← Back
Office with commercial, 7-19 stories
56 WEST 45 STREET
MANHATTAN · BIN 1034235
💬 Discuss this project
1914Year Built
17Stories
O6Building Class
C6-4.5Zoning
58,538 sfGross Floor Area
62Units
LL97 Covered5 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 3Y-PLAZA LLC · 4,016 sf lot · 14.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof1p · 1 filing · 5 docs
Floor 181p · 1 filing · 4 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 112p · 1 filing · 4 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 42p · 1 filing · 10 docs
Floor 3
Floor 2
Floor 1
Cellar8p · 1 filing · 4 docs
4 jobs · most recent 05/02/2023
General Wiring Lighting
FiledStatusContractorScope
05/02/2023Permit IssuedPRUDENT ELECTRIC INCGeneral Wiring
03/09/2023Permit IssuedBIGMAN BROS., INC.General Wiring, Lighting
08/04/2022Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
03/23/2022CompleteLINTECH ELECTRIC, INCGeneral Wiring
Building Lifecycle
All (109)Filed (4)Permit Issued (4)Signed Off (4)Facade (FISP) (12)Violation (60)Objection (16)Special Inspection (9)
01/23/2026
Violation issued (ECB, closed)
Elevators
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/31/2023
Signed off — Alteration
Interior demolition of non-load bearing partitions and related finishes to address violation # 039078207K. No Change to use, egress or occupancy.
M00828976-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2023
Permit issued — General Construction
M00828976-I1-GC
02/24/2023
Objection raised — Scope
02/24/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Scope
02/21/2023
Objection resolved — Addressed
02/17/2023
Filed — Alteration
Interior demolition of non-load bearing partitions and related finishes to address violation # 039078207K. No Change to use, egress or occupancy.
M00828976-I1
02/14/2023
Special inspection requirement — Final
ALLEN AZARKIAN
01/23/2023
Violation issued (ECB, closed)
Construction
12/12/2022
Cycle 9 facade report submitted
12/12/2022
Cycle 9 facade report signed — SWARMP
11/28/2022
Cycle 9 facade inspection completed
08/17/2022
Signed off — Alteration
RENOVATION TO THE EXISTING COMMERCIAL USE GROUP 6 (STORE), NEWNON BEARING PARTITIONS, REPAIR FLOORING TILES, NEW DROP CEILING TILES, MECH. DUCT, NEW COUNTERS FOR THE PROPOSED USE GROUP6 (PROFESSIONAL HEALTH CARE OFFICE ) ASPER PLANS, NO CHANGE IN USE OCC
M00531210-I1
03/07/2022
Permit issued — General Construction
M00531210-I1-GC-CX
11/19/2021
Objection raised — Scope
11/19/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Fire_Protection
08/31/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Scope
07/29/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Scope
07/29/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Energy
07/29/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Scope
07/29/2021
Objection resolved — Addressed
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2021
Filed — Alteration
RENOVATION TO THE EXISTING COMMERCIAL USE GROUP 6 (STORE), NEWNON BEARING PARTITIONS, REPAIR FLOORING TILES, NEW DROP CEILING TILES, MECH. DUCT, NEW COUNTERS FOR THE PROPOSED USE GROUP6 (PROFESSIONAL HEALTH CARE OFFICE ) ASPER PLANS, NO CHANGE IN USE OCC
M00531210-I1
05/28/2021
Special inspection requirement — Mechanical Systems
OMAR ELSHERIF
05/28/2021
Special inspection requirement — Final
ZAINAB FAISAL
05/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
ZAINAB FAISAL
05/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ZAINAB FAISAL
05/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
ZAINAB FAISAL
05/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
OMAR ELSHERIF
11/06/2020
Signed off — Alteration
REMOVE USUSED AC EQUIPMENT FROM ROOF. INSTALL ONE 12 TON SPLIT CONDENSER ON EXISTING DUNNAGE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00419917-I1
11/05/2020
Permit issued — Mechanical Systems
M00419917-I1-MS
11/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/03/2020
Filed — Alteration
REMOVE USUSED AC EQUIPMENT FROM ROOF. INSTALL ONE 12 TON SPLIT CONDENSER ON EXISTING DUNNAGE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00419917-I1
