Three families
561 DRIGGS AVENUE
BROOKLYN · BIN 3062107
💬 Discuss this project
1899Year Built
4Stories
C0Building Class
R6BZoning
2,735 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: WHITEHALL ENNISMORE DRIGGS LLC · 1,348 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof7p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 43p · 2 filings · 17 docs
Floor 37p · 3 filings · 20 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2019$2.2M—Private party → WHITEHALL ENNISMORE DRIGGS LLC$804/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. CALLAHAN CONSULTING, INC.603/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MILLENIUM CENT CONTR CORPGeneral Contractor3507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
ANESIS SERVICES CORPFire Protection107/08/2026
SCOTT GLASSElectrical103/21/2026
JUST PLBG & HTG INCPlumbing107/08/2026
MARATHON MECHANICAL LLCPlumbing107/08/2026
MYRTO PLUMBING & HVAC CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'ANTONIO CONSULTING ENGI931411/08/2021
PSI AGENCY INC.254204/06/2020
Building Lifecycle
All (77)Filed (7)Permit Issued (17)Signed Off (5)Violation (18)Special Inspection (30)
03/22/2023
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
01/05/2022
Signed off — Alteration
Plumbing and sprinkler in conjunction with alteration
B00324237-I1
11/15/2021
Signed off — Alteration
Mechanical work in conjunction with Alteration
B00324279-I1
11/12/2021
Special inspection requirement — HVAC insulation and sealing
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — HVAC and service water heating equipment
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Shutoff dampers
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — HVAC and service water heating system controls
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Maintenance information
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Electrical energy consumption
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Energy Code Compliance Inspections
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Heating Systems
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Post-installed Anchors
GAETANO D'ANTONIO
11/12/2021
Special inspection requirement — Final
GAETANO D'ANTONIO
11/08/2021
Filed — Alteration
Mechanical work in conjunction with Alteration
B00324279-P1
11/04/2021
Special inspection requirement — Shutoff dampers
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Heating Systems
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Post-installed Anchors
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Energy Code Compliance Inspections
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Final
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Electrical energy consumption
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — HVAC insulation and sealing
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — Maintenance information
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — HVAC and service water heating system controls
GAETANO D'ANTONIO
11/04/2021
Special inspection requirement — HVAC and service water heating equipment
GAETANO D'ANTONIO
09/30/2021
Special inspection requirement — Sprinkler Systems
GAETANO D'ANTONIO
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
GAETANO D'ANTONIO
09/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
GAETANO D'ANTONIO
09/28/2021
Filed — Alteration
Plumbing and sprinkler in conjunction with alteration
B00324237-P1
09/27/2021
Signed off — Alteration
B00355791-I1
09/27/2021
Special inspection requirement — Energy Code Compliance Inspections
GAETANO D'ANTONIO
09/27/2021
Special inspection requirement — Sprinkler Systems
GAETANO D'ANTONIO
09/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
GAETANO D'ANTONIO
08/18/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND SUPPORT PIPE SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00425680-I1
08/09/2021
Permit issued — Mechanical Systems
B00324279-I1-MS
08/09/2021
Permit issued — Construction Fence
B00355791-I1-FN
08/03/2021
Signed off — Alteration
B00324193-I1
08/03/2021
Permit issued — Plumbing
B00324237-I1-PL
08/02/2021
Permit issued — Structural
B00324193-I1-ST
05/19/2021
Permit issued — Structural
B00324193-I1-ST
05/17/2021
Permit issued — Mechanical Systems
B00324279-I1-MS
05/17/2021
Permit issued — Construction Fence
B00355791-I1-FN
05/04/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (ECB, closed)
Construction
04/30/2021
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
04/02/2021
Permit issued — Construction Fence
B00355791-I1-FN
04/01/2021
Permit issued — Plumbing
B00324237-I1-PL
03/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2021
Permit issued — Plumbing
B00324237-I1-EW-SP
03/08/2021
Permit issued — Construction Fence
B00355791-I1-FN
01/13/2021
Violation issued (ECB, closed)
Construction
01/13/2021
Violation issued (ECB, closed)
Construction
01/13/2021
Violation issued (ECB, closed)
Unknown
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMILLENIUM CENT CONTR CORP08/09/2021
DOB NOWConstruction FenceSigned-offMILLENIUM CENT CONTR CORP08/09/2021
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK08/03/2021
DOB NOWStructuralSigned-offMILLENIUM CENT CONTR CORP08/02/2021
DOB NOWStructuralSigned-offMILLENIUM CENT CONTR CORP05/19/2021
DOB NOWMechanical SystemsSigned-offMILLENIUM CENT CONTR CORP05/17/2021
DOB NOWConstruction FenceSigned-offMILLENIUM CENT CONTR CORP05/17/2021
DOB NOWConstruction FenceSigned-offMILLENIUM CENT CONTR CORP04/02/2021
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC04/01/2021
DOB NOWPlumbingSigned-offTHOMAS FAY03/09/2021
DOB NOWConstruction FenceSigned-offMILLENIUM CENT CONTR CORP03/08/2021
DOB NOWSprinklersSigned-offMYRTO PLUMBING & HVAC COR12/21/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/12/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/12/2020
DOB NOWMechanical SystemsSigned-offMILLENIUM CENT CONTR CORP10/02/2020
DOB NOWStructuralSigned-offMILLENIUM CENT CONTR CORP08/27/2020
DOB NOWConstruction FenceSigned-offMILLENIUM CENT CONTR CORP06/15/2020
BIS—ISSUEDMILLENIUM CENT CONTR CORP08/06/2021
BIS—ISSUEDMILLENIUM CENT CONTR CORP08/28/2020
BIS—ISSUEDMILLENIUM CENT CONTR CORP08/28/2020
2 projects · most recent 02/16/2022
General Wiring
FiledStatusContractorScope
02/16/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
11/09/2020CompleteV. VASS ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/12/2021HVAC insulation and sealing GAETANO D'ANTONIOenergy_progress
11/12/2021HVAC and service water heating equipment GAETANO D'ANTONIOenergy_progress
11/12/2021Shutoff dampersGAETANO D'ANTONIOenergy_progress
