← Back
One family attached or semi-detached
56 BENJAMIN DRIVE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5093645
💬 Discuss this project
1988Year Built
3Stories
A5Building Class
R3-2Zoning
1,595 sfGross Floor Area
1Units
One family attached or semi-detached · 1,656 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/30/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
11/04/2024
Permit issued — Solar
S01134287-I1-SL
10/30/2024
Filed — Alteration
S01134287-I1
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/29/2024
Special inspection requirement — Final
Walid Abdulla
10/29/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC11/04/2024
1 project · most recent 10/30/2024
FiledStatusContractorScope
10/30/2024Permit IssuedSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/29/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/29/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/29/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/29/2024FinalWalid Abdullaprogress
10/29/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01134287-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026S01134287-I1Open ↗
08/27/2026S01134287-I1Open ↗
08/27/2026S01134287-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01134287-I1Open ↗
08/27/2026S01134287-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01134287-I1Open ↗