← Back
STATEN ISLAND
56 STECHER STREET
STATEN ISLAND · BIN 5175309
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Floor 211p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIMOLA CONSTRUCTION3107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT1308/25/2025
C&P DESIGN CONSULTANTS112/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS2003/21/2026
SANNA LOCCISANO ARCHITECTS P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIMOLA CONSTRUCTION CORPGeneral Contractor807/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
B & R ELEC'L CONTR'G, INCElectrical103/22/2026
DUO PLBG. & HTG. CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472508/25/2025
Building Lifecycle
All (73)Filed (14)Permit Issued (9)Signed Off (5)Violation (2)Inspection (11)Objection (2)Special Inspection (30)
08/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
08/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Protection of exposed foundation insulation
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Final
Stanislav Pilipenko
08/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Lighting in dwelling units
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
08/26/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
08/25/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-P5
08/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
08/25/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
08/25/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
06/16/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-P4
05/28/2025
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S2
05/28/2025
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S8
05/28/2025
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S6
05/28/2025
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S7
05/22/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/19/2025
Signed off — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S5
05/16/2025
Permit issued — Curb Cut
S08050665-S8-CC
05/16/2025
Permit issued — Curb Cut
S08050665-S7-CC
05/12/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S8
05/12/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S7
05/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-P3
05/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2025
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-P2
04/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/07/2025
Permit issued — Plumbing
S08050665-S6-PL
04/07/2025
Permit issued — Sprinklers
S08050665-S6-EW-SP
02/07/2025
Permit issued — General Construction
S08050665-I1-GC-CX
12/17/2024
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH ACCESSORY BUILT-IN ONE CAR GARAGE AND TWO ACCESSORY OFF STREET PARKING SPACES.
S08050665-S6
11/20/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/12/2024
Permit issued — Plumbing
S55120009-S5-PL
10/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/12/2024
Permit issued — Plumbing
S08050665-S5-PL
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDIMOLA CONSTRUCTION05/16/2025
DOB NOWCurb CutSigned-offDIMOLA CONSTRUCTION05/16/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.04/07/2025
DOB NOWSprinklersSigned-offDUO PLBG. & HTG. CORP04/07/2025
DOB NOWGeneral ConstructionPermit IssuedDIMOLA CONSTRUCTION02/07/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC11/12/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.08/12/2024
DOB NOWFoundationPermit IssuedDIMOLA CONSTRUCTION07/31/2024
DOB NOWConstruction FenceSigned-offDIMOLA CONSTRUCTION03/15/2024
1 project · most recent 08/25/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/25/2025Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 10/04/2024
General Wiring
FiledStatusContractorScope
10/04/2024CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 08/25/2025
Concrete Wood
FiledStatusContractorScope
08/25/2025Signed-offDIMOLA CONSTRUCTION CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/22/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
08/26/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
08/26/2025Subgrade InspectionsStanislav Pilipenkospecial
08/26/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
08/26/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
08/26/2025Mechanical SystemsStanislav Pilipenkospecial
08/26/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
08/26/2025Footing and FoundationStanislav Pilipenkoprogress
08/26/2025Structural Wood FrameStanislav Pilipenkoprogress
08/26/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
08/26/2025FinalStanislav Pilipenkoprogress
08/26/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/26/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
08/26/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/26/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/26/2025Maintenance informationStanislav Pilipenkoenergy_progress
08/26/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
08/26/2025Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
08/26/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
08/26/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
08/26/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
08/26/2025Permanent certificateStanislav Pilipenkoenergy_progress
08/26/2025Interior lighting powerStanislav Pilipenkoenergy_progress
08/26/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
08/26/2025Fenestration areasStanislav Pilipenkoenergy_progress
08/26/2025Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
Latest 25 of 107.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/19/2026S08050665-I1Request digital key ↗
08/19/2026S08050665-S3Request digital key ↗
08/19/2026S08050665-S2Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/10/2025540215541Open ↗
03/28/2022540215541Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/28/2022540215541Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram5
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026S08050665-I1Open ↗
08/13/2026S08050665-P5Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/19/2026S08050665-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/19/2026S08050665-S3Open ↗
08/19/2026S08050665-S2Open ↗
08/19/2026S08050665-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026S08050665-I1Open ↗
08/29/2026S08050665-I1Open ↗
08/29/2026S08050665-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026S08050665-I1Open ↗
08/29/2026S08050665-I1Open ↗
08/29/2026S08050665-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/28/2022540215541Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/28/2022540215541Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P4Open ↗
08/14/2026S08050665-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/19/2026S08050665-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/19/2026S08050665-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026S08050665-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT5
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-P3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/28/2022540215541Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/28/2022540215541Open ↗
▸BISADDITIONAL INFORMATION1
09/11/2024540215541Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-P3Open ↗
08/19/2026S08050665-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/19/2026S08050665-I1Open ↗
08/19/2026S08050665-P4Open ↗
08/19/2026S08050665-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWWaiver Document4
08/19/2026S08050665-S3Open ↗
08/19/2026S08050665-S2Open ↗
08/19/2026S08050665-S1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
03/28/2022540215541Open ↗
▸DOB NOWFinal Survey1
08/19/2026S08050665-I1Open ↗