ECB08/25/2026AT TIME OF INSPECTION, OBSERVED A MACHINE ON SITE. REVIEW OF THE SITE SAFETY PLAN FOUND NO DETAILS IDENTIFYING THE MACHINE OR ITS LOCATION AND OPERATION. THE REQUIRED SITE SAFETY PLAN INFORMATION FOR TEMPORARY$2K due
ECB08/25/2026AT TIME OF INSPECTION, REVIEW OF THE CONSTRUCTION-SUPERINTENDENT LOG DETERMINED THAT AN ALTERNATE ACTED IN PLACE OF THE PRIMARY FOR MORE THAN TWO CONSECUTIVE WEEKS WITHOUT BEING DESIGNATED BY THE PERMIT HOLDER.$5K due
ECB08/25/2026AT TIME OF INSPECTION OF AN ACTIVE DEMOLITION SITE, OBSERVED NO OVERHEAD PROTECTION AT EXPOSURE 2 TO PROTECT THE ADJOINING PROPERTY FROM FALLING MATERIAL AND DEBRIS. THIS CONDITION EXPOSED THE ADJOINING PROPERT$10K due
ECB08/25/2026AT TIME OF INSPECTION OF AN ACTIVE DEMOLITION SITE, OBSERVED GLASS REMAINED THROUGHOUT AREAS UNDERGOING DEMOLITION. GLASS WAS NOT REMOVED BEFORE DEMOLITION OPERATIONS COMMENCED, CONTRARY TO BC 3306.9.8.3. STOP$5K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED A MACHINE IN USE ON SITE THAT WAS NOT IDENTIFIED IN THE APPROVED SITE SAFETY PLAN. REQUIRED DETAILS FOR TEMPORARY CONSTRUCTION EQUIPMENT WERE NOT PROVIDED, CONTRARY TO AC 28-110.$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED DEMOLITION DEBRIS FROM THE PRIOR WORKDAY REMAINED ON SITE AND WAS NOT PROMPTLY REMOVED. THIS CONDITION CREATED TRIPPING, AND FALLING-MATERIAL HAZARDS CONTRARY TO BC 3303.4. MAINT$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED ACTIVE DEMOLITION WORK BEING PERFORMED WITHOUT A VALID PERMIT. DEMOLITION PERMIT B01358066-I1-FD EXPIRED ON 08/16/2026, CONTRARY TO AC 28-105.1. STOP ALL WORK ENTIRE SITE. ALLOWE$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED THE WORK/STORAGE ZONE ADJACENT TO THE SIDEWALK WAS NOT SECURED AND REMAINED ACCESSIBLE TO THE PUBLIC FROM THE SIDEWALK SIDE. THIS CONDITION EXPOSED PEDESTRIANS TO CONSTRUCTION MA$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED BUILDINGS B AND C HAD BEEN FULLY DEMOLISHED WHILE BUILDING A REMAINED, CONTRARY TO THE APPROVED DEMOLITION SEQUENCE REQUIRING BUILDINGS A, B, AND C TO BE DEMOLISHED SIMULTANEOUSL$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED BUILDINGS B AND C HAD BEEN FULLY DEMOLISHED WHILE BUILDING A REMAINED, CONTRARY TO THE APPROVED DEMOLITION SEQUENCE REQUIRING BUILDINGS A, B, AND C TO BE DEMOLISHED SIMULTANEOUSL$2K due
ECB08/25/2026AT TIME OF INSPECTION, OBSERVED THE SUPPORTED SCAFFOLD WAS NOT MAINTAINED, WITH AN INADEQUATE GUARDRAIL SYSTEM AND PLATFORMS THAT WERE NOT FULLY PLANKED. THESE CONDITIONS CREATES A FALL HAZARD, CONTRARY TO BC 3$5K due
ECB03/13/202627-MISC, 28-MISC, BC MISC. MISCELLANEOUS VIOLATION. AT TIME OF INSPECTION OBSERVED ON LOT DEMO IN PROGRESS WITH EXCAVATOR ON SITE, EXCAVATION THROUGHOUT LOT. NO NOTIFICATION ON DOB RECORDS FOR EARTHWORK, 3306.3$1K due
ECB06/15/1999WORK WITHOUT A PERMIT. WORK NOTED: HAVING CREATED TWO NEW STRUCTURES ON ROOF OF PREMISES. ALSO HOLES CUT IN EXTERIOR WALLS FOR WINDOWS. NO PERMITS POSTED. REMEDY: STOP ALL WORK INSIDE AND OUT, OBTAIN A PERMITNothing owed — awaiting certificate of correction