← Back
Office, 20+ stories, with or without commercial
60 Hudson Street
56 HUDSON STREET · BIN 1001572
💬 Discuss this project
1930Year Built
23Stories
O4Building Class
C6-2AZoning
802,000 sfGross Floor Area
144Units
LL97 Covered10 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: 60 HUDSON OWNERS LLC · 52,439 sf lot · 15.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 5 filings · 20 docs
Floor 251p · 1 filing · 7 docs
Floor 24
Floor 232p · 1 filing · 4 docs
Floor 2215p · 2 filings · 20 docs
Floor 212p · 1 filing · 8 docs
Floor 202p · 1 filing · 12 docs
Floor 191p · 1 filing · 12 docs
Floor 18
Floor 17
Floor 16
Floor 15Under Construction17p · 3 filings · 20 docs
Floor 143p · 1 filing · 6 docs
Floor 13Under Construction7p · 3 filings · 20 docs
Floor 124p · 4 filings · 20 docs
Floor 11Under Construction14p · 4 filings · 20 docs
Floor 102p · 1 filing · 20 docs
Floor 930p · 5 filings · 20 docs
Floor 81p · 3 filings · 6 docs
Floor 7
Floor 6Under Construction40p · 1 filing · 20 docs
Floor 53p · 3 filings · 18 docs
Floor 41p · 1 filing · 6 docs
Floor 39p · 3 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 1Under Construction16p · 8 filings · 20 docs
Cellar1p · 1 filing · 12 docs
Sub-Cellar1p · 1 filing · 12 docs
Basement7p · 6 filings · 20 docs
Sub-BasementUnder Construction6p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLLIERS INTERNATIONAL36408/29/2026
LEMX108/22/2026
GCC GENESIS CONSTRUCTION CORP.304/09/2026
60 HUDSON OWNER C/O COLLIERS49103/22/2026
JC CONTRACTING MGMT603/22/2026
60 HUDSON OWNERS LLC STAH103/22/2026
60 HUDSON OWNERS LLC DAVI403/22/2026
MANHATTAN D ENTERPRISES103/22/2026
OTIS ELEVATOR COMPANY103/22/2026
OWNER OF 60 HUHDSON ST103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES12103/21/2026
AE DESIGN SOLUTION403/21/2026
Rigid Structural Design, LLC203/21/2026
PATUXENT ENGINEERING803/21/2026
A1 EXPEDITING SERVICE403/21/2026
DVA Advisors603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPUTER COOL/ICE AGEGeneral Contractor2007/08/2026
UNITED PLBG MECHANICAL INCPlumbing1807/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor1408/13/2026
JC CONTRACTING.MGMT LLCGeneral Contractor1107/08/2026
UNITED PLBG MECHANICAL INCFire Protection907/08/2026
CURRENT FIRE PROTECTION INCFire Protection707/08/2026
OCEAN PACIFIC INTERIORS *General Contractor607/08/2026
AP MECHANICAL LLCGeneral Contractor603/21/2026
DONNELLY MECHANICAL CORPGeneral Contractor507/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
R G CONTRACTING NY LLCGeneral Contractor407/08/2026
PRECISION HOIST & SCAFFO*General Contractor407/08/2026
WILTON CONSTRUCTION MNGRSGeneral Contractor407/08/2026
AMC ELEC'L SERVICES, INC.Electrical303/22/2026
UNITED PLBG MECH INCGeneral Contractor307/08/2026
MAC FELDER INCPlumbing307/08/2026
FRANK LA GREGAElectrical303/21/2026
PETTINATO, JUSTINElectrical203/21/2026
REILLY, CHRISTOPHERElectrical203/21/2026
UNITED FIRE PROT CORPFire Protection207/08/2026
COOLING GUARD MECHANIC COGeneral Contractor203/21/2026
GCC GENESIS CONSTRUCTIONGeneral Contractor207/08/2026
HOLT CONSTRUCTION CORPGeneral Contractor203/21/2026
P.J. MECHANICAL CORPGeneral Contractor203/21/2026
SAFWAY ATLANTIC, LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RHL ENGINEERING, LLC7122607/09/2026
PAKNIA ENGINEERING, PC1462801/27/2026
EP INSPECTIONS AND COMMIS7079112/08/2025
SKYLINE ENGINEERING, PLLC267612/08/2025
JACK GREEN ASSOCIATES422211/04/2025
BEYOND ARCH LLC3600110/14/2025
RICHMOND TESTING LAB263107/09/2025
CHARLES B BREEN ASSOCIATE38121905/16/2025
CROSSCHECK INSPECTION SER544311/26/2024
JS BUILDING CONSULTING4959711/07/2024
Building Lifecycle
All (300)Filed (71)Permit Issued (57)Signed Off (24)Facade (FISP) (2)Violation (6)Inspection (31)Objection (79)Special Inspection (30)
09/04/2026
Filed — No Work
M01455118-I1
08/25/2026
Objection resolved — Resolved
08/21/2026
Permit issued — Sidewalk Shed
M01448683-I1-SH
08/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01448683-I1
08/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2026