10/27/2020
Special inspection requirement — Mechanical Systems
Marcelo Barujel
10/27/2020
Special inspection requirement — Final
Marcelo Barujel
02/11/2020
Signed off — Alteration
M00188320-I1
11/20/2019
Permit issued — Sprinklers
M00188320-I1-EW-SP
11/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/05/2019
Filed — Alteration
M00188320-I1
07/26/2019
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/04/2016
Cycle 8 facade report submitted
03/17/2016
Cycle 8 facade report signed — SAFE
Latest 60 of 109 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3Y-PLAZA LLC303/22/2026
34 PLAZA LLC103/22/2026
56 WEST 45TH STREET1503/22/2026
VALERBRAY REAL ESTATE3603/22/2026
NICK103/22/2026
COLLINS TOTTLE & CO IN203/22/2026
COLLINS103/22/2026
IPSWICH CORP203/22/2026
IPS WICH REALTY CORP203/22/2026
56 W 45TH STREET403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2017$50.0M—— → —$854/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAR CODE INC.203/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAR CODE INCGeneral Contractor303/21/2026
PEPAJ CONSTRUCTION CORPGeneral Contractor307/08/2026
PAUL CILLIKElectrical203/21/2026
KINGS BORO APPLIANCES INCElectrical103/21/2026
BERNARD FARSKYElectrical103/21/2026
SULLIVAN, JAMESElectrical103/21/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
RICKFORD, JOHNElectrical103/21/2026
CAMBRIA, JElectrical103/21/2026
ELIASSAINT, DELVAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MAR CODE INC.7000106/14/2021
MARCELO BARUJEL ARCHITECT953111/03/2020
TWIG SPECIAL INSPECTIONS885109/05/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPEPAJ CONSTRUCTION CORP04/03/2023
DOB NOWGeneral ConstructionSigned-offMAR CODE INC03/07/2022
DOB NOWMechanical SystemsSigned-offPEPAJ CONSTRUCTION CORP11/05/2020
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC11/20/2019
BISMHISSUEDISLAND BREEZE MECH SRVS08/06/2018
BISOTISSUEDALL DIMENSION HOME IMPROVEMENT09/16/2016
BISMHISSUEDGOOD-WILL MECHANICAL CORP.04/19/2016
BISSPISSUEDADRIANO PLUMBING & HEATING04/13/2016
BISPLISSUEDADRIANO PLMBG & HTG CORP04/13/2016
BISOTISSUED3-G SERVICES LIMITED04/11/2016
BISPLISSUEDWILLIAM C. GERAKARIS P&H08/24/2015
BISSPISSUEDACCURATE MECHANICAL INC05/20/2015
BISSDISSUEDMETRO FIRE PROTECTION INC05/18/2015
BISPLISSUEDACCURATE MECHANICAL INC04/08/2015
BISOTISSUEDSTEPPING STONE CONSTRUCT*03/26/2015
BISMHISSUEDSTEPPING STONE CONSTRUCT*03/26/2015
BISPLISSUEDLEMODE PLBG & HTG CORP09/04/2014
BISSPISSUEDLEMODE PLUMBING & HEATING09/04/2014
BISMHISSUEDWHITESTAR CONSLT. & CONT09/03/2014
BISOTISSUEDWHITESTAR CONSLT. & CONT09/03/2014
BISPLISSUEDACCESS PLUMBING CORP07/22/2014
BISSPISSUEDFIREQUEST CORP07/22/2014
BISOTISSUEDFIRST RATE MANAGEMENT INC06/25/2014
BISMHISSUEDFIRST RATE MANAGEMENT INC06/25/2014
BISPLISSUEDWILLIAM C. GERAKARIS P&H05/22/2014
BISOTISSUEDA W R GROUP INC06/28/2013
BISPLISSUEDPRECISION PLBG SVCS., INC05/29/2013
BISMHISSUEDALL DIMENSION HOME IMPROVEMENT05/08/2013
BISOTISSUEDALL DIMENSION HOME IMPROVEMENT05/01/2013
BISOTISSUEDA W R GROUP INC04/23/2013
BISEQISSUEDEVEREST SCAFFOLDING INC04/09/2013
BISOTISSUEDNUCOR CONSTRUCTION CORP02/22/2012
BISPLISSUEDNM MECHANICAL CORP12/20/2011
BISOTISSUEDLEVENT KARAROGLU12/14/2011
BISSDISSUEDNYCO PLBG & HTG CORP07/29/2011
BISPLISSUEDWILLIAM C. GERAKARIS P&H07/29/2011
BISEQISSUEDEVEREST SCAFFOLDING INC07/15/2005
BISMHISSUEDSPACE AIR CONDITIONING CORP09/25/2003
BISEQISSUEDSPRING SCAFFOLDING03/31/2003
BISOTISSUEDKIVOS GENERAL CONTRACTING INC03/04/2003
+ 6 more permits on file
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/14/2023FinalALLEN AZARKIANprogress
05/28/2021Mechanical SystemsOMAR ELSHERIFspecial
05/28/2021FinalZAINAB FAISALprogress
05/28/2021HVAC-R and service water heating equipmentZAINAB FAISALenergy_progress
05/28/2021HVAC-R and service water piping design and insulationZAINAB FAISALenergy_progress
05/28/2021HVAC-R and service water heating system controlsZAINAB FAISALenergy_progress
05/28/2021Fire-Resistant Penetrations and JointsOMAR ELSHERIFspecial
10/27/2020Mechanical SystemsMarcelo Barujelspecial
10/27/2020FinalMarcelo Barujelprogress
