💬 Discuss this project
1878Year Built
5Stories
C5Building Class
R8BZoning
6,630 sfGross Floor Area
9Units
Rent Stabilized28 Active Violations 24 unresolved · 4 paperwork only 2 old, status unconfirmed ▸
Converted dwellings or rooming house · Owner of record: 56 East 66th Street Residence · 2,008 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof11p · 2 filings · 20 docs
Floor 514p · 2 filings · 20 docs
Floor 4Material chute installation16p · 3 filings · 20 docs
Floor 3Material chute installation17p · 3 filings · 20 docs
Floor 2Material chute installation17p · 3 filings · 20 docs
Floor 1Material chute installation17p · 3 filings · 20 docs
Cellar15p · 2 filings · 20 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction43p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
56 E 66th Street2007/25/2026
56 East 66th St1203/21/2026
Ank Manhattan603/21/2026
Jag Cutsom Group503/22/2026
56 East 66th Street Residence103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2019$8.5M—— → —$1,282/sf building
05/05/2015$14.0M—56/66 REALTY, LLC → ANK MANHATTAN II, LLC$2,112/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf212/05/2025
MSM Engineering Services403/29/2025
Anz Consulting Engineering108/06/2024
Charles G. Michel Engineering204/19/2024
Nazzareno Callipo P.E303/18/2024
Enthink Engineers311/03/2021
Green Design506/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group603/21/2026
J Callahan Consulting203/21/2026
GZ NC Code Planning Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold4010/20/2026
Warren Ostroff ElectricElectrical703/21/2026
J.A.G. Custom GroupScaffold303/21/2026
J.A.G. Custom GroupGeneral Contractor303/21/2026
KG SprinklerFire Protection207/08/2026
MJM Construction AssociatesGeneral Contractor107/22/2026
Arco Plumbing and HeatingFire Protection107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803208/06/2024
Alan Margolin & Associates423104/19/2024
GZ & NC Code Consulting P7492103/18/2024
Building Lifecycle
All (140)Filed (20)Permit Issued (33)Signed Off (9)Violation (60)Inspection (2)Objection (6)Special Inspection (10)
10/19/2026
Permit issued — Supported Scaffold
M01264348-I1-SH
09/17/2026
Signed off — Alteration
REMOVAL OF EXISTING SPRINKLER HEADS. A NEW AUTOMATIC SPRINKLE R SYSTEM WILL BE INSTALLED AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANG E OF USE, EGRESS OR OCCUPANCY.
M00661284-I1
08/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY EGRESS STAIR FOR CONTINUATION OF CONSTRUCTION.
M00582281-S1
08/04/2026
Signed off — Alteration
M00620983-I1
07/27/2026
Permit issued — Supported Scaffold
M01264348-I1-SH
07/23/2026
Permit issued — Sprinklers
M00661284-I1-EW-SP
07/20/2026
Permit issued — Structural
M00582281-S1-ST
06/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01189589-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY EGRESS STAIR FOR CONTINUATION OF CONSTRUCTION.
M00582281-I1
04/29/2026
Violation issued (HPD, open)
A
03/10/2026
Permit issued — Protection and Mechanical Methods
M01189589-I1-PMM
12/05/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01264348-P1
11/17/2025
Violation issued (HPD, open)
I
08/14/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01078357-I1
08/01/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01264348-I1
08/01/2025
Permit issued — Sidewalk Shed
M01264348-I1-SH
08/01/2025
Permit issued — Sidewalk Shed
M01264348-I1-SF
07/21/2025
Permit issued — Sidewalk Shed
M01078357-I1-SH
06/10/2025
Permit issued — Sprinklers
M00661284-I1-EW-SP
06/04/2025
Violation issued (HPD, open)
A
04/10/2025
Signed off — Alteration
M00323005-I1
03/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01078357-P2
03/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01189589-I1
03/12/2025
Permit issued — Protection and Mechanical Methods
M01189589-I1-PMM
03/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2025
Permit issued — Construction Fence
M00323005-I1-FN
02/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01078357-P1
11/22/2024
Violation issued (HPD, open)
I
08/26/2024
Objection resolved — Addressed
08/21/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00580963-I1
08/16/2024
Permit issued — Supported Scaffold
M00580963-I1-SH
08/16/2024
Permit issued — Supported Scaffold
M00580963-I1-SF
08/13/2024
Objection raised — Scope
08/06/2024
Filed — Alteration
REMOVAL OF EXISTING SPRINKLER HEADS. A NEW AUTOMATIC SPRINKLE R SYSTEM WILL BE INSTALLED AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANG E OF USE, EGRESS OR OCCUPANCY.
