← Back
Elevator cooperative
5620 SYLVAN AVENUE
BRONX · BIN 2084079
💬 Discuss this project
1960Year Built
6Stories
D4Building Class
R5Zoning
80,120 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized17 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 3235 CAMBRIDGE OWNERS INC · 25,625 sf lot · 3.13 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES703/22/2026
VERITAS PROPERTY MANAGEMENT703/22/2026
3235 CAMBRIDGE OWNERS1003/22/2026
TUTURA BUILDERS GROUP INC103/22/2026
3225 CAMBRIDGE AVE C O HSC MGM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
FUTURA BUILDERS GROUP INC.General Contractor203/21/2026
AGEE HEATING SERVICE CORPPlumbing207/08/2026
OSSO PLUMBING & HEATINGPlumbing203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187202/15/2024
NEW YORK ENGINEERING ASSO851412/08/2023
Building Lifecycle
All (113)Filed (8)Permit Issued (4)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (3)Special Inspection (19)
06/03/2026
Cycle 10 facade report submitted
06/03/2026
Cycle 10 facade report signed — SAFE
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, open)
A
05/18/2026
Violation issued (HPD, open)
A
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, open)
B
04/14/2026
Cycle 10 facade inspection completed
12/25/2025
Violation issued (HPD, closed)
A
12/25/2025
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00895412-I1
02/22/2024
Signed off — Alteration
X08006204-I1
02/15/2024
Filed — Alteration
X08006204-P1
02/15/2024
Special inspection requirement — Masonry
Hamidreza Saghari
02/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
02/15/2024
Special inspection requirement — Final
Hamidreza Saghari
02/15/2024
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
01/05/2024
Signed off — Alteration
ON EXISTING GAS SERVICE, INSTALL NEW GAS METER AND PIPING. INSTALL DOMESTIC HOT WATER STORAGE TANKS.
X00830595-I1
12/27/2023
Signed off — Alteration
X00829343-I1
12/08/2023
Filed — Alteration
ON EXISTING GAS SERVICE, INSTALL NEW GAS METER AND PIPING. INSTALL DOMESTIC HOT WATER STORAGE TANKS.
X00830595-P1
12/08/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
12/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, closed)
C
08/28/2023
Violation issued (HPD, closed)
C
08/28/2023
Violation issued (HPD, closed)
B
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
C
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
C
08/28/2023
Violation issued (HPD, open)
B
08/28/2023
Violation issued (HPD, open)
C
08/28/2023
Violation issued (HPD, closed)
C
08/22/2023
Violation issued (ECB, closed)
Construction
08/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00895412-P1
07/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/29/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
06/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/29/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
06/28/2023
Filed — Alteration
X00829343-P1
06/28/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/28/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/28/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/26/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00895412-I1
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/26/2023
DOB NOWGeneral ConstructionSigned-offGYASI JACKSON03/30/2023
DOB NOWBoiler EquipmentSigned-offAGEE HEATING SERVICE CORP03/10/2023
DOB NOWPlumbingSigned-offAGEE HEATING SERVICE CORP03/10/2023
BISPLISSUEDPRECISION PLBG SVCS., INC09/19/2016
BISOTISSUEDCE & JE ENTERPRISES INC08/10/2016
BISOTISSUEDSKYLINE RESTORATION INC06/26/2014
BISOTISSUEDSKYLINE RESTORATION INC05/01/2014
BISEQISSUEDSPRING SCAFFOLDING LLC04/04/2014
BISOTISSUEDL & Z RESTORATION CORP07/17/2007
BISEQISSUEDNEW VISION ENTERPRISES INC.07/16/2007
BISPLISSUEDRIGID PLUMBING CONT INC02/20/2004
BISOTISSUEDS&J HOME IMP05/22/2003
BIS—ISSUEDVIP SEWER CLEANING SERVICES07/25/1997
BISPLISSUEDV.I.P. CONTRACTING /SEWER CLEAN07/25/1997
3 projects · most recent 08/24/2023
General Wiring
FiledStatusContractorScope
08/24/2023CompleteA+ ELECTRIC OF GREATER NYGeneral Wiring
06/26/2023Permit IssuedRICHARD NEU—
04/30/2019CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/15/2024MasonryHamidreza Sagharispecial
02/15/2024Energy Code Compliance InspectionsHamidreza Saghariprogress
02/15/2024FinalHamidreza Saghariprogress
02/15/2024Air barrier - visual inspectionHamidreza Sagharienergy_progress
12/08/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
12/08/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/08/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/29/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/29/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/29/2023Heating SystemsLOUIS ARENAspecial
06/29/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/29/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/29/2023Maintenance informationLOUIS ARENAenergy_progress
06/28/2023Heating SystemsLOUIS ARENAspecial
06/28/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/28/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/28/2023Maintenance informationLOUIS ARENAenergy_progress
06/28/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/28/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026X00830595-I1Request digital key ↗
08/23/2026X00830595-P1Request digital key ↗
08/23/2026X00829343-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
09/19/2016220545248Open ↗
08/10/2016220545248Open ↗
05/14/2014220359118Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/16/2016220545248Open ↗
08/10/2016220545248Open ↗
04/03/2014240053507Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/15/2015240053507Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026X00830595-I1Open ↗
08/23/2026X00830595-P1Open ↗
08/23/2026X00829343-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00829343-I1Open ↗
08/26/2026X00830595-I1Open ↗
08/24/2026X00829343-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/24/2016220545248Open ↗
08/10/2016220545248Open ↗
04/22/2015220359118Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00829343-I1Open ↗
08/26/2026X00830595-I1Open ↗
08/26/2026X00830595-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/10/2016220545248Open ↗
02/18/2014220359118Open ↗
07/13/2007210004742Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/10/2016220545248Open ↗
04/03/2014240053507Open ↗
02/18/2014220359118Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
07/13/2007210004742Open ↗
04/03/2014240053507Open ↗
▸BISPC FULL REPORT1
07/13/2007210004742Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/13/2007210004742Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/03/2014240053507Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/10/2016220545248Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/10/2016220545248Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026X00830595-P1Open ↗
08/23/2026X00830595-I1Open ↗
08/23/2026X00829343-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/13/2007210004742Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/10/2016220545248Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/24/2016220545248Open ↗
08/10/2016220545248Open ↗
04/22/2015220359118Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/24/2016220545248Open ↗
04/22/2015220359118Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/03/2014240053507Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/01/2016220545248Open ↗
10/24/2016220545248Open ↗
05/15/2015240053507Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/13/2007210004742Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/14/2014220359118Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
10/24/2016220545248Open ↗
08/10/2016220545248Open ↗
04/22/2015220359118Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/10/2016220545248Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
08/10/2016220545248Open ↗
02/18/2014220359118Open ↗
▸BISADDITIONAL INFORMATION1
02/18/2014220359118Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/03/2014240053507Open ↗