Condo, residential tower (mixed-use, multi-family elevator) [derived]
Gotham Point Condominium
56-28 2ND STREET · BIN 4624597
💬 Discuss this project
2020Year Built
33Stories
RMBuilding Class
R10Zoning
767,067 sfGross Floor Area
1,138Units
LL97 CoveredRent Stabilized0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: SOUTH POINT HOUSING DEVELOPMENT FUND COR PORATION · 52,237 sf lot · 14.68 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 17 docs
Floor 332p · 1 filing · 17 docs
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 22p · 1 filing · 17 docs
Floor 1Under Construction3p · 1 filing · 18 docs
1 job · most recent 05/08/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2025Permit IssuedTOP HAT CONSTR NEW YORKHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric TQHYP1443AL41AN 144,000 BTU · Vrf Outdoor ×1
Ventilation
Mitsubishi Electric TPEFYP036MA144A 36,000 BTU · Vrf Indoor ×3
TLGHF1200RVX02A 1,200 CFM · Erv ×1
TPEFYP048MA144A 48,000 BTU · Vrf Indoor ×1
1 job · most recent 05/08/2025
Sprinkler System
FiledStatusContractorScope
05/08/2025Permit IssuedARCO PLBG AND HTG INCSprinkler System
1 job · most recent 05/08/2025
Water/Sanitary
FiledStatusContractorScope
05/08/2025Permit IssuedARCO PLBG AND HTG INCWater/Sanitary
3 jobs · most recent 04/12/2026
General Wiring
FiledStatusContractorScope
04/12/2026Permit IssuedINFINITI ELECTRIC CORPGeneral Wiring
05/10/2024Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
08/30/2023Permit IssuedHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
Building Lifecycle
All (54)Filed (10)Permit Issued (6)Signed Off (3)Violation (1)Inspection (8)Objection (4)Special Inspection (22)
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
C
04/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2026
Permit issued — Sprinklers
Q01178190-S3-EW-SP
03/31/2026
Permit issued — Plumbing
Q01178190-S2-PL
03/26/2026
Permit issued — General Construction
Q01178190-I1-GC
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Other
05/08/2025
Filed — Alteration
INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANCHES/HEADS, RELATED AND SUBSEQUENT TO Q01178190-I1
Q01178190-S3
05/08/2025
Filed — Alteration
INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANCHES/HEADS, RELATED AND SUBSEQUENT TO Q01178190-I1
Q01178190-S1
05/08/2025
Filed — Alteration
INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANCHES/HEADS, RELATED AND SUBSEQUENT TO Q01178190-I1
Q01178190-S2
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
05/08/2025
Special inspection requirement — Maintenance information
Roger Tan
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/07/2025
Special inspection requirement — Shutoff dampers
Roger Tan
05/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
05/07/2025
Special inspection requirement — Maintenance information
Roger Tan
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
03/24/2025
Objection resolved — Addressed
03/24/2025
Special inspection requirement — Mechanical Systems
Roger Tan
03/24/2025
Special inspection requirement — Sprinkler Systems
Roger Tan
03/24/2025
Special inspection requirement — Final
Roger Tan
03/19/2025
Objection raised — Other
03/17/2025
Filed — Alteration
INTERIOR ALTERATIONS TO SPRINKLER SYSTEM IN GROUND FL UNIT, INCLUDING NEW SPRINKLER BRANCH LINES AND HEADS AND RELOCATIONS OF EXISTING SPRINKLER BRANCHES/HEADS, RELATED AND SUBSEQUENT TO Q01178190-I1
Q01178190-I1
02/07/2025
Special inspection requirement — Interior lighting power
MARLISA WISE
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARLISA WISE
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
MARLISA WISE
02/07/2025
Special inspection requirement — Lighting controls
MARLISA WISE
04/17/2024
Signed off — Alteration
Q01015662-I1
03/25/2024
Permit issued — Suspended Scaffold
Q01015662-I1-SC
03/22/2024
Filed — Alteration
Q01015662-I1
02/22/2024
Filed — Alteration
Q01009503-I1
02/22/2024
Permit issued — Suspended Scaffold
Q01009503-I1-SC
03/11/2022
Signed off — Alteration
Q00428082-S1
03/11/2022
Signed off — Alteration
Q00428082-I1
10/08/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/04/2021
Permit issued — Boiler Equipment
Q00428082-S1-BE
09/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/25/2021
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
09/25/2021
Special inspection requirement — HVAC and service water heating system controls
JOHN MCMONAGLE
09/25/2021
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/25/2021
