/28/2025 |
| LEVIN ENGINEERING PLLC | 1 | 12/18/2024 |
| KEVIN M. FINN, P.E., INC. | 4 | 08/05/2022 |
| ADG ARCHITECTURE AND DESIGN PC | 2 | 05/18/2021 |
| NA | 1 | 04/29/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| DIPROPERZIO MALLIA ARCHITECTS | 122 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 52 | 03/21/2026 |
| EXPEDITER | 12 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 6 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| DANICO SERVICES | 2 | 03/21/2026 |
| RAYMOND CHAN ARCHITECT | 14 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 9 | 03/21/2026 |
| ARUP | 2 | 03/21/2026 |
| LC EXPEDITING SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TISHMAN CONSTRUCTION CORP | General Contractor | 28 | 09/24/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 15 | 07/10/2026 |
| TRIUMPH MODULAR INC | General Contractor | 12 | 03/21/2026 |
| BREEZE NATIONAL INC | General Contractor | 8 | 07/30/2026 |
| PRODUCTION GLUE LLC | General Contractor | 5 | 07/08/2026 |
| ECD NY INC | General Contractor | 4 | 04/09/2026 |
| OLYMPIC PLBG & HTG SVC IN | Plumbing | 4 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 4 | 09/18/2026 |
| BIRDAIR INC | General Contractor | 4 | 07/08/2026 |
| GIO-ART PRODUCTIONS INC | General Contractor | 3 | 03/21/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 2 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 2 | 04/09/2026 |
| ANCHOR BREAK & CUTTING.CO | General Contractor | 2 | 07/08/2026 |
| TRI CITY MECHANICAL GROUP CORP | Plumbing | 2 | 07/08/2026 |
| RAD & D'APRILE INC | General Contractor | 2 | 07/08/2026 |
| ACE RENTAL CORP | General Contractor | 2 | 08/06/2026 |
| HUNT CONSTRUCTION GROUP,* | General Contractor | 1 | 07/08/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 1 | 03/22/2026 |
| FLUSHING IRON WELD INC | General Contractor | 1 | 04/09/2026 |
| ADCO ELEC'L CORP | Electrical | 1 | 03/22/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 1 | 04/09/2026 |
| MICHAEL JAMES INDUSTRIES | General Contractor | 1 | 07/08/2026 |
| NYFF EVENTS LLC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DELTA TESTING LABS | 687 | 37 | 08/11/2026 |
| DIPROPERZIO & MALLIA, LLP | 7517 | 2 | 12/11/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 3 | 11/20/2025 |
| WSP USA CORP | 1848 | 4 | 07/29/2025 |
| MUESER RUTLEDGE CONSULTIN | 977 | 1 | 02/19/2025 |
| ATLAS ATC ENGINEERING INC | 8011 | 1 | 09/21/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 09/23/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 08/07/2026 |
| DOB NOW | General Construction | Signed-off | ACE RENTAL CORP | 08/05/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 07/29/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 07/29/2026 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 07/09/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 06/29/2026 |
| DOB NOW | Plumbing | Signed-off | OLYMPIC PLBG & HTG SVC IN | 06/18/2026 |
| DOB NOW | Supported Scaffold | Signed-off | RAD & D'APRILE INC | 06/09/2026 |
| DOB NOW | Support of Excavation | Signed-off | TISHMAN CONSTRUCTION CORP | 05/18/2026 |
| DOB NOW | Supported Scaffold | Signed-off | RAD & D'APRILE INC | 05/05/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TISHMAN CONSTRUCTION CORP | 04/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 04/02/2026 |
| DOB NOW | Plumbing | Permit Issued | OLYMPIC PLBG & HTG SVC IN | 04/01/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 03/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 03/26/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 03/18/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 03/10/2026 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 02/19/2026 |
| DOB NOW | Construction Fence | Permit Issued | PLATFORM SOLUTIONS, INC | 01/09/2026 |
| DOB NOW | General Construction | Signed-off | TISHMAN CONSTRUCTION CORP | 12/26/2025 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 12/26/2025 |
| DOB NOW | Plumbing | Permit Issued | OLYMPIC PLBG & HTG SVC IN | 12/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 12/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TISHMAN CONSTRUCTION CORP | 12/08/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TISHMAN CONSTRUCTION CORP | 12/02/2025 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 12/01/2025 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 10/28/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | BREEZE NATIONAL INC | 10/20/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | MC SUPERSTRUCTURE INC | 10/02/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATFORM SOLUTIONS, INC | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | BREEZE NATIONAL INC | 09/04/2025 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 08/27/2025 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 08/19/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 08/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | BREEZE NATIONAL INC | 08/15/2025 |
| DOB NOW | General Construction | Signed-off | ACE RENTAL | 08/07/2025 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 08/05/2025 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 01/12/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 2 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | OLYMPIC PLBG & HTG SVC IN | Gas, Storm, Water/Sanitary |
| 07/21/2026 | Permit Issued | OLYMPIC PLBG & HTG SVC IN | Gas, Storm, Water/Sanitary |
| 06/17/2026 | Signed-off | OLYMPIC PLBG & HTG SVC IN | Water/Sanitary |
| 01/12/2026 | — | — | — |
| 03/05/2025 | Signed-off | FLAVIO MECHANICAL CORP | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2026 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 12/18/2025 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 12/18/2025 | Permit Issued | ADCO ELEC'L CORP | 4 meters, 4 new_meters |