Permit issued — General Construction
M01193243-I1-GC
08/12/2026
Permit issued — Structural
M01193243-S1-ST
08/12/2026
Permit issued — Mechanical Systems
M01193243-S2-MS
08/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/24/2026
Permit issued — Mechanical Systems
M01311365-I1-MS
07/21/2026
Permit issued — Suspended Scaffold
M01414616-I1-SC
07/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/14/2026
Objection raised — Scope
07/14/2026
Objection raised — Structural
07/14/2026
Objection resolved — Resolved
07/09/2026
Filed — Alteration
M01170533-S3
07/09/2026
Filed — Alteration
M01170533-I1
07/09/2026
Filed — Alteration
M01170533-S1
07/09/2026
Filed — Alteration
M01170533-S2
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/08/2026
Special inspection requirement — Lighting controls
RICHARD LEMANSKY
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
07/08/2026
Special inspection requirement — Sprayed fire-resistant materials
Vincent Gentile
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD LEMANSKY
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
07/08/2026
Special inspection requirement — Interior lighting power
RICHARD LEMANSKY
07/07/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01414616-I1
07/06/2026
Objection raised — Accessibility
06/30/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/22/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Resolved
06/11/2026
Objection resolved — Resolved
06/05/2026
Objection resolved — Resolved
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Resolved
06/05/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Resolved
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
06/02/2026
Special inspection requirement — Post-installed Anchors
06/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/29/2026
Objection raised — Accessibility
05/29/2026
Objection raised — Accessibility
05/29/2026
Objection raised — Accessibility
05/29/2026
Objection raised — Accessibility
05/29/2026
Objection raised — Accessibility
05/28/2026
Objection raised — Accessibility
05/28/2026
Objection raised — Accessibility
05/28/2026
Objection raised — Accessibility
05/28/2026
Objection raised — Accessibility
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedLEMX CORP08/21/2026
DOB NOWMechanical SystemsPermit IssuedCLUNE CONSTRUCTION CO LP08/12/2026
DOB NOWStructuralPermit IssuedCLUNE CONSTRUCTION CO LP08/12/2026
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP08/12/2026
DOB NOWMechanical SystemsPermit IssuedPENGUIN AIR CONDITIONING07/24/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S07/21/2026
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE05/07/2026
DOB NOWSprinklersPermit IssuedUNITED PLBG MECHANICAL INC02/09/2026
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN02/09/2026
DOB NOWMechanical SystemsSigned-offCOMPUTER COOL/ICE AGE02/03/2026
DOB NOWGeneral ConstructionSigned-offCOMPUTER COOL/ICE AGE02/03/2026
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE02/03/2026
DOB NOWGeneral ConstructionPermit IssuedODYSSIA GLOBAL COMM. CORP01/28/2026
DOB NOWGeneral ConstructionPermit IssuedWILTON CONSTRUCTION MNGRS01/23/2026
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN01/22/2026
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP01/12/2026
DOB NOWSprinklersPermit IssuedUNITED PLBG MECHANICAL INC12/18/2025
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN12/18/2025
DOB NOWMechanical SystemsSigned-offM.F. MALONE INC12/17/2025
DOB NOWMechanical SystemsPermit IssuedCLUNE CONSTRUCTION CO LP11/06/2025
DOB NOWStructuralPermit IssuedCLUNE CONSTRUCTION CO LP11/06/2025
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP11/05/2025
DOB NOWBoiler EquipmentPermit IssuedNEW YORK HEATING CORP10/22/2025
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN07/21/2025
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*07/21/2025
DOB NOWBoiler EquipmentPermit IssuedNEW YORK HEATING CORP06/23/2025
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE06/17/2025
