← Back
Primarily 2 family with 1 store or office
5611 8 AVENUE
BROOKLYN · BIN 3139844
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6Zoning
3,588 sfGross Floor Area
3Units
12 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 5611 8TH AVENUE LLC · 1,600 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5803 5TH AVE LLC2303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2019$5.7M—— → —$1,589/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC211/30/2020
ALBERTO ROMAN403/03/2020
NYX ENGINEERING, PLLC302/05/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing607/08/2026
KJK ELECTRIC INCElectrical103/21/2026
KJK ELECTRIC INCElectrical103/22/2026
ZHENG LIElectrical103/21/2026
SUPERB CONSTRUCTION MGTGeneral Contractor103/22/2026
Building Lifecycle
All (36)Filed (9)Permit Issued (2)Signed Off (2)Violation (16)Special Inspection (7)
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/30/2020
Filed — Alteration
INSTALL VIESSMANN TANKLESS COIL WITH BOILER AT 3RD FLOOR.
B00395477-S1
10/08/2020
Filed — Alteration
INSTALL VIESSMANN TANKLESS COIL WITH BOILER AT 3RD FLOOR.
B00395477-I1
09/05/2020
Special inspection requirement — HVAC and service water heating system controls
JIE ZHU
09/05/2020
Special inspection requirement — Shutoff dampers
JIE ZHU
09/05/2020
Special inspection requirement — HVAC and service water heating equipment
JIE ZHU
07/30/2020
Violation issued (HPD, open)
C
03/23/2020
Signed off — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT CELLAR AND 1ST FLOOR. INSTALL NEW 1 WC., 1 LAV., 1 FLOOR DRAIN AND 1 HOT WATER HEATER AT CELLAR; 1 WC., 1 LAV., AND 1 FLOOR DRAIN AT 1ST FLOOR. REPLACE 1 AREA DRAIN AT OPEN SPACE.
B00285632-I1
03/23/2020
Signed off — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 2ND FLOOR. INSTALL NEW 2 SHOWER, 2 WC., 2 LAV.,1 SINK , 1 FLOOR DRAIN, 1 GAS RANGE, 1 TANKLESS COIL WITH BOILER AT 2ND FLOOR. REPLACE EXISTING 2 ROOF DRAIN.
B00251404-I1
03/03/2020
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT CELLAR AND 1ST FLOOR. INSTALL NEW 1 WC., 1 LAV., 1 FLOOR DRAIN AND 1 HOT WATER HEATER AT CELLAR; 1 WC., 1 LAV., AND 1 FLOOR DRAIN AT 1ST FLOOR. REPLACE 1 AREA DRAIN AT OPEN SPACE.
B00285632-P3
02/05/2020
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 2ND FLOOR. INSTALL NEW 2 SHOWER, 2 WC., 2 LAV.,1 SINK , 1 FLOOR DRAIN, 1 GAS RANGE, 1 TANKLESS COIL WITH BOILER AT 2ND FLOOR. REPLACE EXISTING 2 ROOF DRAIN.
B00251404-P2
02/04/2020
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT CELLAR AND 1ST FLOOR. INSTALL NEW 1 WC., 1 LAV., 1 FLOOR DRAIN AND 1 HOT WATER HEATER AT CELLAR; 1 WC., 1 LAV., AND 1 FLOOR DRAIN AT 1ST FLOOR. REPLACE 1 AREA DRAIN AT OPEN SPACE.
B00285632-P2
02/03/2020
Special inspection requirement — HVAC and service water heating equipment
Xiao Huang
02/03/2020
Special inspection requirement — HVAC and service water heating system controls
Xiao Huang
01/06/2020
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT CELLAR AND 1ST FLOOR. INSTALL NEW 1 WC., 1 LAV., 1 FLOOR DRAIN AND 1 HOT WATER HEATER AT CELLAR; 1 WC., 1 LAV., AND 1 FLOOR DRAIN AT 1ST FLOOR. REPLACE 1 AREA DRAIN AT OPEN SPACE.
B00285632-P1
01/03/2020
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 2ND FLOOR. INSTALL NEW 2 SHOWER, 2 WC., 2 LAV.,1 SINK , 1 FLOOR DRAIN, 1 GAS RANGE, 1 TANKLESS COIL WITH BOILER AT 2ND FLOOR. REPLACE EXISTING 2 ROOF DRAIN.
