← Back
Two family frame
56 OLIVER PLACE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5031111
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3XZoning
2,194 sfGross Floor Area
2Units
Two family frame · 4,200 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Roof5p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC210/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272210/17/2025
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
12/23/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01217750-I1
10/20/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/20/2025
Special inspection requirement — Final
Walid Abdulla
10/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01217750-P1
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/13/2025
Special inspection requirement — Final
Walid Abdulla
10/13/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/03/2025
Permit issued — Solar
S01217750-I1-SL
05/28/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01217750-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/03/2025
1 project · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/20/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/20/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/20/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/20/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/20/2025FinalWalid Abdullaprogress
10/13/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/13/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/13/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/13/2025FinalWalid Abdullaprogress
10/13/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01217750-I1Request digital key ↗
08/19/2026S01217750-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026S01217750-I1Open ↗
08/31/2026S01217750-I1Open ↗
08/31/2026S01217750-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026S01217750-I1Open ↗
08/31/2026S01217750-I1Open ↗
08/27/2026S01217750-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01217750-I1Open ↗
08/13/2026S01217750-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01217750-I1Open ↗
08/13/2026S01217750-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01217750-I1Open ↗