← Back
Walk-up cooperative
Fillmore Gardens
5607 AVENUE T · Flatlands · BIN 3321581
💬 Discuss this project
1955Year Built
2Stories
C6Building Class
R5Zoning
18,576 sfGross Floor Area
22Units
7 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: FILLMORE GARDENS CO-OPERATIVE, INC. · 27,770 sf lot · 0.67 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Floor 51p · 1 filing · 10 docs
Floor 41p · 1 filing · 10 docs
Floor 3
Floor 2
Floor 11p · 2 filings · 8 docs
Cellar3p · 3 filings · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.510/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLPRO GENERAL CNTRTING CGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808303/21/2023
Building Lifecycle
All (27)Filed (5)Permit Issued (4)Signed Off (3)Violation (6)Inspection (4)Special Inspection (5)
11/14/2023
Signed off — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051451-I1
11/03/2023
Signed off — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL NEW GAS HOT WATER HEATER AND STORAGE TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08052570-I1
11/03/2023
Signed off — Alteration
CONNECT EXISTING GAS METER AND GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER, INSTALL NEW GAS HOT WATER HEATER AND TWO (2) STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051456-I1
10/10/2023
Filed — Alteration
CONNECT EXISTING GAS METER AND GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER, INSTALL NEW GAS HOT WATER HEATER AND TWO (2) STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051456-P2
10/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
10/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2023
Permit issued — Plumbing
B08051456-I1-PL
09/27/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/11/2023
Filed — Alteration
CONNECT EXISTING GAS METER AND GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER, INSTALL NEW GAS HOT WATER HEATER AND TWO (2) STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051456-P1
08/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/29/2023
Permit issued — Mechanical Systems
B08052570-I1-MS
03/27/2023
Permit issued — Boiler Equipment
B08051451-I1-BE
03/27/2023
Permit issued — Plumbing
B08051456-I1-PL
03/21/2023
Filed — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051451-I1
03/21/2023
Filed — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL NEW GAS HOT WATER HEATER AND STORAGE TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08052570-I1
03/21/2023
Filed — Alteration
CONNECT EXISTING GAS METER AND GAS PIPING TO REPLACEMENT BOILER AND GAS BURNER, INSTALL NEW GAS HOT WATER HEATER AND TWO (2) STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08051456-I1
03/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
12/16/2022
Violation issued (HPD, open)
I
12/15/2022
Violation issued (HPD, open)
C
12/15/2022
Violation issued (HPD, open)
C
12/15/2022
Violation issued (HPD, open)
B
12/15/2022
Special inspection requirement — Maintenance information
Joseph Bazini
12/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG10/02/2023
DOB NOWMechanical SystemsSigned-offALLPRO GENERAL CNTRTING C03/29/2023
DOB NOWBoiler EquipmentSigned-offJOHN FITZGERALD PLBG &HTG03/27/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/27/2023
1 project · most recent 05/03/2023
Boiler Controls
FiledStatusContractorScope
05/03/2023CompleteSTX ELECTRICAL CORPBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/10/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
08/28/2023Tenant Protection Plan Compliance—special
03/20/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
12/15/2022Maintenance informationJoseph Bazinienergy_progress
12/15/2022HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B08052570-I1Request digital key ↗
08/27/2026B08051451-I1Request digital key ↗
08/26/2026B08051456-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B08051456-P1Open ↗
08/26/2026B08051456-I1Open ↗
08/26/2026B08051456-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B08051451-I1Open ↗
09/02/2026B08051456-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B08051451-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B08051456-I1Open ↗
08/26/2026B08051456-P2Open ↗
08/26/2026B08051456-P1Open ↗
Showing 3 of 5 on file for this type