M00661284-S1
07/25/2024
Permit issued — Sidewalk Shed
M01078357-I1-SH
07/25/2024
Permit issued — Sidewalk Shed
M01078357-I1-SF
07/24/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01078357-I1
05/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/01/2024
Permit issued — Sprinklers
M00661284-I1-EW-SP
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/22/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
04/19/2024
Filed — Alteration
REMOVAL OF EXISTING SPRINKLER HEADS. A NEW AUTOMATIC SPRINKLE R SYSTEM WILL BE INSTALLED AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANG E OF USE, EGRESS OR OCCUPANCY.
M00661284-P1
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/16/2024
Special inspection requirement — Sprinkler Systems
Young Suh
04/10/2024
Special inspection requirement — Final
Nazzareno Callipo
04/01/2024
Violation issued (HPD, open)
A
04/01/2024
Objection resolved — Addressed
03/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY EGRESS STAIR FOR CONTINUATION OF CONSTRUCTION.
M00582281-S1
03/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
03/18/2024
Special inspection requirement — Structural Cold-Formed Steel
Nazzareno Callipo
03/18/2024
Special inspection requirement — Final
Nazzareno Callipo
03/14/2024
Objection raised — Scope
03/04/2024
Filed — Alteration
INSTALLATION OF TEMPORARY EGRESS STAIR FOR CONTINUATION OF CONSTRUCTION.
M00582281-P1
02/29/2024
Permit issued — Construction Fence
M00323005-I1-FN
11/15/2023
Violation issued (HPD, open)
I
08/16/2023
Permit issued — Supported Scaffold
M00580963-I1-SH
08/16/2023
Permit issued — Supported Scaffold
M00580963-I1-SF
08/14/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR10/19/2026
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR07/27/2026
DOB NOWSprinklersSigned-offArco Plumbing and Heating07/23/2026
DOB NOWStructuralSigned-offMJM Construction Associates07/20/2026
DOB NOWProtection and Mechanical MethodsSigned-offPhoenix Sutton STR03/10/2026
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR08/01/2025
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR08/01/2025
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/21/2025
DOB NOWSprinklersSigned-offH M Sprinkler06/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offPhoenix Sutton STR03/12/2025
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR02/24/2025
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/16/2024
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/16/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/25/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/25/2024
DOB NOWSprinklersSigned-offH M Sprinkler05/01/2024
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR02/29/2024
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/16/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/16/2023
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR03/03/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/19/2022
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/19/2022
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR03/07/2022
DOB NOWProtection and Mechanical MethodsSigned-offJ.A.G. Custom Group11/04/2021
DOB NOWGeneral ConstructionSigned-offJ.A.G. Custom Group10/13/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR08/23/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR08/23/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/12/2021
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR03/10/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/10/2021
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/02/2020
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR03/02/2020
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/02/2020
BIS—ISSUEDRusk Renovations01/08/2026
BISPLISSUEDDonato Plumbing02/12/2025
BIS—ISSUEDRusk Renovations01/20/2025
BIS—ISSUEDRusk Renovations01/02/2025
BISPLISSUEDDonato Plumbing02/05/2024
BIS—ISSUEDRusk Renovations01/25/2024
BISPLISSUEDCBB Plumbing11/02/2023
+ 14 more permits on file
1 project · most recent 08/06/2024
FiledStatusContractorScope
08/06/2024Signed-offArco Plumbing and Heating—
1 project · most recent 08/06/2024
Gas
FiledStatusContractorScope
08/06/2024——Gas
6 projects · most recent 12/30/2025
General Wiring
FiledStatusContractorScope
12/30/2025CompleteWarren Ostroff ElectricGeneral Wiring
06/14/2024CompleteWarren Ostroff Electric1 meters, 1 new_meters
07/14/2023CompleteWarren Ostroff Electric—
12/09/2021Permit IssuedStar Electrical Contractors—
04/17/2020Permit IssuedE & M Electrical NYGeneral Wiring
11/18/2019Permit IssuedElpo Electrical Contg—
1 project · most recent 12/05/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/05/2025Permit IssuedPhoenix Sutton STRScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/06/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
04/22/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
04/22/2024Sprinkler SystemsSAMI HAJJAR P.Especial
04/16/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
04/16/2024Sprinkler SystemsYoung Suhspecial
04/10/2024FinalNazzareno Callipoprogress
03/18/2024Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
03/18/2024Structural Cold-Formed SteelNazzareno Callipospecial