DOB NOWMechanical SystemsSigned-offCOMPUTER COOL/ICE AGE05/01/2025
DOB NOWGeneral ConstructionSigned-offCOMPUTER COOL/ICE AGE05/01/2025
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*04/30/2025
DOB NOWMechanical SystemsPermit IssuedAINSWORTH INC04/04/2025
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*03/28/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRECISION HOIST & SCAFFO*03/21/2025
DOB NOWSupported ScaffoldSigned-offEAGLE SCAFFOLDING SVCS IN03/19/2025
DOB NOWMechanical SystemsSigned-offAP MECHANICAL LLC02/06/2025
DOB NOWMechanical SystemsSigned-offGCC GENESIS CONSTRUCTION01/30/2025
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC01/30/2025
DOB NOWGeneral ConstructionSigned-offGCC GENESIS CONSTRUCTION01/29/2025
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN01/23/2025
DOB NOWStructuralPermit IssuedCOMPUTER COOL/ICE AGE01/23/2025
+ 60 more permits on file
11 projects · most recent 05/06/2026
Air Conditioning Systems Generators Associated Ducts and Piping Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
05/06/2026——Air Conditioning Systems
Cooling
Climatemaster SR-120 122,600 BTU · Ahu ×1
05/06/2026——Air Conditioning Systems
Cooling
Climatemaster SR-036 34,400 BTU · Ahu ×1
05/05/2026——Air Conditioning Systems—
12/08/2025Permit IssuedPENGUIN AIR CONDITIONINGAir Conditioning Systems
Cooling
Liebert VS070W 9,600 BTU · Crac Unit ×1
10/14/2025Signed-offM.F. MALONE INCAir Conditioning Systems
Cooling
Liebert VS070WDA 248,000 BTU · Crac Unit ×2
03/27/2025Permit IssuedCOMPUTER COOL/ICE AGEGenerators
Generators
11/26/2024Signed-offCOMPUTER COOL/ICE AGECooling Towers
Cooling Tower
Baltimore Aircoil VT1-M610-P 9,146,390 BTU · Cooling Tower ×2
10/04/2024Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems—
11/29/2023——Associated Ducts and Piping—
11/22/2023——Associated Ducts and Piping—
06/04/2021——Generators
Generators
Kohler GMKD1500 1,500 kW · Generator ×2
GMKD1000 1,000 kW · Generator ×1
7 projects · most recent 12/08/2025
Sprinkler System
FiledStatusContractorScope
12/08/2025Permit IssuedASHLAR MECHANICAL CORP—
11/04/2025——5 heads
08/05/2025Permit IssuedUNITED PLBG MECHANICAL IN220 heads
10/17/2024——Sprinkler System
10/04/2024Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
11/29/2023——Sprinkler System
11/22/2023——Sprinkler System
5 projects · most recent 11/04/2025
Water/Sanitary
FiledStatusContractorScope
11/04/2025——Water/Sanitary
08/05/2025Signed-offUNITED PLBG MECHANICAL INWater/Sanitary
10/17/2024——Water/Sanitary
11/29/2023——Water/Sanitary
11/22/2023——Water/Sanitary
25 projects · most recent 09/29/2026
General Wiring Lighting
FiledStatusContractorScope
09/29/2026Permit IssuedCMAC ELECTRIC CORPGeneral Wiring
08/20/2026Permit IssuedRICHARD NEU—
03/20/2026Permit IssuedVERDE ELECTRIC CORP.General Wiring
11/20/2025CompleteVERDE ELECTRIC CORP.General Wiring
09/16/2025Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
03/19/2025CompleteNASH ELECTRIC SERVICES IN—
10/18/2024CompleteNEAD ELECTRIC INC.General Wiring
10/01/2024CompleteCMAC ELECTRIC CORPGeneral Wiring
03/11/2024CompleteR. GUNZER, INC.General Wiring
01/03/2024CompleteRAIKOS ELECTRIC LLCGeneral Wiring
10/30/2023CompleteHUGH O'KANE ELEC. CO. INCGeneral Wiring
10/12/2023CompleteHYLAN DATACOM & ELECL LLCGeneral Wiring, Lighting
07/31/2023CompleteCITYWIDE ELECTRICAL SVCSGeneral Wiring
08/18/2022CompleteHATZEL AND BUEHLER, INCGeneral Wiring
08/18/2021Complete5 J'S ELECTL CONTS CORP—
1 project · most recent 11/26/2024
Steel
FiledStatusContractorScope
11/26/2024Signed-offCOMPUTER COOL/ICE AGESteel
1 project · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 40
DateTypeResultReport
08/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 40.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and Joints—special
07/08/2026Sprayed fire-resistant materialsVincent Gentilespecial
07/08/2026Interior lighting powerRICHARD LEMANSKYenergy_progress
07/08/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
07/08/2026Fire-Resistance Rated ConstructionRICHARD LEMANSKYprogress
