← Back
Banking facility, with or without parking
56-05 69 STREET
QUEENS · Maspeth · BIN 4058514
💬 Discuss this project
1956Year Built
2Stories
K7Building Class
R6BZoning
11,832 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Banking facility, with or without parking · 6,490 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof4p · 4 filings · 14 docs
Bulkhead1p · 1 filing · 2 docs
Floor 21p · 1 filing · 2 docs
Floor 1Under Construction6p · 2 filings · 4 docs
Cellar2p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MASPETH FEDERAL SAVINGS2009/12/2026
MASPETH FEDERAL SAVINGS BANK603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCULUS CONSULTING GROUP503/21/2026
A1 EXPEDITING SERVICE203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.M. HUGHES CO. INCGeneral Contractor309/12/2026
CARA PLUMBING GROUP INCPlumbing307/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor107/08/2026
QUINN & FEINER SVC CO.INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930201/07/2025
NEW YORK ENGINEERING ASSO851104/06/2022
Building Lifecycle
All (48)Filed (9)Permit Issued (7)Signed Off (6)Violation (10)Inspection (7)Special Inspection (9)
09/10/2026
Permit issued — General Construction
Q01417142-I1-GC
07/10/2026
Filed — Alteration
NEW EXTERIOR FACADE MODIFICATIONS ON 69 ST AS NOTED ON DRAWINGS. WINDOW REPLACEMENT ON 69 ST FACADE. NEW CANOPY AT FRONT ENTRY. FACADE REPAIRS TO EAST & SOUTH ELEVATIONS. PARTIAL INTERIOR ALTERATION IN ENTRY VESTIBULE. NO CHANGE IN USE,OCCUPANCY OR EGRESS
Q01417142-I1
05/06/2026
Signed off — Alteration
FILING MADE FOR REPAIR OF SEL PORTIONS OF PARAPETS ON THE N/S/E FACADES. RAISING SEL PARAPET HEIGHTS; RAILING INSTALL ALONG THE WEST FACADE. WORK INCL NEW ROOF INSTALL OVER EX ROOF SYS AT THE MAIN BLDG ROOF & STAIR BULKHEAD. NO CHANGE IN USE OCC OR EGRESS
Q00883027-I1
01/08/2026
Signed off — Alteration
PLUMBING FILING FOR BACKWATER VALVE AT EXISTING BANK (CELLAR LEVEL). NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00735232-I1
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2025
Violation issued (FDNY_ORDER, closed)
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2025
Violation issued (FDNY_ORDER, closed)
06/24/2025
Violation issued (FDNY_NOV, closed)
03/24/2025
Signed off — Alteration
INSTALLATION OF NEW STORM WATER PIPING FROM LOAN CENTER BLDG (LOT 7) TO ADJACENT LOAN CENTER NORTH BLDG (LOT 13). NO CHANGE TO USE, EGRESS OR OCCUPANCY. (NOTE THAT THE DETENTION TANK IS SHARED BY BOTH BLDGS AND LOCATED UNDER THE BLDG ON ADJACENT LOT 13)
Q01001137-I1
03/18/2025
Permit issued — Plumbing
Q00735232-I1-PL
02/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
01/07/2025
Filed — Alteration
INSTALLATION OF NEW STORM WATER PIPING FROM LOAN CENTER BLDG (LOT 7) TO ADJACENT LOAN CENTER NORTH BLDG (LOT 13). NO CHANGE TO USE, EGRESS OR OCCUPANCY. (NOTE THAT THE DETENTION TANK IS SHARED BY BOTH BLDGS AND LOCATED UNDER THE BLDG ON ADJACENT LOT 13)
Q01001137-P1
12/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Permit issued — Plumbing
Q01001137-I1-PL
07/11/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00917356-I1
05/15/2024
Signed off — Alteration
INSTALLATION OF NEW ROOF DRAINS AT EXISTING ROOF LEVEL AT EXISTING BANK. CONNECT TO EXISTING PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00883037-I1
04/18/2024
Violation issued (FDNY_NOV, closed)
04/05/2024
Filed — Alteration
INSTALLATION OF NEW STORM WATER PIPING FROM LOAN CENTER BLDG (LOT 7) TO ADJACENT LOAN CENTER NORTH BLDG (LOT 13). NO CHANGE TO USE, EGRESS OR OCCUPANCY. (NOTE THAT THE DETENTION TANK IS SHARED BY BOTH BLDGS AND LOCATED UNDER THE BLDG ON ADJACENT LOT 13)
Q01001137-I1
09/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/05/2023
Permit issued — Plumbing
Q00883037-I1-PL
08/10/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00917356-I1
08/10/2023
Permit issued — Sidewalk Shed
Q00917356-I1-SH
07/25/2023
Permit issued — General Construction
Q00883027-I1-GC
06/16/2023
Filed — Alteration
FILING MADE FOR REPAIR OF SEL PORTIONS OF PARAPETS ON THE N/S/E FACADES. RAISING SEL PARAPET HEIGHTS; RAILING INSTALL ALONG THE WEST FACADE. WORK INCL NEW ROOF INSTALL OVER EX ROOF SYS AT THE MAIN BLDG ROOF & STAIR BULKHEAD. NO CHANGE IN USE OCC OR EGRESS
Q00883027-I1
06/16/2023
Filed — Alteration
INSTALLATION OF NEW ROOF DRAINS AT EXISTING ROOF LEVEL AT EXISTING BANK. CONNECT TO EXISTING PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00883037-I1
01/17/2023
Signed off — Alteration
REPLACE ROOFTOP HVAC UNITS.
