56 MARBLE HILL AVENUE
MANHATTAN · Kingsbridge-Marble Hill · BIN 1091079
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof17p · 1 filing · 20 docs
Floor 516p · 1 filing · 20 docs
Floor 416p · 1 filing · 20 docs
Floor 314p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MENCH HOLDINGS CO103/22/2026
PARK MANAGEMENT USA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
ARC ARCHITECTURE + DESIGN STUDIO103/21/2026
RELIABLE EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK MANAGEMENT USA CORPGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524609/22/2025
HRF SERVICES CORP5616608/13/2025
Building Lifecycle
All (109)Filed (22)Permit Issued (14)Signed Off (14)Violation (3)Inspection (14)Objection (12)Special Inspection (30)
06/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/23/2026
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-I1
01/22/2026
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S5
01/08/2026
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S2
12/29/2025
Signed off — Alteration
M00748555-I1
12/23/2025
Signed off — Alteration
M00982229-I1
12/23/2025
Permit issued — Construction Fence
M00982229-I1-FN
12/18/2025
Signed off — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01022459-I1
12/18/2025
Permit issued — Construction Fence
M01022459-I1-FN
11/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/30/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/30/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/30/2025
Special inspection requirement — Air barrier continuity plan testing
Shahrish Shuvo
10/30/2025
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
10/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Shahrish Shuvo
10/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/30/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/30/2025
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
10/30/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/30/2025
Special inspection requirement — Electrical motors and elevators
Shahrish Shuvo
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/30/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
10/30/2025
Special inspection requirement — Lowest Floor Elevation
Shahrish Shuvo
10/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/30/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/30/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/30/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/30/2025
Special inspection requirement — Metering
Shahrish Shuvo
10/27/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, CONSTRUCTION FENCE AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH THE CHAPTER #33 OF THE NYC CODE 2022, NO CHANGES IN EGRESS OR OCCUPANCY.
M01172639-I1
10/20/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Admin
10/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2025
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S4
09/23/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/22/2025
Filed — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-P9
09/22/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
09/22/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
09/22/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/22/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
09/22/2025
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
09/22/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
09/22/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
09/22/2025
Special inspection requirement — Electrical motors and elevators
Shahrish Shuvo
09/22/2025
Special inspection requirement — Lowest Floor Elevation
Shahrish Shuvo
09/16/2025
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S6
09/15/2025
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S7
09/05/2025
Signed off — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-S3
08/27/2025
Filed — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-P8
08/21/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2025
Permit issued — Curb Cut
M00694856-S4-CC
08/13/2025
Filed — New Building
Subsequent filing for installation of plumbing systems associated with 5-Story new building application #M00694856-I1.
M00694856-P7
08/12/2025
Permit issued — Mechanical Systems
M00694856-S7-MS
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP12/23/2025
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP12/18/2025
DOB NOWCurb CutSigned-offPARK MANAGEMENT USA CORP08/18/2025
DOB NOWMechanical SystemsSigned-offPARK MANAGEMENT USA CORP08/12/2025
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP07/24/2025
DOB NOWStructuralSigned-offPARK MANAGEMENT USA CORP02/24/2025
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC12/24/2024
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC12/24/2024
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP12/17/2024
DOB NOWFoundationSigned-offPARK MANAGEMENT USA CORP11/29/2024
DOB NOWSupport of ExcavationSigned-offPARK MANAGEMENT USA CORP11/29/2024
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP11/29/2024
DOB NOWEarth WorkSigned-offHD BUILDERS NY LLC06/28/2023
DOB NOWFoundationSigned-offHD BUILDERS NY LLC06/15/2022
1 project · most recent 09/22/2025
Sprinkler System
