← Back
BROOKLYN
561 Pacific Condominium
561 PACIFIC STREET · BIN 3001020
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Open Violations ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingOther
Roof2p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 117p · 4 filings · 20 docs
Cellar17p · 5 filings · 20 docs
Sub-Cellar12p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY2307/08/2026
ADAM AMERICA REAL ESTATE1307/08/2026
263 REALTY507/08/2026
NIOS807/08/2026
561 PACIFIC STREET OWNER LLC1603/22/2026
METRO CONTRACTING NY203/21/2026
561 PACIFIC1203/21/2026
CHURCH OF THE REDEEMER C O203/21/2026
ADAM AMERICA1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
MA DESIGNS NYC903/21/2026
KD DESIGNS603/21/2026
DOMANI CONSULTING103/21/2026
BIG ORANGE EXPEDITING203/21/2026
PONDOSA DESIGN INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor1407/08/2026
BRITT REALTY LLCGeneral Contractor1207/08/2026
PRINCIPAL BUILDERS SOLUTIGeneral Contractor1007/08/2026
ALL ABOUT AC CORPGeneral Contractor703/22/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor407/08/2026
ABRAHAM GELBElectrical303/21/2026
NYC RENOVATION INCGeneral Contractor303/21/2026
S F ELECTRICAL SERVICE IN 004727General Contractor303/22/2026
EVAN C LAI LANDSCAPE DESIGNGeneral Contractor203/21/2026
KATAN P & H INCPlumbing207/08/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
ATMOS ELECTRIC SVCE CORPElectrical103/22/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
PROTO P & H SERVICES CORPPlumbing107/08/2026
ERAN CHENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254408/22/2023
JAY KAVI CORPORATION8500407/01/2023
1+1 DESIGN STUDIO LLC1039107/06/2022
NY RESTORATION TECHNOLOGY6187204/22/2022
SYNERGY ENGINEERING784310/12/2021
ASHRAF CORPORATION1973106/22/2021
Building Lifecycle
All (173)Filed (28)Permit Issued (27)Signed Off (15)Violation (60)Inspection (8)Objection (8)Special Inspection (27)
02/26/2026
Violation issued (ECB, closed)
Elevators
02/26/2026
Violation issued (ECB, closed)
Elevators
09/12/2023
Signed off — Alteration
Install new elevator as per plans filed.
B00605411-I1
09/11/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/22/2023
Filed — Alteration
Install new elevator as per plans filed.
B00605411-P1
07/14/2023
Signed off — Alteration
INSTALL NEW COMMERCIAL EXHAUST HOOD, HVAC, AND REFRIGERATION COMPRESSORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00447254-I1
07/14/2023
Signed off — Alteration
INTERIOR CONSTRUCTION AT FIRST FLOOR RETAIL SPACE #1. INSTALLING NEW SHELVING, FRIDGES, AND NEW DELI AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00446860-I1
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
07/05/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
07/01/2023
Filed — Alteration
INTERIOR CONSTRUCTION AT FIRST FLOOR RETAIL SPACE #1. INSTALLING NEW SHELVING, FRIDGES, AND NEW DELI AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00446860-P2
07/01/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
07/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
06/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM HOQUE
06/21/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
06/21/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
06/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
AKM HOQUE
06/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
AKM HOQUE
06/19/2023
Filed — Alteration
INSTALL NEW COMMERCIAL EXHAUST HOOD, HVAC, AND REFRIGERATION COMPRESSORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00447254-P1
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM HOQUE
05/31/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
05/31/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
05/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
AKM HOQUE
05/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
AKM HOQUE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2023
Signed off — Alteration
B00003081-I1
04/03/2023
Violation issued (HPD, closed)
A
03/09/2023
Signed off — Alteration
B00692484-I1
03/08/2023
Signed off — Alteration
INSTALL NEW SINKS, LAVATORIES, WATER FOUNTAIN, TOILETS, WATER HEATER, AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00722377-I1
02/21/2023
Signed off — Alteration
B00603846-I1
02/17/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/16/2023
Permit issued — Mechanical Systems
B00603846-I1-MS
02/14/2023
Signed off — Alteration
B00755686-I1
02/13/2023
Permit issued — Mechanical Systems
B00603846-I1-MS
01/18/2023
Signed off — Alteration
Structural work to install new elevator as per plans filed.