07/08/2026Fire-Resistant Penetrations and JointsVincent Gentilespecial
07/08/2026Lighting controlsRICHARD LEMANSKYenergy_progress
06/03/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
06/02/2026Duct leakage testing, insulation and design—energy_progress
06/02/2026Post-installed Anchors—special
05/04/2026Post-installed Anchors—special
04/24/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
04/24/2026Maintenance informationRICHARD LEMANSKYenergy_progress
04/24/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
04/24/2026Maintenance informationRICHARD LEMANSKYenergy_progress
04/24/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
04/24/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
04/24/2026Post-installed AnchorsVincent Gentilespecial
04/24/2026Post-installed AnchorsVincent Gentilespecial
04/24/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
04/24/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
04/24/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
04/20/2026FinalRICHARD LEMANSKYprogress
04/20/2026Mechanical SystemsVincent Gentilespecial
04/17/2026Mechanical SystemsVincent Gentilespecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
LumenOfficeBasement, Floors 1, 2, 12
Project M01170533 Alteration · Objections · 07/09/2026
Project M01109790 Alteration · Approved · 10/17/2024
DatabankOfficeFloor 12
Project M01073472 Alteration · LOC Issued · 08/01/2024
CenturyLinkOfficeFloors 1, 12
Project M00297394 Alteration · LOC Issued · 03/11/2020
Project M00297448 Alteration · LOC Issued · 03/10/2020
The SwitchOfficeFloor 2
Project M00263170 Alteration · LOC Issued · 12/03/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 6,807 on file (BIS + DOB NOW)
▸Plans & Drawings128
▸DOB NOWPlans/Sketch92
09/03/2026M00488230-I1Request digital key ↗
09/03/2026M00524102-I1Request digital key ↗
09/03/2026M00560048-P1Request digital key ↗
Showing 3 of 92 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler11
09/05/2026M00197633-I1Request digital key ↗
09/05/2026M00208840-I1Request digital key ↗
09/05/2026M00210569-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/05/2026M00197631-I1Request digital key ↗
09/05/2026M00278212-I1Request digital key ↗
09/05/2026M00278232-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
09/05/2026M00197728-I1Request digital key ↗
09/05/2026M00244078-I1Request digital key ↗
09/05/2026M00244078-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly5
09/15/2026M01455118-I1Request digital key ↗
08/29/2026M00920196-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits1,426
▸BISPLAN / WORK APPROVAL APPLICATION763
11/13/2024123050544Open ↗
04/15/2024121923213Open ↗
01/29/2024102137000Open ↗
Showing 3 of 763 on file for this type
▸BISWORK PERMIT APPLICATION585
05/01/2024101066800Open ↗
04/25/2024102842051Open ↗
03/28/2024102651435Open ↗
Showing 3 of 585 on file for this type
▸DOB NOWLPC Approval/Permit73
09/05/2026M00197728-I1Open ↗
09/05/2026M00197631-I1Open ↗
09/05/2026M00278223-I1Open ↗
Showing 3 of 73 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Seals & Professional Certifications1,267
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION839
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 839 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature127
09/15/2026M01455118-I1Open ↗
09/05/2026M00197728-I1Open ↗
09/05/2026M00197631-I1Open ↗
Showing 3 of 127 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature88
09/28/2026M00210569-I1Open ↗
09/23/2026M00415685-I1Open ↗
09/23/2026M00297430-I1Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWProgress Inspector Seal & Signature77
09/23/2026M01290620-I1Open ↗
09/23/2026M01290620-I1Open ↗
09/20/2026M01170533-I1Open ↗
Showing 3 of 77 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST51
09/15/2023102620638Open ↗
Showing 1 of 51 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISAPPLICANT OWNER SIGNATURE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Trade Schedules & Equipment818