FiledStatusContractorScope
09/22/2025Signed-offPIPING & PLUMBING SOLUTIOSprinkler System
1 project · most recent 09/22/2025
FiledStatusContractorScope
09/22/2025Signed-offPIPING & PLUMBING SOLUTIO—
5 projects · most recent 02/03/2026
General Wiring
FiledStatusContractorScope
02/03/2026CompletePOWER DIRECT ELECTRIC INC—
01/19/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
04/23/2025CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
02/06/2025CompleteWCK ELECTRIC CORP.—
01/15/2025CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 09/22/2025
FiledStatusContractorScope
09/22/2025Signed-offPARK MANAGEMENT USA CORP2 scope_items
1 project · most recent 09/22/2025
Fence
FiledStatusContractorScope
09/22/2025Signed-offPARK MANAGEMENT USA CORPFence
1 project · most recent 09/22/2025
Earthwork
FiledStatusContractorScope
09/22/2025Signed-offPARK MANAGEMENT USA CORPEarthwork
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/21/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/21/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
08/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
10/30/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/30/2025Protection of exposed foundation insulationShahrish Shuvoenergy_progress
10/30/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
10/30/2025Electrical motors and elevatorsShahrish Shuvoenergy_progress
10/30/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/30/2025Air barrier continuity plan testingShahrish Shuvoenergy_progress
10/30/2025Lighting controlsShahrish Shuvoenergy_progress
10/30/2025Exterior lighting powerShahrish Shuvoenergy_progress
10/30/2025Air barrier — testing Shahrish Shuvoenergy_progress
10/30/2025Maintenance informationShahrish Shuvoenergy_progress
10/30/2025Interior lighting powerShahrish Shuvoenergy_progress
10/30/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
10/30/2025Fenestration areasShahrish Shuvoenergy_progress
10/30/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/30/2025Lowest Floor ElevationShahrish Shuvoprogress
10/30/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
10/30/2025Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
10/30/2025Fenestration air leakageShahrish Shuvoenergy_progress
10/30/2025MeteringShahrish Shuvoenergy_progress
10/30/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/30/2025Wall Panels, Curtain Walls, and VeneersShahrish Shuvospecial
09/22/2025Exterior lighting powerShahrish Shuvoenergy_progress
09/22/2025Maintenance informationShahrish Shuvoenergy_progress
09/22/2025Electrical motors and elevatorsShahrish Shuvoenergy_progress
09/22/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
Latest 25 of 110.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/31/2026M00748555-I1Request digital key ↗
08/28/2026M00982229-I1Request digital key ↗
08/27/2026M01022459-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/07/2024141026155Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/07/2024141026155Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/07/2024141026155Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00694856-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/25/2026M01172639-I1Open ↗
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P5Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00694856-S5Open ↗
09/01/2026M00694856-I1Open ↗
09/01/2026M00694856-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/20/2026M00694856-P6Open ↗
09/01/2026M00694856-S5Open ↗
09/01/2026M00694856-S6Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/07/2024141026155Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P2Open ↗
08/21/2026M00694856-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
11/19/2024141026155Open ↗
▸BISSTREET TREE CHECKLIST1
11/19/2024141026155Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00694856-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00694856-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00694856-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00694856-S5Open ↗
08/13/2026M00694856-S7Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00694856-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/19/2024141026155Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M00694856-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00694856-S1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/22/2025141026155Open ↗
10/21/2025141026155Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
09/07/2024141026155Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/19/2024141026155Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/07/2024141026155Open ↗
▸Other Documents18
▸DOB NOWProperty Ownership Certification4
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
08/21/2026M00694856-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
10/21/2025141026155Open ↗
10/21/2025141026155Open ↗
10/21/2025141026155Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026M00694856-S2Open ↗
08/13/2026M00694856-Z1Open ↗
08/13/2026M00694856-S1Open ↗
▸DOB NOWSite Survey: Initial3
08/21/2026M00694856-I1Open ↗
08/21/2026M00694856-P4Open ↗
08/21/2026M00694856-P2Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
11/19/2024141026155Open ↗