Special inspection requirement — HVAC and service water heating equipment
JOHN MCMONAGLE
09/25/2021
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
09/22/2021
Filed — Alteration
Q00428082-P2
09/22/2021
Filed — Alteration
Q00428082-P1
03/24/2021
Filed — Alteration
Q00428082-S1
01/21/2021
Filed — Alteration
Q00428082-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK XS SERVICES INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ENGINEERING PC305/08/2025
INTERVAL PROJECTS103/17/2025
OSPINO ENGINEERING PLLC102/22/2024
COSENTINI ASSOCIATES409/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INTERVAL PROJECTS303/21/2026
A1 EXPEDITING SERVICE CORP.403/21/2026
AO CONSULTING AND DRAFTING203/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUSTAVE DILEO, JR.Electrical103/21/2026
HAL OZKURTElectrical103/21/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
TOP HAT CONSTR NEW YORKGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
ARIEL SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291305/08/2025
INTERVAL PROJECTS ARCHITE8739103/17/2025
DOMANI INSPECTION SERVICE843209/22/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC03/31/2026
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedTOP HAT CONSTR NEW YORK03/26/2026
DOB NOWSuspended ScaffoldSigned-offRIGGING CONSULTANTS INC03/25/2024
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC02/22/2024
DOB NOWBoiler EquipmentSigned-offDG MECHANICAL HEATING INC10/04/2021
BISOTISSUEDGILBANE RESIDENTIAL CONST02/28/2023
BIS—ISSUEDGILBANE RESIDENTIAL CONST06/21/2021
BIS—ISSUEDGILBANE RESIDENTIAL CONST02/08/2021
BIS—ISSUEDGILBANE RESIDENTIAL CONST01/13/2021
BIS—ISSUEDGILBANE RESIDENTIAL CONST08/25/2020
BIS—ISSUEDGILBANE RESIDENTIAL CONST08/10/2020
BIS—ISSUEDGILBANE RESIDENTIAL CONST07/09/2020
BIS—ISSUEDGILBANE RESIDENTIAL CONST07/08/2020
BIS—ISSUEDGILBANE RESIDENTIAL CONST07/08/2020
BIS—ISSUEDGILBANE RESIDENTIAL CONST01/14/2020
BIS—RE-ISSUEDGILBANE RESIDENTIAL CONST01/14/2020
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/08/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/08/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
05/08/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/08/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
05/08/2025Maintenance informationRoger Tanenergy_progress
05/08/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/07/2025Shutoff dampersRoger Tanenergy_progress
05/07/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
05/07/2025Maintenance informationRoger Tanenergy_progress
05/07/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
03/24/2025Mechanical SystemsRoger Tanspecial
03/24/2025Sprinkler SystemsRoger Tanspecial
03/24/2025FinalRoger Tanprogress
02/07/2025Interior lighting powerMARLISA WISEenergy_progress
02/07/2025Fire-Resistant Penetrations and JointsMARLISA WISEspecial
02/07/2025Energy Code Compliance InspectionsMARLISA WISEprogress
02/07/2025Lighting controlsMARLISA WISEenergy_progress
09/25/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/25/2021Heating SystemsJOHN MCMONAGLEspecial
09/25/2021HVAC and service water heating system controls JOHN MCMONAGLEenergy_progress
09/25/2021Maintenance informationJOHN MCMONAGLEenergy_progress
09/25/2021HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
09/25/2021Shutoff dampersJOHN MCMONAGLEenergy_progress
▾Documents — 289 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/27/2026Q00428082-P2Request digital key ↗
08/27/2026Q00428082-S1Request digital key ↗
08/23/2026Q01009503-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/27/2026Q00428082-I1Request digital key ↗
08/15/2026Q00428082-P1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION41
10/29/2025440685965Open ↗
06/09/2023420665355Open ↗
05/31/2023420665355Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION9
02/28/2023440685965Open ↗
03/25/2021420665355Open ↗
03/25/2021420665355Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/02/2021420665355Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
06/12/2023420665355Open ↗
12/11/2019420665355Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/28/2022420665355Open ↗
▸BISVERIFY TAX LOT1
07/10/2023420665355Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/29/2022420665355Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q00428082-I1Open ↗
09/23/2026Q00428082-I1Open ↗
09/23/2026Q00428082-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
01/21/2020420665355Open ↗