▸BISEQUIPMENT USE PERMITS221
04/02/2024123169123Open ↗
04/02/2024123169123Open ↗
03/15/2024123169123Open ↗
Showing 3 of 221 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT129
04/02/2024123169123Open ↗
03/19/2024123169123Open ↗
Showing 2 of 129 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA124
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 124 on file for this type
▸BISSELF-CERT PLUMBING NOTICE108
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 108 on file for this type
▸BISSCHEDULE B - PLUMBING91
01/29/2024102137000Open ↗
12/19/2023102842051Open ↗
10/13/2023101998661Open ↗
Showing 3 of 91 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE88
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 88 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8524
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSPRINKLER SYSTEMS9
02/07/2024102842051Open ↗
02/07/2024102842051Open ↗
01/03/2024102651435Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos442
▸BISASBESTOS: CERTIFICATION (DEP ACP5)190
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 190 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 101 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report98
09/05/2026M00197728-I1Open ↗
09/05/2026M00197631-I1Open ↗
09/05/2026M00208840-I1Open ↗
Showing 3 of 98 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00488230-I1Open ↗
09/03/2026M00537610-I1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance93
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports124
▸BISTECHNICAL REPORT: RESPONSIBILITY88
01/04/2024101805227Open ↗
12/15/2023101805227Open ↗
12/15/2023101805227Open ↗
Showing 3 of 88 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19757
01/03/2024101805227Open ↗
12/07/2023101083104Open ↗
12/05/2023101066800Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
03/15/2024123169123Open ↗
01/03/2024120291282Open ↗
Showing 2 of 6 on file for this type
▸Approvals, Objections & Sign-offs891
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST348
07/25/2024102651435Open ↗
05/29/2024101998661Open ↗
05/24/2024102136975Open ↗
Showing 3 of 348 on file for this type
▸BISLANDMARKS APPROVAL262
12/08/2023101066800Open ↗
12/07/2023101083104Open ↗
12/05/2023100815860Open ↗
Showing 3 of 262 on file for this type
▸BISADMINISTRATIVE OBJECTIONS128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION71
04/15/2024121923213Open ↗
04/15/2024121923213Open ↗
01/11/2024122705368Open ↗
Showing 3 of 71 on file for this type
▸BISLANDMARKS SIGNOFF40
07/25/2024102651435Open ↗
05/29/2024101998661Open ↗
03/19/2024123169123Open ↗
Showing 3 of 40 on file for this type
▸BISSUPERSEDING LETTER21
05/01/2024101066800Open ↗
04/25/2024102842051Open ↗
03/28/2024101083104Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL7
03/15/2024123169123Open ↗
01/03/2024120291282Open ↗
10/05/2023121712370Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00488230-I1Open ↗
▸Cost, Insurance & Ownership726
▸BISCOST AFFIDAVIT701
05/29/2024101998661Open ↗
12/19/2023101066800Open ↗
12/15/2023101805227Open ↗
Showing 3 of 701 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW325
03/19/2024123169123Open ↗
01/17/2024120291282Open ↗
01/10/2024104786368Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms736
▸BISEFILING COVER SHEET357
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 357 on file for this type
▸BISBOROUGH INTAKE FORM180
05/01/2024101066800Open ↗
04/25/2024102842051Open ↗
03/28/2024102842051Open ↗
Showing 3 of 180 on file for this type
▸BISADDITIONAL INFORMATION170
11/08/2023102137000Open ↗
Showing 1 of 170 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸Other Documents63
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION46
11/13/2024123050544Open ↗
Showing 1 of 46 on file for this type
▸BISSupporting Document: Fee Exempt10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7796
01/03/2024101805227Open ↗
12/05/2023101066800Open ↗
12/05/2023100815860Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type