B00609056-I1
12/21/2022
Permit issued — General Construction
B00755686-I1-GC-CX
12/12/2022
Signed off — Alteration
B00603832-I1
12/01/2022
Signed off — Alteration
Installation of plumbing fixtures for dental office as per plans filed herewith.
B00603823-I1
12/01/2022
Signed off — Alteration
B00603794-I1
08/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2022
Signed off — Alteration
B00519515-I1
07/06/2022
Filed — Alteration
B00755686-I1
05/26/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/22/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2022
Permit issued — Plumbing
B00722377-I1-PL
04/26/2022
Objection raised — Scope
04/26/2022
Objection resolved — Addressed
04/22/2022
Filed — Alteration
INSTALL NEW SINKS, LAVATORIES, WATER FOUNTAIN, TOILETS, WATER HEATER, AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00722377-I1
04/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hamidreza Saghari
04/05/2022
Permit issued — General Construction
B00692484-I1-GC
03/14/2022
Filed — Alteration
B00692484-I1
03/10/2022
Violation issued (ECB, closed)
Construction
03/02/2022
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES, PIPING, NEW COOKING EQUIPMENT, AND GAS PIPING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00447149-I1
02/24/2022
Permit issued — Plumbing
B00603823-I1-PL
02/23/2022
Permit issued — Sprinklers
B00603832-I1-EW-SP
02/18/2022
Permit issued — Plumbing
B00447149-I1-PL
02/08/2022
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES, PIPING, NEW COOKING EQUIPMENT, AND GAS PIPING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B00447149-P3
01/31/2022
Permit issued — General Construction
B00603794-I1-GC
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPRINCIPAL BUILDERS SOLUTI02/16/2023
DOB NOWMechanical SystemsSigned-offPRINCIPAL BUILDERS SOLUTI02/13/2023
DOB NOWGeneral ConstructionSigned-offEVAN C LAI LANDSCAPE DESI12/21/2022
DOB NOWPlumbingSigned-offPROTO P & H SERVICES CORP05/06/2022
DOB NOWGeneral ConstructionSigned-offNYC RENOVATION INC04/05/2022
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP02/24/2022
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP02/23/2022
DOB NOWPlumbingSigned-offKATAN P & H INC02/18/2022
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI01/31/2022
DOB NOWStructuralPermit IssuedALL ABOUT AC CORP12/27/2021
DOB NOWGeneral ConstructionSigned-offALL ABOUT AC CORP12/06/2021
DOB NOWMechanical SystemsSigned-offPRINCIPAL BUILDERS SOLUTI10/19/2021
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO08/12/2021
DOB NOWMechanical SystemsSigned-offSUPERIOR FIRE CONTROL INC02/23/2021
DOB NOWGeneral ConstructionSigned-offSUPERIOR FIRE CONTROL INC02/17/2021
DOB NOWPlumbingSigned-offKATAN P & H INC02/10/2021
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC01/21/2020
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC01/13/2020
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC12/17/2019
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP10/15/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/11/2019
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP10/11/2019
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC07/19/2019
