← Back
BuildNYC
Public elementary, junior or senior high
Holy Cross School
560 THIERIOT AVENUE · BIN 2021482
💬 Discuss this project
1922Year Built
3Stories
W1Building Class
R5Zoning
45,750 sfGross Floor Area
1Units
11 Active Violations 0 unresolved · 11 paperwork only 2 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 75,643 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Site & exteriorP.S. 69X, P.S. 069XUnder Construction37p · 6 filings · 18 docs
Filed — no permit issuedSite plumbing to replace area drain, piping, and manhole38p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority10607/08/2026
NYC Department of Education503/22/2026
Holy Cross Church103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Langan Engineering611/20/2025
Dseny Engineering Services312/10/2024
KNF Services Crop703/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dseny Engineering Services603/21/2026
Caso Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Civil ContractingScaffold707/08/2026
Triangle Enterprise NYC IScaffold607/08/2026
Kel-Tech ConstructionScaffold607/08/2026
Adam's European ContractingScaffold304/09/2026
Innovative Electric of NYElectrical103/21/2026
Ziggy's Electrical ContngElectrical103/22/2026
Ryan JosephElectrical103/21/2026
Laser Electrical Constr'gElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589111/22/2024
Twin Peaks317203/23/2023
Building Lifecycle
All (124)Filed (16)Permit Issued (15)Signed Off (3)Violation (60)Objection (11)Special Inspection (19)
05/11/2026
Signed off — Alteration
X00819294-I1
05/01/2026
Violation issued (ECB, open)
Construction
05/01/2026
Violation issued (ECB, open)
Construction
05/01/2026
Violation issued (ECB, open)
Construction
01/11/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
12/19/2025
Special inspection requirement — Concrete - Precast
12/19/2025
Special inspection requirement — Structural Steel - Details
12/01/2025
Objection raised — Other
12/01/2025
Objection raised — Other
11/25/2025
Signed off — Alteration
X00320194-I1
11/25/2025
Permit issued — Protection and Mechanical Methods
X01142462-I1-PMM
11/25/2025
Permit issued — Construction Fence
X01142455-I1-FN
11/20/2025
Filed — Alteration
Site plumbing to replace in kind an area drain and 140' +/- of piping and new manhole
X01317114-S1
11/17/2025
Filed — Alteration
Site plumbing to replace in kind an area drain and 140' +/- of piping and new manhole
X01317114-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/11/2025
Special inspection requirement — Concrete - Cast-In-Place
11/11/2025
Special inspection requirement — Subgrade Inspections
11/11/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/11/2025
Special inspection requirement — Final
11/11/2025
Special inspection requirement — Footing and Foundation
10/20/2025
Objection raised — Other
10/20/2025
Objection raised — Other
10/20/2025
Objection raised — Other
10/20/2025
Objection raised — Other
10/14/2025
Filed — Alteration
Site civil removals and restoration including site features and landscaping
X01295786-S3
10/10/2025
Filed — Alteration
Site civil removals and restoration including site features and landscaping
X01295786-S2
10/10/2025
Filed — Alteration
Site civil removals and restoration including site features and landscaping
X01295786-S1
10/10/2025
Filed — Alteration
Site civil removals and restoration including site features and landscaping
X01295786-I1
09/30/2025
Special inspection requirement — Final
09/30/2025
Special inspection requirement — Concrete - Cast-In-Place
09/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/30/2025
Special inspection requirement — Subgrade Inspections
09/30/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/30/2025
Special inspection requirement — Final
09/30/2025
Special inspection requirement — Concrete - Cast-In-Place
09/30/2025
Special inspection requirement — Subgrade Inspections
09/30/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/17/2025
Violation issued (FDNY_NOV, closed)
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, open)
Construction
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, open)
Construction
03/12/2025
Violation issued (FDNY_ORDER, closed)
03/12/2025
Violation issued (FDNY_ORDER, closed)
12/23/2024
Permit issued — Protection and Mechanical Methods
X01142462-I1-PMM
12/18/2024
Permit issued — Construction Fence
X01142455-I1-FN
12/10/2024
Filed — Alteration
X01142455-I1
12/03/2024
Signed off — Alteration
X00819285-I1
11/22/2024
Filed — Alteration
X01142462-I1
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Noel Tolentino
11/22/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
11/19/2024
Permit issued — Construction Fence
X00819294-I1-FN
09/26/2024
Violation issued (FDNY_ORDER, closed)
09/26/2024
Violation issued (FDNY_ORDER, closed)
09/16/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedKel-Tech Construction11/25/2025
DOB NOWConstruction FencePermit IssuedKel-Tech Construction11/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedKel-Tech Construction12/23/2024
DOB NOWConstruction FencePermit IssuedKel-Tech Construction12/18/2024
DOB NOWConstruction FenceSigned-offCivil Contracting11/19/2024
