← Back
Three families
562 WEST 162 STREET
MANHATTAN · BIN 1062855
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R7-2Zoning
3,525 sfGross Floor Area
3Units
Rent Stabilized29 Open Violations 26 unresolved · 3 paperwork only ▸
Three families · 1,898 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL DENIS ASSOCIATES108/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHELL EXPEDITING203/21/2026
Building Lifecycle
All (62)Filed (1)Violation (44)Objection (13)Special Inspection (4)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
02/24/2025
Objection raised — Scope
11/22/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/15/2019
Objection raised — Other
08/15/2019
Objection resolved — Resolved
08/06/2019
Filed — Alteration
BASEMENT REPLACED ONE WEIL MCLAIN BOILER & ONE RHEEM HOT WATER HEATER, ALSO REPLACED PIPING TO EXISTING RANGES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00198061-I1
08/06/2019
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
08/06/2019
Special inspection requirement — Fire-Resistance Rated Construction
PAUL DENIS
07/23/2019
Special inspection requirement — HVAC and service water heating system controls
PAUL DENIS
07/23/2019
Special inspection requirement — HVAC and service water heating equipment
PAUL DENIS
10/10/2018
Violation issued (HPD, closed)
I
08/06/2018
Violation issued (ECB, open)
Boilers
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2017
Violation issued (HPD, closed)
I
10/27/2016
Violation issued (HPD, closed)
I
12/30/2015
Violation issued (HPD, open)
B
02/03/2015
Violation issued (HPD, closed)
I
05/08/2013
Violation issued (HPD, open)
B
05/26/2007
Violation issued (HPD, open)
B
04/13/2006
Violation issued (HPD, open)
B
05/02/2001
Violation issued (HPD, closed)
A
06/25/1998
Violation issued (ECB, closed)
Construction
02/07/1996
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/1995
Violation issued (ECB, open)
Construction
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/1994
Violation issued (ECB, open)
Construction
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
A
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
A
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
A
11/06/1987
Violation issued (HPD, open)
B
11/06/1987
Violation issued (HPD, open)
B
Latest 60 of 62 events.
Nothing on file for this building.
1 project · most recent 08/06/2019
Gas
FiledStatusContractorScope
08/06/2019——Gas
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/06/2019Energy Code Compliance InspectionsPAUL DENISprogress
08/06/2019Fire-Resistance Rated ConstructionPAUL DENISprogress
07/23/2019HVAC and service water heating system controls PAUL DENISenergy_progress
07/23/2019HVAC and service water heating equipment PAUL DENISenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00198061-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026M00198061-I1Open ↗
08/27/2026M00198061-I1Open ↗
08/27/2026M00198061-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00198061-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist1
08/13/2026M00198061-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00198061-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00198061-I1Open ↗