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP11/02/2018
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP11/02/2018
DOB NOWConstruction FenceSigned-offROCK GROUP NY CORP11/02/2018
DOB NOWConstruction FenceSigned-offBRITT REALTY LLC01/26/2018
BISOTISSUEDBRITT REALTY LLC02/01/2023
BIS—ISSUEDBRITT REALTY LLC05/18/2020
BISPLISSUEDPROTO P & H SERVICES CORP04/30/2020
BIS—ISSUEDBRITT REALTY LLC04/20/2020
BISEQISSUEDBRITT REALTY LLC03/16/2020
BISSPISSUEDA & F FIRE PROTECTION CO02/20/2020
BISSDISSUEDA & F FIRE PROTECTION CO08/15/2019
BISPLISSUEDPROTO P & H SERVICES CORP07/01/2019
BIS—ISSUEDBRITT REALTY LLC05/08/2019
BISEQISSUEDBRITT REALTY LLC04/16/2019
BISSPISSUEDA & F FIRE PROTECTION CO03/28/2019
BIS—RE-ISSUEDBRITT REALTY LLC02/25/2019
BISEQISSUEDROCK GROUP NY CORP02/08/2019
+ 19 more permits on file
14 projects · most recent 01/24/2024
General Wiring
FiledStatusContractorScope
01/24/2024CompleteR.C.M. ELECTRIC CORP.—
09/13/2022CompleteARGON ELECTRICAL CORPGeneral Wiring
04/26/2022CompleteADAM ELECL CONTRNG LLCGeneral Wiring
09/29/2021CompleteATMOS ELECTRIC SVCE CORP—
09/29/2021CompleteATMOS ELECTRIC SVCE CORP—
09/29/2021CompleteATMOS ELECTRIC SVCE CORP—
02/15/2021CompleteWCK ELECTRIC CORP.General Wiring
07/27/2020CompleteILLUMINOUS ELECTRIC CORP.—
07/07/2020CompleteR.C.M. ELECTRIC CORP.—
04/03/2019CompleteS&F ELECTRICAL SERVICE INGeneral Wiring
03/01/2019CompleteS&F ELECTRICAL SERVICE IN—
01/14/2019CompleteLINTECH ELECTRIC, INC.—
01/03/2019CompleteR.C.M. ELECTRIC CORP.General Wiring
08/07/2018CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/11/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/17/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/05/2023Fire-Resistant Penetrations and JointsJay Kavispecial
07/05/2023FinalBRIAN MCCAFFREYprogress
07/01/2023FinalBRIAN MCCAFFREYprogress
07/01/2023Fire-Resistant Penetrations and JointsJay Kavispecial
06/21/2023HVAC-R and service water piping design and insulationAKM HOQUEenergy_progress
06/21/2023Mechanical SystemsJay Kavispecial
06/21/2023FinalBRIAN MCCAFFREYprogress
06/21/2023HVAC-R and service water heating system controlsAKM HOQUEenergy_progress
06/21/2023HVAC-R and service water heating equipmentAKM HOQUEenergy_progress
05/31/2023HVAC-R and service water piping design and insulationAKM HOQUEenergy_progress
05/31/2023Mechanical SystemsJay Kavispecial
05/31/2023FinalBRIAN MCCAFFREYprogress
05/31/2023HVAC-R and service water heating system controlsAKM HOQUEenergy_progress
05/31/2023HVAC-R and service water heating equipmentAKM HOQUEenergy_progress
04/20/2022Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
12/20/2021Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
12/20/2021MasonryMAURICIO ANDRADEspecial
12/20/2021FinalMAURICIO ANDRADEprogress
12/15/2021MasonryMAURICIO ANDRADEspecial
12/15/2021Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
12/15/2021FinalMAURICIO ANDRADEprogress
10/02/2021Fire-Resistance Rated ConstructionAlec Stronginprogress
09/30/2021Interior lighting powerAlec Stronginenergy_progress
09/30/2021Lighting controlsAlec Stronginenergy_progress
09/30/2021Fire-Resistant Penetrations and JointsAlec Stronginspecial
Latest 25 of 27.