B00251404-P1
01/02/2020
Permit issued — Plumbing
B00285632-I1-PL
01/02/2020
Special inspection requirement — HVAC and service water heating system controls
Xiao Huang
01/02/2020
Special inspection requirement — HVAC and service water heating equipment
Xiao Huang
12/20/2019
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT CELLAR AND 1ST FLOOR. INSTALL NEW 1 WC., 1 LAV., 1 FLOOR DRAIN AND 1 HOT WATER HEATER AT CELLAR; 1 WC., 1 LAV., AND 1 FLOOR DRAIN AT 1ST FLOOR. REPLACE 1 AREA DRAIN AT OPEN SPACE.
B00285632-I1
11/19/2019
Permit issued — Plumbing
B00251404-I1-PL
11/12/2019
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 2ND FLOOR. INSTALL NEW 2 SHOWER, 2 WC., 2 LAV.,1 SINK , 1 FLOOR DRAIN, 1 GAS RANGE, 1 TANKLESS COIL WITH BOILER AT 2ND FLOOR. REPLACE EXISTING 2 ROOF DRAIN.
B00251404-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2004
Violation issued (HPD, open)
A
07/10/2003
Violation issued (HPD, open)
A
07/10/2003
Violation issued (HPD, open)
A
07/10/2003
Violation issued (HPD, open)
A
07/10/2003
Violation issued (HPD, open)
B
07/10/2003
Violation issued (HPD, open)
B
07/10/2003
Violation issued (HPD, open)
A
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/02/2020
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/19/2019
BISOTISSUEDHIGH QUALITY CONSTRUCTION06/26/2020
BISBLISSUEDCATMAN PLUMBING INC02/04/2020
BISOTISSUEDSUPERB CONSTRUCTION MGT11/07/2019
BISOTISSUEDSUPERB CONSTRUCTION MGT10/11/2019
BISOTISSUEDCITY COOLING ENT03/13/2006
1 project · most recent 11/30/2020
Gas
FiledStatusContractorScope
11/30/2020——Gas
1 project · most recent 08/17/2020
FiledStatusContractorScope
08/17/2020CompleteKJK ELECTRIC INC3 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/05/2020HVAC and service water heating system controls JIE ZHUenergy_progress
09/05/2020Shutoff dampersJIE ZHUenergy_progress
09/05/2020HVAC and service water heating equipment JIE ZHUenergy_progress
02/03/2020HVAC and service water heating equipment Xiao Huangenergy_progress
02/03/2020HVAC and service water heating system controls Xiao Huangenergy_progress
01/02/2020HVAC and service water heating system controls Xiao Huangenergy_progress
01/02/2020HVAC and service water heating equipment Xiao Huangenergy_progress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing8
09/02/2026B00251404-I1Request digital key ↗
09/02/2026B00285632-I1Request digital key ↗
09/02/2026B00395477-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00395477-I1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION4
06/26/2020340738795Open ↗
02/14/2020322009401Open ↗
11/08/2019321983957Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/25/2020340738795Open ↗
10/29/2019321983957Open ↗
08/19/2019322009401Open ↗
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
09/16/2019322009401Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B00251404-I1Open ↗
08/13/2026B00395477-S1Open ↗
08/13/2026B00395477-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00251404-P2Open ↗
09/01/2026B00251404-P2Open ↗
08/27/2026B00395477-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/21/2020321983957Open ↗
03/13/2020322009401Open ↗
10/29/2019321983957Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/25/2020340738795Open ↗
10/29/2019321983957Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/25/2020340738795Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/29/2019321983957Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/25/2020340738795Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/25/2020340738795Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00285632-P2Open ↗
08/13/2026B00285632-P3Open ↗
08/13/2026B00251404-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/29/2019321983957Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/21/2020321983957Open ↗
03/13/2020322009401Open ↗
10/29/2019321983957Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/01/2020340738795Open ↗
03/21/2020321983957Open ↗
03/13/2020322009401Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/01/2020340738795Open ↗
06/26/2020340738795Open ↗
06/25/2020340738795Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/25/2020340738795Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/01/2020340738795Open ↗
06/26/2020340738795Open ↗
06/25/2020340738795Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/19/2019322009401Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/21/2020321983957Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/01/2020340738795Open ↗
03/21/2020321983957Open ↗
03/13/2020322009401Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
07/01/2020340738795Open ↗
06/25/2020340738795Open ↗
03/21/2020321983957Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
03/09/2020321983957Open ↗
03/05/2020321983957Open ↗
02/19/2020322009401Open ↗
▸BISEFILING COVER SHEET2
10/31/2019321983957Open ↗
08/19/2019322009401Open ↗
▸BISBOROUGH INTAKE FORM2
03/21/2020321983957Open ↗
03/13/2020322009401Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/25/2020340738795Open ↗