Over six families without stores
Ft Greene
53 ST FELIX STREET · BIN 3326129
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6BZoning
27,530 sfGross Floor Area
32Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: FT GREENE TB HOUSING DEVELOPMENT FUND CO RPORATION · 11,990 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 7 docs
Floor 22p · 1 filing · 7 docs
Floor 12p · 1 filing · 7 docs
Basement3p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BLOCK ASSOCIATES203/22/2026
TRI BLOCK FTG LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING204/01/2025
CTA ARCHITECTS108/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MDG DESIGN & CONSTR LLCGeneral Contractor307/08/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004209/03/2024
Building Lifecycle
All (42)Filed (3)Permit Issued (3)Signed Off (2)Violation (6)Inspection (2)Objection (18)Special Inspection (8)
11/26/2025
Signed off — Alteration
Fixture replacements as per plans filed herewith. No change to use, egress, or occupancy.
B01094313-I1
10/07/2025
Signed off — Alteration
B01063491-I1
07/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
06/12/2025
Violation issued (HPD, closed)
A
04/01/2025
Filed — Alteration
Fixture replacements as per plans filed herewith. No change to use, egress, or occupancy.
B01094313-P1
03/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/31/2025
Permit issued — Plumbing
B01094313-I1-PL
01/30/2025
Permit issued — General Construction
B01063491-I1-GC
12/19/2024
Permit issued — General Construction
B01063491-I1-GC
10/11/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/03/2024
Filed — Alteration
Fixture replacements as per plans filed herewith. No change to use, egress, or occupancy.
B01094313-I1
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
09/02/2024
Objection raised — Other
08/20/2024
Filed — Alteration
B01063491-I1
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
08/05/2024
Special inspection requirement — Interior lighting power
ERIC BERLENT
08/05/2024
Special inspection requirement — Lighting in dwelling units
ERIC BERLENT
08/05/2024
Special inspection requirement — Lighting controls
ERIC BERLENT
08/05/2024
Special inspection requirement — Final
Christa Waring
08/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
05/08/2024
Violation issued (HPD, closed)
C
05/08/2024
Violation issued (HPD, closed)
A
06/08/2022
Violation issued (ECB, closed)
Construction
02/06/2009
Violation issued (ECB, closed)
Construction
02/06/2009
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP01/31/2025
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC01/30/2025
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC12/19/2024
1 project · most recent 05/07/2025
General Wiring
FiledStatusContractorScope
05/07/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/24/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
03/12/2025Tenant Protection Plan Compliance—special
08/12/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/05/2024Interior lighting powerERIC BERLENTenergy_progress
08/05/2024Lighting in dwelling unitsERIC BERLENTenergy_progress
08/05/2024Lighting controlsERIC BERLENTenergy_progress
08/05/2024FinalChrista Waringprogress
08/05/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01063491-I1Request digital key ↗
08/24/2026B01094313-I1Request digital key ↗
08/24/2026B01094313-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01063491-I1Open ↗
08/13/2026B01094313-I1Open ↗
08/13/2026B01094313-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01063491-I1Open ↗
09/01/2026B01063491-I1Open ↗
08/27/2026B01094313-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01063491-I1Open ↗
09/01/2026B01063491-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B01063491-I1Open ↗
08/13/2026B01094313-P1Open ↗