▾Documents — 364 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/15/2026M00531210-I1Request digital key ↗
08/14/2026M00828976-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00188320-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00419917-I1Request digital key ↗
▸Applications & Permits78
▸BISPLAN / WORK APPROVAL APPLICATION45
07/24/2018123475284Open ↗
09/26/2016122685282Open ↗
09/13/2016140548799Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION33
08/06/2018123475284Open ↗
09/13/2016140548799Open ↗
04/22/2016122685282Open ↗
Showing 3 of 33 on file for this type
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION42
09/27/2018123475284Open ↗
09/27/2018123475284Open ↗
09/01/2017122077313Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
07/24/2018123475284Open ↗
09/26/2016122685282Open ↗
09/11/2016122685282Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
07/24/2018123475284Open ↗
09/13/2016140548799Open ↗
03/04/2016122685282Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00531210-I1Open ↗
09/02/2026M00531210-I1Open ↗
09/02/2026M00531210-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/05/2026M00188320-I1Open ↗
09/04/2026M00419917-I1Open ↗
08/13/2026M00531210-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00531210-I1Open ↗
09/02/2026M00531210-I1Open ↗
08/28/2026M00419917-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/13/2016140548799Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/13/2016140548799Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment53
▸BISSELF-CERT PLUMBING NOTICE18
10/03/2015120568144Open ↗
09/22/2015120568144Open ↗
09/09/2015120568144Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
06/07/2016122685282Open ↗
06/07/2016122685282Open ↗
03/04/2016122685282Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS5
09/27/2018123475284Open ↗
10/07/2016122685282Open ↗
07/13/2015122077313Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/27/2018123475284Open ↗
10/07/2016122685282Open ↗
07/14/2015122077313Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/17/2017120755995Open ↗
05/12/2016120755995Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
09/09/2015120568144Open ↗
01/16/2015122077304Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
09/22/2015120568144Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00188320-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/24/2018123475284Open ↗
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
07/24/2018123475284Open ↗
09/01/2017122077313Open ↗
09/13/2016140548799Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/05/2026M00188320-I1Open ↗
09/04/2026M00419917-I1Open ↗
08/13/2026M00828976-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
09/27/2018123475284Open ↗
07/24/2018123475284Open ↗
09/01/2017122077313Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
09/27/2018123475284Open ↗
10/07/2016122685282Open ↗
07/10/2015122077313Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections1
11/25/2014122047613Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00531210-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/13/2016140548799Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
09/27/2018123475284Open ↗
05/17/2017120755995Open ↗
10/07/2016122685282Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER2
05/21/2015120568144Open ↗
05/21/2015120568144Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT29
09/27/2018123475284Open ↗
07/24/2018123475284Open ↗
05/17/2017120755995Open ↗
Showing 3 of 29 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET20
07/24/2018123475284Open ↗
06/23/2016122815463Open ↗
03/04/2016122685282Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION11
09/17/2018123475284Open ↗
09/29/2016122685282Open ↗
06/07/2016122685282Open ↗
Showing 3 of 11 on file for this type
▸BISeFiling Job Application Cover Sheet4
03/04/2015122282760Open ↗
03/04/2015122282760Open ↗
09/13/2016140548799Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
09/27/2018123475284Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/13/2015122077313Open ↗