01/21/2020420665355Open ↗
01/21/2020420665355Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00428082-I1Open ↗
08/27/2026Q00428082-S1Open ↗
08/20/2026Q01178190-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q00428082-I1Open ↗
09/23/2026Q00428082-I1Open ↗
08/28/2026Q01178190-S3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/18/2021440685965Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2021440685965Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS1
01/09/2023420665355Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
01/20/2023420665355Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/28/2022420665355Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/20/2023420665355Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/28/2022420665355Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/20/2023420665355Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
12/28/2022420665355Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
12/27/2022420665355Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/21/2020420665355Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/16/2021420665355Open ↗
09/21/2021420665355Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00428082-I1Open ↗
08/13/2026Q00428082-S1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/28/2022420665355Open ↗
▸BISINTERIOR LIGHTING POWER1
12/28/2022420665355Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/28/2022420665355Open ↗
▸BISFENESTRATION AREAS1
12/28/2022420665355Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00428082-I1Open ↗
▸Inspections & Test Reports48
▸BISTECHNICAL REPORT: RESPONSIBILITY22
11/19/2021420665355Open ↗
11/16/2021420665355Open ↗
11/16/2021420665355Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
12/11/2020420665355Open ↗
12/11/2020420665355Open ↗
12/11/2020420665355Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/11/2023420665355Open ↗
01/21/2020420665355Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
12/27/2022420665355Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/27/2022420665355Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/11/2023420665355Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
12/28/2022420665355Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/28/2022420665355Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/28/2022420665355Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/27/2022420665355Open ↗
▸BISMASONRY1
12/28/2022420665355Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/28/2022420665355Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/28/2022420665355Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/28/2023440685965Open ↗
▸Approvals, Objections & Sign-offs33
▸BISLETTERS - SUPPORTING DOCUMENTATION15
03/25/2021420665355Open ↗
11/12/2020420665355Open ↗
11/05/2020420665355Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
06/09/2023420665355Open ↗
05/31/2023420665355Open ↗
07/21/2022420665355Open ↗
Showing 3 of 14 on file for this type
▸BISFINAL2
02/28/2023440685965Open ↗
02/28/2023440685965Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/15/2023440685965Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
01/20/2023420665355Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/12/2020420665355Open ↗
11/05/2020420665355Open ↗
07/27/2020420665355Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
03/25/2021420665355Open ↗
▸BISCOST AFFIDAVIT1
08/18/2021440685965Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/28/2023440685965Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION15
06/12/2023420665355Open ↗
01/20/2023420665355Open ↗
07/27/2022420665355Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
10/05/2022420665355Open ↗
03/25/2021420665355Open ↗
03/25/2021420665355Open ↗
Showing 3 of 6 on file for this type
▸Other Documents14
▸BISTCO - Supporting Documents2
01/19/2023420665355Open ↗
03/25/2022420665355Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/07/2020420665355Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026Q01009503-I1Open ↗
08/13/2026Q01015662-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01015662-I1Open ↗
08/13/2026Q01009503-I1Open ↗
▸BISOPEN AREA RESTRIC DEC1
01/07/2020420665355Open ↗
▸BISPRELIMINARY1
12/28/2022420665355Open ↗
▸BISSHUTOFF DAMPERS1
12/28/2022420665355Open ↗
▸BISLOWEST FLOOR ELEVATION1
12/28/2022420665355Open ↗
▸BISVESTIBULES1
12/28/2022420665355Open ↗
▸BISMAINTENANCE INFORMATION1
12/28/2022420665355Open ↗