← Back
Public elementary, junior or senior high
P.S. 190 Sheffield
561 GEORGIA AVENUE · East New York-New Lots · BIN 3085491
💬 Discuss this project
1950Year Built
5Stories
W1Building Class
R6Zoning
177,902 sfGross Floor Area
2Units
LL97 Covered20 Open Violations 11 unresolved · 9 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 58,500 sf lot · 3.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPT. OF EDUCATION 0403/22/2026
DEPT OF EDUCATION PS 190903/22/2026
DEPARTMENT OF EDUCATION503/22/2026
NEHAL CONTRACTING203/22/2026
DOE PS 190 0401103/22/2026
DEPT. OF EDUCATION P.S.19203/22/2026
PS 190 0503/22/2026
PS 190 DOE1603/22/2026
PS. 190 DEPT OF EDUCATION703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY402/11/2026
LANGAN ENGINEERING102/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY403/21/2026
PURCELL EVERETT ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
FRANCIS RICHARDSElectrical203/21/2026
SEZEKCOL ELECTRIC INCElectrical103/22/2026
THOMAS STONEElectrical103/21/2026
VITO MAMMANAElectrical103/21/2026
Building Lifecycle
All (84)Filed (5)Violation (60)Objection (2)Special Inspection (17)
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2026
Special inspection requirement — Post-installed Anchors
03/03/2026
Special inspection requirement — Concrete - Cast-In-Place
03/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/03/2026
Special inspection requirement — Structural Steel - Details
03/03/2026
Special inspection requirement — Structural Steel - Welding
03/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/03/2026
Special inspection requirement — Post-installed Anchors
02/26/2026
Violation issued (FDNY_ORDER, closed)
02/11/2026
Filed — Alteration
B01320289-S3
02/11/2026
Filed — Alteration
B01320289-S2
02/11/2026
Filed — Alteration
B01320289-S1
02/10/2026
Filed — Alteration
B01320289-I1
02/06/2026
Special inspection requirement — Post-installed Anchors
02/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/18/2025
Special inspection requirement — Mechanical Systems
11/18/2025
Special inspection requirement — Final
11/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/18/2025
Special inspection requirement — Final
11/17/2025
Special inspection requirement — Masonry
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/30/2025
Violation issued (FDNY_NOV, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
08/25/2025
Violation issued (FDNY_NOV, closed)
05/29/2025
Violation issued (FDNY_NOV, closed)
05/01/2025
Violation issued (ECB, open)
Construction
05/01/2025
Violation issued (ECB, open)
Construction
11/13/2024
Violation issued (FDNY_NOV, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
06/12/2024
Violation issued (FDNY_ORDER, closed)
02/07/2024
Violation issued (ECB, open)
Construction
02/07/2024
Violation issued (ECB, open)
Construction
01/19/2024
Violation issued (FDNY_NOV, closed)
03/01/2023
Objection raised — Other
03/01/2023
Objection resolved — Addressed
02/22/2023
Filed — Alteration
Addition of a ramp around the existing building vault to provide egress from the existing door located above the vault.