11/12/2021HVAC and service water heating system controls GAETANO D'ANTONIOenergy_progress
11/12/2021Maintenance informationGAETANO D'ANTONIOenergy_progress
11/12/2021Electrical energy consumptionGAETANO D'ANTONIOenergy_progress
11/12/2021Energy Code Compliance InspectionsGAETANO D'ANTONIOprogress
11/12/2021Heating SystemsGAETANO D'ANTONIOspecial
11/12/2021Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
11/12/2021Mechanical SystemsGAETANO D'ANTONIOspecial
11/12/2021Post-installed AnchorsGAETANO D'ANTONIOspecial
11/12/2021FinalGAETANO D'ANTONIOprogress
11/04/2021Shutoff dampersGAETANO D'ANTONIOenergy_progress
11/04/2021Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
11/04/2021Heating SystemsGAETANO D'ANTONIOspecial
11/04/2021Mechanical SystemsGAETANO D'ANTONIOspecial
11/04/2021Post-installed AnchorsGAETANO D'ANTONIOspecial
11/04/2021Energy Code Compliance InspectionsGAETANO D'ANTONIOprogress
11/04/2021FinalGAETANO D'ANTONIOprogress
11/04/2021Electrical energy consumptionGAETANO D'ANTONIOenergy_progress
11/04/2021HVAC insulation and sealing GAETANO D'ANTONIOenergy_progress
11/04/2021Maintenance informationGAETANO D'ANTONIOenergy_progress
11/04/2021HVAC and service water heating system controls GAETANO D'ANTONIOenergy_progress
11/04/2021HVAC and service water heating equipment GAETANO D'ANTONIOenergy_progress
09/30/2021Sprinkler SystemsGAETANO D'ANTONIOspecial
Latest 25 of 31.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00324279-I1Request digital key ↗
08/15/2026B00324279-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00324237-I1Request digital key ↗
08/15/2026B00324237-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00324237-P1Request digital key ↗
09/02/2026B00324237-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00425680-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00355791-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00425680-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00324193-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
02/01/2023321589401Open ↗
01/24/2023321589401Open ↗
01/19/2023321589401Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION3
10/28/2020321589401Open ↗
10/28/2020321589401Open ↗
10/28/2020321589401Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/27/2021321589401Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/18/2020321589401Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/18/2020321589401Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/04/2020321589401Open ↗
▸BISVERIFY TAX LOT1
08/18/2021321589401Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/16/2022321589401Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/18/2021321589401Open ↗
▸BISZONING DIAGRAM1
08/20/2020321589401Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/04/2020321589401Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
08/06/2020321589401Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature21
08/31/2026B00324279-I1Open ↗
08/31/2026B00324279-I1Open ↗
08/31/2026B00324279-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026B00324279-I1Open ↗
08/31/2026B00324279-I1Open ↗
08/31/2026B00324279-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026B00425680-I1Open ↗
08/13/2026B00355791-I1Open ↗
08/13/2026B00324279-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA1
02/13/2023321589401Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/17/2022321589401Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/17/2022321589401Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
05/30/2023321589401Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
02/24/2023321589401Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
05/15/2020321589401Open ↗
04/13/2020321589401Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
10/28/2020321589401Open ↗
04/13/2020321589401Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/13/2020321589401Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/04/2020321589401Open ↗
▸BISTenant Protection Plan and Notes1
05/15/2020321589401Open ↗
▸BISANTI-HARASSMENT AREA CHECKLIST1
07/22/2020321589401Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00324193-I1Open ↗
08/13/2026B00324279-I1Open ↗
08/13/2026B00324237-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/22/2020321589401Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/18/2020321589401Open ↗
04/13/2020321589401Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/17/2022321589401Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/17/2022321589401Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/20/2020321589401Open ↗
▸BISINTERIOR LIGHTING POWER1
02/17/2022321589401Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/17/2022321589401Open ↗
▸BISFENESTRATION AREAS1
02/17/2022321589401Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/17/2022321589401Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/17/2022321589401Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/17/2022321589401Open ↗
▸BISLIGHTING CONTROLS1
02/17/2022321589401Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/17/2022321589401Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/18/2021321589401Open ↗
08/18/2020321589401Open ↗
08/18/2020321589401Open ↗
Showing 3 of 7 on file for this type
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
07/22/2020321589401Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/23/2023321589401Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/17/2022321589401Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/02/2022321589401Open ↗
▸BISPOST-INSTALLED ANCHORS1
08/13/2020321589401Open ↗
▸BISSOIL REPORT1
07/22/2020321589401Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE8
02/01/2023321589401Open ↗
01/24/2023321589401Open ↗
01/19/2023321589401Open ↗
Showing 3 of 8 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
05/15/2020321589401Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/13/2022321589401Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/28/2020321589401Open ↗
08/21/2020321589401Open ↗
08/20/2020321589401Open ↗
▸BISCOST AFFIDAVIT1
04/13/2020321589401Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/17/2022321589401Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/28/2020321589401Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/13/2021321589401Open ↗
▸BISEFILING COVER SHEET1
03/23/2020321589401Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
08/21/2020321589401Open ↗
08/12/2020321589401Open ↗
08/06/2020321589401Open ↗
Showing 3 of 6 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
06/04/2020321589401Open ↗
▸BISPLOT DIAGRAM1
04/13/2020321589401Open ↗