DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/09/1994V-DOB VIOLATION - ACTIVE
DOB05/17/1993V-DOB VIOLATION - ACTIVE
ECB08/01/2013WORK W/O A PERMIT WORK NOTED AT REAR YARD 8 FOOT CONCRETE BLOCK WALL AT NORTH SIDE AND AT SOUTH SIDE CHAIN LINK FENCE INSTALLED ON THE SIDEOF 5'0" BRICK WALL RAISING THE SOUTH WALL TO 8'0" ENCLOSING REAR YARDNothing owed — awaiting certificate of correction
ECB09/17/2008B354,15,16,24B,32A,50,50A,B,C,D,E,F,G,H.50-NEED CHECK VALVE BTWN BACKFLOW PREVENTOR & PRESSURE REDUCING VALVE.50A-CEILING ABOVE BOILER MUST BE FIREPROOF.50B-RELIEF VALVE MUST BE 30 PSI NOT 50 PSI.50C-DEBRIS ARONothing owed — awaiting certificate of correction
ECB06/08/2003OCCUPANCY CONTRARY TO BLDG DEPT RECORDS IN THAT REAR YARD AT 1STY AT THE ABOVE PREMISES IS ARRANGED TO BE OCCUPIED IN CONJUNCTION WITH 1 STYDRINKING ESTABLISHMENT-TABLES AND CHAIRS UMBRELLAS-ICE BUCKETS-BENCHESNothing owed — awaiting certificate of correction