B00830711-I1
02/16/2023
Special inspection requirement — Final
01/20/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Violation issued (ECB, open)
Construction
01/20/2023
Violation issued (ECB, open)
Construction
01/20/2023
Violation issued (ECB, closed)
Construction
08/04/2022
Violation issued (FDNY_NOV, closed)
01/28/2022
Violation issued (ECB, closed)
Construction
01/28/2022
Violation issued (ECB, open)
Construction
08/05/2021
Violation issued (ECB, closed)
Unknown
07/22/2021
Violation issued (FDNY_NOV, closed)
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDKEL-TECH CONSTRUCTION INC12/08/2011
BISOTISSUEDKEL-TECH CONSTRUCTION INC12/08/2011
BISPLISSUEDVARSITY PLBG AND HTG INC11/09/2011
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/21/2011
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/21/2011
BISEQISSUEDKEL-TECH CONSTRUCTION INC03/21/2011
BISOTISSUEDREBT CORP12/22/2010
BISPLISSUEDVITAL PLUMBING, INC12/16/2010
BISOTISSUEDKEL-TECH CONSTRUCTION INC11/26/2010
BISOTRE-ISSUEDKEL-TECH CONSTRUCTION INC11/26/2010
BISPLISSUEDVARSITY PLBG AND HTG INC11/26/2010
BISEQISSUEDKEL-TECH CONSTRUCTION INC07/13/2010
BISOTISSUEDDRAGAN-DJORDLE CONSTRUCTION CORP06/01/2006
BISCCISSUEDSTONEWALL CONTRACTING CORP12/28/1999
BISCCISSUEDSTONEWALL CONTRACTING CORPORATIO12/28/1999
BISCCISSUEDSTONEWALL CONTRACTING CORP12/28/1999
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING10/21/1998
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING08/14/1998
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING10/17/1997
BIS—ISSUEDLEEWEN MECHANICAL CORPORATION05/23/1997
BISEQISSUEDLEEWEN MECHANICAL CORPORATION05/23/1997
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING08/07/1996
BISFPISSUEDSENTINEL FIRE CONTROL, INC.08/24/1994
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING04/01/1994
BIS—ISSUEDLEEWEN MECHANICAL CORPORATION04/01/1994
BISEQISSUEDLEEWEN MECHANICAL CORPORATION04/01/1994
7 projects · most recent 11/21/2025
General Wiring Lighting
FiledStatusContractorScope
11/21/2025CompleteCHARAN ELEC'L ENTERP'S IN—
02/07/2025CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
08/19/2024Permit IssuedVIAL ELECTRIC & COMPANYLighting
04/13/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
02/11/2022CompleteABM ELECTRIC, INC—
03/04/2021CompleteABM ELECTRIC, INC—
02/13/2019Permit IssuedA & S ELECTRIC INC.General Wiring
1 project · most recent 02/22/2023
FiledStatusContractorScope
02/22/2023——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/27/2026Fire-Resistant Penetrations and Joints—special
03/27/2026Post-installed Anchors—special
03/03/2026Concrete - Cast-In-Place—special
03/03/2026Fire-Resistance Rated Construction—progress
03/03/2026Structural Steel - Details—special
03/03/2026Structural Steel - Welding—special
03/03/2026Structural Steel - High Strength Bolting—special
03/03/2026Post-installed Anchors—special
02/06/2026Post-installed Anchors—special
02/06/2026Structural Stability – Alterations of existing buildings—special
11/18/2025Mechanical Systems—special
11/18/2025Final—progress
11/18/2025Structural Stability – Alterations of existing buildings—special
11/18/2025Final—progress
11/17/2025Masonry—special
11/17/2025Fire-Resistant Penetrations and Joints—special
02/16/2023Final—progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01320289-S3Request digital key ↗
08/18/2026B01320289-S2Request digital key ↗
08/18/2026B01320289-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2010320212783Open ↗
▸BISWORK PERMIT APPLICATION1
09/13/2010320212783Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00830711-I1Open ↗
08/18/2026B01320289-S2Open ↗
08/18/2026B01320289-S3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
09/13/2010320212783Open ↗
01/18/2011320212783Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/13/2010320212783Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/13/2010320212783Open ↗
▸Trade Schedules & Equipment1
▸BISSELF-CERT PLUMBING NOTICE1
11/16/2010320212783Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
09/13/2010320212783Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026B01320289-S3Open ↗
08/13/2026B00830711-I1Open ↗
08/13/2026B01320289-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026B01320289-S1Open ↗
08/13/2026B01320289-S3Open ↗
08/13/2026B00830711-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/18/2011320212783Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/18/2011320212783Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2010320212783Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/18/2011320212783Open ↗
09/13/2010320212783Open ↗
▸Filing & Intake Forms1
▸BISeFiling Job Application Cover Sheet1
09/13/2010320212783Open ↗
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/13/2026B00830711-I1Open ↗
08/13/2026B01320289-S1Open ↗
08/13/2026B01320289-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026B01320289-I1Open ↗