← Back
QUEENS
56-11 228 STREET
QUEENS · BIN 4161278
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing
Cellar1p · 1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.107/22/2026
MEI ARCHITECT PLLC107/21/2026
Building Lifecycle
All (32)Filed (2)Objection (5)Special Inspection (25)
09/11/2026
Objection raised — Admin
09/11/2026
Objection raised — Energy
09/11/2026
Objection raised — Zoning
09/11/2026
Objection raised — Zoning
09/11/2026
Objection raised — Scope
07/22/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01422532-I1
07/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT OF AN EXISTING 1-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01422528-I1
07/17/2026
Special inspection requirement — Ventilation and air distribution system
07/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2026
Special inspection requirement — Heating Systems
07/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/17/2026
Special inspection requirement — Protection of exposed foundation insulation
07/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/17/2026
Special inspection requirement — Air barrier — testing
07/17/2026
Special inspection requirement — Air barrier - visual inspection
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/17/2026
Special inspection requirement — Insulation placement and R values
07/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/17/2026
Special inspection requirement — Maintenance information
07/17/2026
Special inspection requirement — Interior lighting power
07/17/2026
Special inspection requirement — Fenestration air leakage
07/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/17/2026
Special inspection requirement — Metering
07/17/2026
Special inspection requirement — Fenestration areas
07/17/2026
Special inspection requirement — Permanent certificate
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — Mechanical Systems
Nothing on file for this building.
1 project · most recent 07/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×2
MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/22/2026
Fence
FiledStatusContractorScope
07/22/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/17/2026Ventilation and air distribution system—energy_progress
07/17/2026Structural Stability – Alterations of existing buildings—special
07/17/2026Fire-Resistant Penetrations and Joints—special
07/17/2026Heating Systems—special
07/17/2026Subsurface Investigations (Borings/Test Pits)—special
07/17/2026Protection of exposed foundation insulation—energy_progress
07/17/2026HVAC-R and service water heating equipment—energy_progress
07/17/2026Energy Code Compliance Inspections—progress
07/17/2026Fire-Resistance Rated Construction—progress
07/17/2026HVAC-R and service water heating system controls—energy_progress
07/17/2026Air barrier — testing —energy_progress
07/17/2026Air barrier - visual inspection—energy_progress
07/17/2026HVAC-R and service water piping design and insulation—energy_progress
07/17/2026Insulation placement and R values—energy_progress
07/17/2026Duct leakage testing, insulation and design—energy_progress
07/17/2026Electric vehicle service equipment requirements—energy_progress
07/17/2026Maintenance information—energy_progress
07/17/2026Interior lighting power—energy_progress
07/17/2026Fenestration air leakage—energy_progress
07/17/2026Fenestration and door U-factor and product ratings—energy_progress
07/17/2026Metering—energy_progress
07/17/2026Fenestration areas—energy_progress
07/17/2026Permanent certificate—energy_progress
06/25/2026Final—progress
06/25/2026Mechanical Systems—special
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01422532-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION7
09/21/2021421428921Open ↗
11/21/2019421428921Open ↗
11/21/2019421562507Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
01/11/2018421562507Open ↗
12/08/2017421428921Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/11/2018421562507Open ↗
12/07/2017421428921Open ↗
12/07/2017421428921Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/21/2017421562507Open ↗
10/03/2017421428921Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/21/2017421562507Open ↗
10/03/2017421428921Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01422532-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/21/2017421428921Open ↗
11/21/2017421562507Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
12/08/2017421428921Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
01/11/2018421562507Open ↗
11/21/2017421562482Open ↗
10/03/2017421428921Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/21/2017421562507Open ↗
10/03/2017421428921Open ↗
▸Inspections & Test Reports4
▸BISBORINGS / TEST PITS (TR-4) 27-7202
01/12/2018421562507Open ↗
01/10/2018421428921Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
01/11/2018421562507Open ↗
12/07/2017421428921Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/19/2018421562482Open ↗
01/19/2018421562482Open ↗
11/22/2017421562482Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/10/2018421562507Open ↗
11/21/2017421428921Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
11/21/2017421562507Open ↗
11/21/2017421562482Open ↗
10/02/2017421428921Open ↗
▸BISBOROUGH INTAKE FORM1
04/08/2019421562507Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/19/2018421562482Open ↗