← Back
Two stories - detached, small or mid-size
56-48 219 STREET
QUEENS · BIN 4160293
💬 Discuss this project
1960Year Built
1Stories
A1Building Class
R2AZoning
1,987 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: LIC FOOD HALL LLC · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2024$900K—— → —$453/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AN SHEN MA ARCHITECT407/18/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NTF MANAGEMENT INCGeneral Contractor807/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AN SHEN MA ARCHITECT2968307/18/2025
Building Lifecycle
All (62)Filed (4)Permit Issued (5)Signed Off (2)Inspection (7)Objection (14)Special Inspection (30)
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2025
Signed off — Alteration CO
TO INSTALL OR RELOCATE PLUMBING FIXTURES IN ALTERED 2 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ HOUSE ALT-CO #Q01114128-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01114128-S1
08/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2025
Signed off — Alteration
Q01114100-I1
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
07/25/2025
Special inspection requirement — Fenestration air leakage
AN MA
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
07/25/2025
Special inspection requirement — Structural Steel - Details
AN MA
07/25/2025
Special inspection requirement — Mechanical Systems
AN MA
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
AN MA
07/25/2025
Special inspection requirement — Concrete - Cast-In-Place
AN MA
07/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
AN MA
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
07/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
AN MA
07/25/2025
Special inspection requirement — Final
AN MA
07/25/2025
Special inspection requirement — Footing and Foundation
AN MA
07/25/2025
Special inspection requirement — Structural Wood Frame
AN MA
07/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
AN MA
07/25/2025
Special inspection requirement — Air barrier - visual inspection
AN MA
07/25/2025
Special inspection requirement — Ventilation and air distribution system
AN MA
07/25/2025
Special inspection requirement — Maintenance information
AN MA
07/25/2025
Special inspection requirement — Fenestration areas
AN MA
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
07/25/2025
Special inspection requirement — Interior lighting power
AN MA
07/25/2025
Special inspection requirement — Electric vehicle service equipment requirements
AN MA
07/25/2025
Special inspection requirement — Permanent certificate
AN MA
07/25/2025
Special inspection requirement — Insulation placement and R values
AN MA
07/18/2025
Filed — Alteration CO
TO INSTALL OR RELOCATE PLUMBING FIXTURES IN ALTERED 2 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ HOUSE ALT-CO #Q01114128-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01114128-P1
07/17/2025
Special inspection requirement — Interior lighting power
AN MA
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
07/17/2025
Special inspection requirement — Mechanical Systems
AN MA
07/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
AN MA
07/17/2025
Special inspection requirement — Structural Steel - Details
AN MA
07/17/2025
Special inspection requirement — Structural Steel - High Strength Bolting
AN MA
07/14/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/05/2025
Permit issued — Foundation
Q01114128-I1-GC-CX
03/05/2025
Permit issued — Construction Fence
Q01114100-I1-FN
02/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2024
Permit issued — Plumbing
Q01114128-S1-PL
12/02/2024
Permit issued — General Construction
Q01114128-I1-GC-CX
11/27/2024
Filed — Alteration CO
TO INSTALL OR RELOCATE PLUMBING FIXTURES IN ALTERED 2 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ HOUSE ALT-CO #Q01114128-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01114128-S1
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Zoning
10/21/2024
Objection raised — Zoning
10/21/2024
Objection raised — Zoning
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Zoning
10/21/2024
Objection raised — Zoning
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Zoning
10/04/2024
Filed — Alteration CO
TO INSTALL OR RELOCATE PLUMBING FIXTURES IN ALTERED 2 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ HOUSE ALT-CO #Q01114128-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01114128-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedNTF MANAGEMENT INC03/05/2025
DOB NOWConstruction FenceSigned-offNTF MANAGEMENT INC03/05/2025
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP12/09/2024
DOB NOWGeneral ConstructionPermit IssuedNTF MANAGEMENT INC12/02/2024
DOB NOWConstruction FenceSigned-offNTF MANAGEMENT INC09/23/2024
1 project · most recent 07/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2025Permit IssuedNTF MANAGEMENT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM42NAMHZ 42,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 07/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/18/2025Signed-offRGL PRO CONTRACTING LLCGas, Storm, Water/Sanitary
1 project · most recent 12/11/2024
General Wiring
FiledStatusContractorScope
12/11/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 07/18/2025
Wood
FiledStatusContractorScope
07/18/2025Permit IssuedNTF MANAGEMENT INCWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2025Pass-Final PL - UndergroundPassView ↗
02/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/25/2025HVAC-R and service water heating equipmentAN MAenergy_progress
07/25/2025Fenestration air leakageAN MAenergy_progress
07/25/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
07/25/2025Structural Steel - DetailsAN MAspecial
07/25/2025Mechanical SystemsAN MAspecial
07/25/2025Fire-Resistant Penetrations and JointsAN MAspecial
07/25/2025Structural Stability – Alterations of existing buildingsAN MAspecial
07/25/2025Concrete - Cast-In-PlaceAN MAspecial
07/25/2025Structural Steel - High Strength BoltingAN MAspecial
07/25/2025Energy Code Compliance InspectionsAN MAprogress
07/25/2025Fire-Resistance Rated ConstructionAN MAprogress
07/25/2025FinalAN MAprogress
07/25/2025Footing and FoundationAN MAprogress
07/25/2025Structural Wood FrameAN MAprogress
07/25/2025Fenestration and door U-factor and product ratingsAN MAenergy_progress
07/25/2025Air barrier - visual inspectionAN MAenergy_progress
07/25/2025Ventilation and air distribution systemAN MAenergy_progress
07/25/2025Maintenance informationAN MAenergy_progress
07/25/2025Fenestration areasAN MAenergy_progress
07/25/2025HVAC-R and service water heating system controlsAN MAenergy_progress
07/25/2025Interior lighting powerAN MAenergy_progress
07/25/2025Electric vehicle service equipment requirementsAN MAenergy_progress
07/25/2025Permanent certificateAN MAenergy_progress
07/25/2025Insulation placement and R valuesAN MAenergy_progress
07/17/2025Interior lighting powerAN MAenergy_progress
Latest 25 of 51.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01114100-I1Request digital key ↗
08/19/2026Q01114128-P1Request digital key ↗
08/19/2026Q01114128-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q01114128-P1Open ↗
08/27/2026Q01114128-P1Open ↗
08/27/2026Q01114128-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026Q01114128-P1Open ↗
08/19/2026Q01114128-S1Open ↗
08/19/2026Q01114128-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026Q01114128-P1Open ↗
08/25/2026Q01114128-S1Open ↗
08/23/2026Q01114128-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026Q01114128-S1Open ↗
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWPlot Diagram2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01114128-P1Open ↗
08/14/2026Q01114128-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026Q01114128-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q01114128-I1Open ↗