DOB NOWConstruction FenceSigned-offCivil Contracting06/11/2024
DOB NOWSupported ScaffoldPermit IssuedTriangle Enterprise NYC I02/21/2024
DOB NOWConstruction FenceSigned-offCivil Contracting02/06/2024
DOB NOWSidewalk ShedSigned-offTriangle Enterprise NYC I01/31/2024
DOB NOWSupported ScaffoldPermit IssuedTriangle Enterprise NYC I03/01/2023
DOB NOWSidewalk ShedSigned-offTriangle Enterprise NYC I02/09/2023
DOB NOWConstruction FenceSigned-offCivil Contracting02/09/2023
DOB NOWSidewalk ShedSigned-offAdam's European Contracting08/24/2022
DOB NOWSidewalk ShedSigned-offAdam's European Contracting06/21/2021
DOB NOWSidewalk ShedSigned-offAdam's European Contracting04/21/2020
BISOTISSUEDCivil Contracting06/26/2025
BISOTISSUEDCivil Contracting01/24/2025
BISOTISSUEDCivil Contracting11/19/2024
BISOTISSUEDCivil Contracting06/11/2024
BISOTISSUEDCivil Contracting11/15/2023
BISOTISSUEDCivil Contracting11/15/2023
BISOTISSUEDHigh Volt Electric05/02/2023
BISOTISSUEDCivil Contracting04/11/2023
BISOTISSUEDCivil Contracting04/11/2023
BISOTRE-ISSUEDAshnu International03/14/2016
BISOTRE-ISSUEDAshnu International03/14/2016
BISMHISSUEDU & I Mechanical10/23/2015
BISMHISSUEDMidtown HVAC Enterprises05/01/2015
BISEQISSUEDRoma Scaffolding04/01/2015
BISOTISSUEDAshnu International03/03/2015
BISOTISSUEDAshnu International03/03/2015
BISOTISSUEDAshnu International02/12/2015
BISOTISSUEDAshnu International02/12/2015
BISEQISSUEDAshnu International02/12/2015
BISEQISSUEDRoma Scaffolding02/06/2015
BISMHISSUEDU & I Mechanical11/25/2014
BISMHISSUEDMidtown HVAC Enterprises05/08/2014
BISEQISSUEDRoma Scaffolding04/02/2014
BISMHISSUEDMidtown HVAC Enterprises03/31/2014
BISEQISSUEDRoma Scaffolding03/06/2014
+ 25 more permits on file
2 projects · most recent 11/20/2025
Storm
FiledStatusContractorScope
11/20/2025——Storm
10/14/2025——Storm
9 projects · most recent 07/23/2025
General Wiring
FiledStatusContractorScope
07/23/2025Permit IssuedDNR ElectricGeneral Wiring
03/19/2024CompleteAnco Electl Contctng—
04/24/2023CompleteHigh Volt Electric Corp ofGeneral Wiring
04/24/2023Permit IssuedHigh Volt Electric Corp of—
02/07/2023CompleteRaiden ElectricGeneral Wiring
11/23/2021CompleteZiggy's Electrical Contng—
06/30/2021CompleteCharan Electrical Enterp's—
04/16/2019Permit IssuedSamco Electric—
04/16/2018CompleteLaser Electrical Constr'gGeneral Wiring
2 projects · most recent 11/20/2025
Concrete
FiledStatusContractorScope
11/20/2025——Concrete
10/14/2025——Concrete
1 project · most recent 03/23/2023
Scaffold
FiledStatusContractorScope
03/23/2023Permit IssuedTriangle Enterprise NYC IScaffold
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/19/2025Concrete - Precast—special
12/19/2025Structural Steel - Details—special
11/11/2025Concrete - Cast-In-Place—special
11/11/2025Subgrade Inspections—special
11/11/2025Subsurface Conditions – Fill Placement & In-Place Density—special
11/11/2025Final—progress
11/11/2025Footing and Foundation—progress
09/30/2025Final—progress
09/30/2025Concrete - Cast-In-Place—special
09/30/2025Excavations - Sheeting, Shoring, and Bracing—special
09/30/2025Subgrade Inspections—special
09/30/2025Subsurface Conditions – Fill Placement & In-Place Density—special
09/30/2025Final—progress
09/30/2025Concrete - Cast-In-Place—special
09/30/2025Subgrade Inspections—special
09/30/2025Subsurface Conditions – Fill Placement & In-Place Density—special
11/22/2024Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
11/22/2024Post-installed AnchorsNoel Tolentinospecial
01/26/2023Post-installed AnchorsMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 69XEducation—
Project X01142462 Alteration · Permit Entire · 11/22/2024
Project X00320194 Alteration · LOC Issued · 03/03/2020
P.S. 069XEducation—
Project X00819267 Alteration · Permit Entire · 01/26/2023
Project X00819285 Alteration · LOC Issued · 01/26/2023
Project X00819294 Alteration · LOC Issued · 01/26/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
08/23/2026X00819294-I1Request digital key ↗
08/23/2026X00819294-P1Request digital key ↗
08/23/2026X00819267-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026X00320194-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026X00320194-I1Open ↗
08/23/2026X00819267-I1Open ↗
08/23/2026X00819267-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026X00819267-I1Open ↗
08/23/2026X01142462-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWNYCSCA - Approved Site Safety Plans9
08/13/2026X00819285-I1Open ↗
08/13/2026X00819285-P1Open ↗
08/13/2026X00819294-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026X01317114-I1Open ↗
08/15/2026X01317114-S1Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/13/2026X01295786-I1Open ↗
08/13/2026X00320194-I1Open ↗
08/13/2026X00819267-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/20/2026X01142455-I1Open ↗
08/15/2026X01295786-S2Open ↗
08/15/2026X01295786-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)9
08/23/2026X00819294-I1Open ↗
08/23/2026X00819285-I1Open ↗
08/13/2026X01295786-S1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/13/2026X00819285-P1Open ↗
08/13/2026X00819285-I1Open ↗
08/13/2026X00819285-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/23/2026X00819294-I1Open ↗
08/23/2026X00819285-I1Open ↗