03/18/2024FinalNazzareno Callipoprogress
06/21/2021FinalSunil Saigalprogress
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch15
09/03/2026M00580963-I1Request digital key ↗
09/03/2026M00580963-P1Request digital key ↗
09/03/2026M00620983-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/04/2026M00323002-I1Request digital key ↗
08/15/2026M00323002-P2Request digital key ↗
08/15/2026M00323002-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/04/2026M00323002-I1Request digital key ↗
08/15/2026M00323002-P3Request digital key ↗
08/15/2026M00323002-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00323005-I1Request digital key ↗
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION43
11/07/2025122551568Open ↗
10/01/2025122775130Open ↗
07/03/2025141027421Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION11
02/05/2024122399289Open ↗
11/03/2023122399289Open ↗
08/10/2023122399289Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M00582281-S1Open ↗
08/13/2026M00582281-P1Open ↗
08/13/2026M00582281-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
08/26/2025141027421Open ↗
07/03/2025141027421Open ↗
05/03/2016122775130Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/10/2025122399289Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM1
01/04/2016122399289Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/27/2017122399289Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/05/2026M00323005-I1Open ↗
09/03/2026M00580963-P1Open ↗
09/03/2026M00580963-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/12/2020122399289Open ↗
02/12/2020122399289Open ↗
02/12/2020122399289Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00661284-S1Open ↗
08/27/2026M00582281-S1Open ↗
08/27/2026M00661284-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00582281-I1Open ↗
08/27/2026M00323002-I1Open ↗
08/27/2026M00582281-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/22/2020140904467Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/03/2025141027421Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/22/2020140904467Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/22/2020140904467Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/03/2016122539716Open ↗
12/11/2015122539716Open ↗
10/13/2015122399289Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
05/21/2024122399289Open ↗
05/13/2024122399289Open ↗
05/07/2024122399289Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan5
08/13/2026M00323002-P1Open ↗
08/13/2026M00323002-P2Open ↗
08/13/2026M00323002-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
07/03/2025141027421Open ↗
05/13/2015122399289Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/03/2025141027421Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/22/2020140904467Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/12/2020122399289Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026M00661284-I1Open ↗
08/15/2026M00582281-I1Open ↗
08/15/2026M00661284-S1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/12/2020122399289Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/13/2020122399289Open ↗
02/12/2020122399289Open ↗
02/12/2020122399289Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/13/2024122399289Open ↗
04/06/2023122399289Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/18/2024122399289Open ↗
05/13/2024122399289Open ↗
04/06/2023122399289Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/12/2020122399289Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/12/2020122399289Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
02/03/2016122539716Open ↗
▸BISHYDRO FLOW TEST LETTER1
02/03/2016122539716Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION9
11/19/2024122399289Open ↗
11/19/2024122399289Open ↗
12/08/2021122399289Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER5
11/19/2024122399289Open ↗
05/14/2024122399289Open ↗
02/05/2024122399289Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
07/03/2025141027421Open ↗
05/22/2020140904467Open ↗
01/12/2016122399289Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
05/04/2023122399289Open ↗
05/13/2015122399289Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/09/2021140904467Open ↗
▸BISLANDMARKS SIGNOFF1
11/09/2021140904467Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/13/2015122551568Open ↗
10/13/2015122539716Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION11
11/19/2024122399289Open ↗
11/19/2024122399289Open ↗
11/19/2024122399289Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
05/03/2016122775130Open ↗
10/13/2015122551568Open ↗
10/13/2015122399289Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
08/10/2023122399289Open ↗
07/12/2023122399289Open ↗
12/08/2021122399289Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/03/2025141027421Open ↗
05/22/2020140904467Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
07/03/2025141027421Open ↗
05/03/2016122775130Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
04/06/2023122399289Open ↗
05/13/2015122399289Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/26/2025141027421Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/03/2025141027421Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/09/2021140904467Open ↗