Q00693819-I1
05/12/2022
Filed — Alteration
PLUMBING FILING FOR BACKWATER VALVE AT EXISTING BANK (CELLAR LEVEL). NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00735232-I1
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
John Scheschareg
04/20/2022
Filed — Alteration
GAS CONNECTION TO REPLACEMENTROOFTOP HVAC UNITS.
Q00696181-I1
04/07/2022
Permit issued — Mechanical Systems
Q00693819-I1-MS
04/07/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/06/2022
Filed — Alteration
REPLACE ROOFTOP HVAC UNITS.
Q00693819-I1
03/08/2022
Special inspection requirement — Final
LOUIS ARENA
03/08/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/08/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/08/2022
Special inspection requirement — Mechanical Systems
LOUIS ARENA
06/26/2018
Violation issued (FDNY_ORDER, closed)
06/12/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/03/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2006
Violation issued (FDNY_ORDER, closed)
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedH.M. HUGHES CO. INC09/10/2026
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY03/18/2025
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY10/24/2024
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY09/05/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY08/10/2023
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC07/25/2023
DOB NOWMechanical SystemsSigned-offQUINN & FEINER SVC CO.INC04/07/2022
BISOTISSUEDACCORD POWER INC10/27/2023
BISFPISSUEDASSOCIATED FIRE PROT. INC09/06/2016
BISPLISSUEDLAB PLBG & HTG CO INC03/17/2005
BISMHISSUEDH.M. HUGHES CO. INC02/25/2005
BISSPISSUEDCAPITOL FIRE SPKL CO,INC12/08/2004
BIS—ISSUEDH.M. HUGHES CO. INC05/27/2004
BISEQRE-ISSUEDYORK SCAFFOLD EQUIPMENT CORP.05/06/2004
BIS—ISSUEDDAF CONTRACTING LTD09/20/1999
BISPLISSUEDZARA PLUMBING CORP03/25/1999
BISOTISSUEDDAF CONTRACTING LTD.10/28/1998
1 project · most recent 04/20/2022
Gas
FiledStatusContractorScope
04/20/2022——Gas
4 projects · most recent 11/09/2023
HVAC Wiring General Wiring
FiledStatusContractorScope
11/09/2023CompletePOWER SURGE ELECTRIC, INC—
08/08/2023CompleteHIGH QUALITY ELECTRIC OF—
12/16/2022CompleteGLEN OAKS ELEC'L INC.HVAC Wiring
03/08/2022Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/10/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/11/2022Energy Code Compliance InspectionsJohn Schescharegprogress
04/07/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
03/08/2022FinalLOUIS ARENAprogress
03/08/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
03/08/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/08/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/08/2022Maintenance informationLOUIS ARENAenergy_progress
03/08/2022Mechanical SystemsLOUIS ARENAspecial
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00693819-I1Request digital key ↗
08/26/2026Q00696181-I1Request digital key ↗
08/26/2026Q00735232-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION14
04/02/2024421254699Open ↗
10/26/2023440807325Open ↗
02/15/2023421249081Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION2
10/27/2023440807325Open ↗
09/09/2016421254699Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00693819-I1Open ↗
08/26/2026Q00735232-I1Open ↗
08/24/2026Q00883027-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00693819-I1Open ↗
09/01/2026Q00693819-I1Open ↗
09/01/2026Q00735232-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00693819-I1Open ↗
08/24/2026Q01001137-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2023440807325Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
10/27/2023440807325Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/26/2016421249081Open ↗
01/12/2016421254699Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/27/2024440807325Open ↗
10/26/2023440807325Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/27/2024440807325Open ↗
08/26/2024440807325Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
08/29/2024440807325Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/26/2023440807325Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00693819-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00693819-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/27/2024440807325Open ↗
10/26/2023440807325Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
01/12/2016421254699Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/29/2024440807325Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/29/2024440807325Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/27/2024440807325Open ↗
10/26/2023440807325Open ↗
02/26/2016421249081Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
02/26/2016421249081Open ↗
01/12/2016421254699Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/25/2023440807325Open ↗
▸BISADDITIONAL INFORMATION1
10/26/2023440807325Open ↗