| 11/26/2025 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 11/18/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 10/31/2025 | Permit Issued | ADCO ELEC'L CORP | — |
| 10/29/2025 | Permit Issued | ADCO ELEC'L CORP | — |
| 10/23/2025 | Permit Issued | ADCO ELEC'L CORP | — |
| 10/23/2025 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 10/10/2025 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 08/13/2025 | Permit Issued | TEAM ELECTRIC, INC | — |
| 03/31/2025 | Complete | ATLAS-ACON ELEC. SERVICE | 4 meters |
| 12/03/2024 | Permit Issued | HELLMAN ELECTRIC LLC | — |
| 11/08/2022 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 12/14/2021 | Complete | HELLMAN ELECTRIC LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/05/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Steel, Concrete |
| 11/20/2025 | Signed-off | FLUSHING IRON WELD INC | Steel |
| 03/05/2025 | Signed-off | TISHMAN CONSTRUCTION CORP | 4 scope_items |
| 01/09/2025 | Permit Issued | TISHMAN CONSTRUCTION CORP | Steel, Concrete |
| 11/08/2024 | Permit Issued | TISHMAN CONSTRUCTION CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2026 | Signed-off | RAD & D'APRILE INC | Scaffold |
| 01/09/2026 | Permit Issued | PLATFORM SOLUTIONS, INC | Fence |
| 01/07/2026 | Permit Issued | MC SUPERSTRUCTURE INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/05/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Protection and Mechanical Methods |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/24/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 08/14/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/16/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 07/16/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 07/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/01/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 06/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/08/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/20/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 04/15/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/10/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 04/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/12/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 11/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/30/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 10/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/04/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 08/01/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 07/16/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 07/03/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/13/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 08/13/2026 | HVAC-R and service water heating system controls | RICHARD GREENWALD | energy_progress |
| 08/13/2026 | HVAC-R and service water heating equipment | RICHARD GREENWALD | energy_progress |
| 08/13/2026 | HVAC-R and service water piping design and insulation | RICHARD GREENWALD | energy_progress |
| 08/13/2026 | Maintenance information | RICHARD GREENWALD | energy_progress |
| 08/13/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 08/13/2026 | Non Potable Water Systems | RICHARD GREENWALD | special |
| 08/10/2026 | HVAC-R and service water heating system controls | RICHARD GREENWALD | energy_progress |
| 08/10/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 08/10/2026 | Non Potable Water Systems | RICHARD GREENWALD | special |
| 08/10/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 08/10/2026 | Maintenance information | RICHARD GREENWALD | energy_progress |
| 08/10/2026 | HVAC-R and service water piping design and insulation | RICHARD GREENWALD | energy_progress |
| 08/10/2026 | HVAC-R and service water heating equipment | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Vestibules | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Sprayed fire-resistant materials | RICHARD GREENWALD | special |
| 08/07/2026 | Fenestration air leakage | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Fenestration areas | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Air barrier - visual inspection | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Insulation placement and R values | RICHARD GREENWALD | energy_progress |
| 08/07/2026 | Fire-Resistance Rated Construction | RICHARD GREENWALD | progress |
| 08/07/2026 | Mastic and Intumescent Fire-resistant Coatings | RICHARD GREENWALD | special |
| 08/07/2026 | Wall Panels, Curtain Walls, and Veneers | RICHARD GREENWALD | special |
| 08/07/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 08/07/2026 | Fenestration and door U-factor and product ratings | RICHARD GREENWALD | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| 8S OSen Club | Other | Floor 1 | Project Q01441712 |
| USTA | Fitness / Recreation | Floors 1–5, Roof | Project Q01426081 Project Q01344550 Project Q01112633 Project Q01038482 Project Q08006387 Project Q00782179 Project Q00609093 Project Q00591922 Project Q00584831 Project Q00551826 Project Q00501065 |
| Hong Kong Dragon Boat Festival | Other | — | Project Q01255302 Project Q01077795 Project Q00910900 Project Q00566807 Project Q00563855 |
| Arthur Ashe Stadium | Fitness / Recreation | Floors 1–7, Roof | Project Q01222548 |
| USTA Arthur Ashe | Fitness / Recreation | Floors 1–5 | Project Q01092873 Project Q00919087 Project Q00794000 Project Q00564775 |
| West Media | Office | Floor 1 | Project Q00794816 |
| J.S.T.A. National Tennis Center | Restaurant / Food Service | Floor 3 | Project Q00146174 |