← Back
Two family frame
5612 POST ROAD
BRONX · BIN 2084810
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R3-1Zoning
4,825 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 5,000 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2018$993K—Private party → Private party$206/sf unit
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.101/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A DESIGN AND EXPEDITER CORP.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPE PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969101/21/2021
Building Lifecycle
All (10)Filed (1)Permit Issued (2)Violation (1)Special Inspection (6)
10/22/2021
Permit issued — Plumbing
X00458116-I1-PL
04/02/2021
Permit issued — Plumbing
X00458116-I1-PL
01/21/2021
Filed — Alteration
JOB FILED FOR INSTALL 2 NEW GAS BOILER & 2 NEW GAS HOT WATER HEATING AND RELOCATED EXISTING 2 GAS METER IN EXISTING TWO FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00458116-I1
01/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
01/21/2021
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
01/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jose Pena
01/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Pena
01/21/2021
Special inspection requirement — Maintenance information
Jose Pena
01/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jose Pena
06/19/2001
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPE PLUMBING INC10/22/2021
DOB NOWPlumbingSigned-offCAPE PLUMBING INC04/02/2021
BISOTISSUEDFOX CONSTRUCTION07/12/2001
BISCCISSUEDFOX CONSTRUCTION07/12/2001
1 project · most recent 01/21/2021
Gas
FiledStatusContractorScope
01/21/2021Signed-offCAPE PLUMBING INCGas
1 project · most recent 04/02/2020
FiledStatusContractorScope
04/02/2020CompleteMARTINEZ ELECTRICAL CONT—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/21/2021Fire-Resistant Penetrations and JointsJose Penaspecial
01/21/2021Energy Code Compliance InspectionsJose Penaprogress
01/21/2021HVAC-R and service water heating equipmentJose Penaenergy_progress
01/21/2021HVAC-R and service water piping design and insulationJose Penaenergy_progress
01/21/2021Maintenance informationJose Penaenergy_progress
01/21/2021HVAC-R and service water heating system controlsJose Penaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00458116-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026X00458116-I1Open ↗
08/26/2026X00458116-I1Open ↗
08/26/2026X00458116-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X00458116-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X00458116-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00458116-I1Open ↗