← Back
BuildNYC
Elevator cooperative
5601 RIVERDALE AVENUE
BRONX · BIN 2086329
💬 Discuss this project
1954Year Built
7Stories
D4Building Class
R4Zoning
150,700 sfGross Floor Area
116Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 5601 Riverdale Owners · 45,375 sf lot · 3.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade access using rope techniques1p · 2 filings · 7 docs
Floor 6Oil to gas conversion1 filing · 5 docs
Floor 5Oil to gas conversion1 filing · 5 docs
Floor 4Oil to gas conversion1 filing · 5 docs
Floor 3Oil to gas conversion1 filing · 5 docs
Floor 2Oil to gas conversion1 filing · 5 docs
Floor 1Oil to gas conversion1 filing · 5 docs
CellarOil to gas conversion16p · 3 filings · 20 docs
Site & exteriorFacade repair project20p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5601 Riverdale Owner's2703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stone108/31/2023
Ashraf108/24/2023
EN-Power Group505/02/2023
Royal T&E103/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stone203/21/2026
Pyramid Restoration NY203/21/2026
J A Expediting1003/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
Phoenix Sutton STRScaffold307/08/2026
ApecPlumbing203/22/2026
Lawrence Exterior Restorationspecialty_contractor107/08/2026
Platinum Services NYScaffold107/08/2026
G.bassolino PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803108/31/2023
Group-S5216505/02/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/18/2026
Elevator Category 1 inspection report filed
08/19/2026
Co-op apartment 5P sold for $315,000
07/20/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/09/2026
Signed off — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
X01290262-I1
190 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStreamline Consultants NY12/03/2025
DOB NOWSuspended ScaffoldSigned-offStreamline Consultants NY10/06/2025
DOB NOWGeneral ConstructionSigned-offLawrence Exterior Restoration09/08/2023
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/25/2023
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme01/04/2023
DOB NOWBoiler EquipmentSigned-offEfficient Comb & Cooling Co09/08/2022
DOB NOWPlumbingSigned-offG.bassolino Plumbing08/28/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/30/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/15/2018
BISPLISSUEDInfiniti Esc Plumbing07/31/2019
BISOTISSUEDAlbert Mendoza07/30/2019
BISOTISSUEDMcFar Construction11/28/2018
BISOTISSUEDCresco Construction07/31/2018
BISOTISSUEDMcFar Construction04/05/2018
BISEQISSUEDRock Group NY12/29/2015
BISOTISSUEDTwo-Tone Contracting04/10/2014
BISEQISSUEDRock Group NY04/04/2014
BISOTISSUEDWilliam K. Construction Group09/21/2011
BISEQISSUEDSkyline Scaffolding Group07/18/2011
BISPLISSUEDNew York Plumbing & Heating05/27/2011
BISOTISSUEDDurgun Home Improvements05/26/2011
BISOTISSUEDWilliam K. Construction Group09/30/2010
BISEQISSUEDSkyline Scaffolding Group09/09/2010
BISOTISSUEDFrank Basile Contracting04/24/2008
BISOTISSUEDEchostar Construction12/15/2006
BISOTISSUEDA.L. Eastmond06/16/2003
BISFSISSUEDA.L. Eastmond06/12/2003
BISOTISSUEDFrank Basile Contracting09/04/1997
BISPLISSUEDVitello P & Mechanical04/11/1997
BISOTISSUEDR & N Construction04/04/1997
10 projects · most recent 07/03/2025
General Wiring Boiler Controls
FiledStatusContractorScope
07/03/2025Permit IssuedGia ElectricalGeneral Wiring
08/06/2024CompleteA.S.H. ElectricGeneral Wiring
10/17/2023Permit IssuedIlluminous ElectricGeneral Wiring
09/06/2023CompleteAmsterdam Electric—
07/11/2023CompleteAstro Electrical ContngGeneral Wiring
02/04/2023CompleteItkin ElectricBoiler Controls
09/23/2020Permit IssuedElectl Contg Solutions CoGeneral Wiring
02/14/2020CompleteCentury ElectricGeneral Wiring
06/21/2018CompleteLive Wire Electric 1General Wiring
03/12/2018CompleteElpo Electrical Contg—
1 project · most recent 08/24/2023
Sidewalk Shed
FiledStatusContractorScope
08/24/2023Permit IssuedPlatinum Services NYSidewalk Shed
1 project · most recent 09/21/2025
FiledStatusContractorScope
09/21/2025Signed-offStreamline Consultants NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/04/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/15/2023FinalEvan Petkanasprogress
08/15/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/15/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/15/2023MasonrySAMI HAJJAR P.Especial
05/03/2023Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
05/02/2023Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
03/29/2023Maintenance informationMICHAEL SCORRANOenergy_progress
03/29/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMICHAEL SCORRANOspecial
03/29/2023Heating SystemsMICHAEL SCORRANOspecial
03/29/2023Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
03/29/2023HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
03/29/2023HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
03/29/2023HVAC-R and service water piping design and insulationMICHAEL SCORRANOenergy_progress
03/15/2023HVAC-R and service water piping design and insulationMICHAEL SCORRANOenergy_progress
03/15/2023Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
03/15/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMICHAEL SCORRANOspecial
03/15/2023Heating SystemsMICHAEL SCORRANOspecial
03/15/2023HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
03/15/2023Maintenance informationMICHAEL SCORRANOenergy_progress
03/15/2023HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
06/06/2022Chimneys and ventsMICHAEL SCORRANOspecial
06/06/2022FinalMICHAEL SCORRANOprogress
06/06/2022Fire-Resistance Rated ConstructionMICHAEL SCORRANOprogress
06/06/2022Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
06/06/2022Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
203 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account