▾Documents — 489 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch14
09/03/2026B00003081-I1Request digital key ↗
09/02/2026B00075203-I1Request digital key ↗
09/01/2026B00519515-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence6
09/02/2026B00075203-I1Request digital key ↗
08/15/2026B00075203-P3Request digital key ↗
08/15/2026B00075203-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold6
09/02/2026B00075203-I1Request digital key ↗
08/15/2026B00075203-P5Request digital key ↗
08/15/2026B00075203-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed6
09/02/2026B00075203-I1Request digital key ↗
08/15/2026B00075203-P4Request digital key ↗
08/15/2026B00075203-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00447149-P3Request digital key ↗
09/01/2026B00447149-I1Request digital key ↗
09/01/2026B00447149-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00446860-I1Request digital key ↗
09/01/2026B00446860-P2Request digital key ↗
09/01/2026B00446860-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00447254-I1Request digital key ↗
09/01/2026B00447254-P1Request digital key ↗
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION61
05/08/2024321193285Open ↗
05/02/2024321193285Open ↗
12/18/2023321193285Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION29
02/01/2023340729778Open ↗
05/19/2020321193285Open ↗
03/17/2020321193285Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
12/07/2020321193285Open ↗
11/09/2020321193285Open ↗
10/01/2020321193285Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
05/20/2020340548072Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records13
▸BISZONING EXHIBIT IV: CERTIFICATION2
01/30/2020321596046Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION2
12/17/2019321596046Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION2
01/30/2020321596046Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
12/17/2019321596046Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
01/30/2020321596046Open ↗
Showing 1 of 2 on file for this type
▸BISZONING DIAGRAM2
10/11/2019321193285Open ↗
Showing 1 of 2 on file for this type
▸BISVERIFY TAX LOT1
10/06/2022321193285Open ↗
▸Seals & Professional Certifications81
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/03/2026B00003081-I1Open ↗
09/02/2026B00075203-P4Open ↗
09/02/2026B00075203-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026B00609056-P1Open ↗
08/31/2026B00609056-I1Open ↗
08/29/2026B00446860-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/19/2019321193285Open ↗
07/19/2019321193285Open ↗
04/19/2019321193285Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00609056-P1Open ↗
08/31/2026B00609056-I1Open ↗
08/31/2026B00722377-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
06/16/2020340729778Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING25
08/27/2020340506232Open ↗
08/19/2020340506232Open ↗
08/08/2020340506232Open ↗
Showing 3 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
10/14/2022321561494Open ↗
03/08/2021321561500Open ↗
▸BISSPRINKLER SYSTEMS1
02/22/2021340506232Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/09/2020321193285Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
01/22/2020321193285Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/14/2020321193285Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
05/25/2021321193285Open ↗
05/25/2021321193285Open ↗
09/03/2020321193285Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/01/2026B00447254-I1Open ↗
09/01/2026B00603794-I1Open ↗
08/13/2026B00519515-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/03/2020321193285Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY23
05/25/2021321193285Open ↗
05/25/2021321193285Open ↗
05/21/2021321193285Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/28/2022321193285Open ↗
09/09/2020321193285Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
07/13/2022321193285Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISSCHEDULE A - OCCUPANCY / USE16
05/08/2024321193285Open ↗
05/02/2024321193285Open ↗
12/18/2023321193285Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/13/2023340729778Open ↗
10/25/2022321561494Open ↗
03/23/2021321561500Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/11/2020340548072Open ↗
01/30/2020321596046Open ↗
01/21/2020340548072Open ↗
Showing 3 of 6 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER4
05/19/2020321193285Open ↗
05/09/2019321193285Open ↗
02/25/2019321193285Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
02/06/2023340729778Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT7
10/06/2022321561494Open ↗
02/11/2021340534871Open ↗
02/09/2021321561500Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
12/14/2018321193285Open ↗
12/14/2018321193285Open ↗
Showing 2 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/10/2023340729778Open ↗
10/07/2022321561494Open ↗
▸Filing & Intake Forms73
▸BISADDITIONAL INFORMATION53
08/08/2025321193285Open ↗
07/03/2023321193285Open ↗
09/16/2022321193285Open ↗
Showing 3 of 53 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
06/16/2020340729778Open ↗
Showing 1 of 8 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
05/26/2020321561500Open ↗
02/04/2020321193285Open ↗
Showing 2 of 4 on file for this type
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION6
09/09/2020321193285Open ↗
Showing 1 of 6 on file for this type
▸BISTCO - Supporting Documents4
06/17/2021321193285Open ↗
05/21/2021321193285Open ↗
02/18/2021321193285Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/09/2020321193285Open ↗
09/09/2020321193285Open ↗
Showing 2 of 3 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN1
10/27/2022321193285Open ↗
▸BISPLOT DIAGRAM1
01/30/2020321596046Open ↗