← Back
Walk-up apt, over six families with stores
5624 3 AVENUE
BROOKLYN · BIN 3015232
💬 Discuss this project
1931Year Built
4Stories
C7Building Class
R6BZoning
6,132 sfGross Floor Area
8Units
Rent Stabilized26 Open Violations 25 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: ZHENGZE PROPERTY MANAGEMENT CO LTD. · 1,613 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO LLC503/22/2026
STEEL CONSTRUCTION LLC503/22/2026
ZHENGZE PROPERTY MANAGEMENT CO LTD.603/22/2026
270 57TH STREET103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2014$900K—Private party → ZHENGZE PROPERTY MANAGEMENT CO LTD.$147/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES110/03/2025
CITY BUILDING NY ARCHITECT P.C.104/18/2025
JIAN ENGINEERING PLLC101/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor303/21/2026
STEEL CONSTRUCTION LLCGeneral Contractor303/21/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
Y & W NY CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJE CONSULTING ENGINEERIN8522110/03/2025
CITY BUILDING NY ARCHITEC1394104/18/2025
Building Lifecycle
All (79)Filed (3)Permit Issued (3)Signed Off (1)Violation (60)Inspection (6)Objection (4)Special Inspection (2)
08/24/2026
Signed off — Alteration
SUBMIT SIDEWALK SHED WORK AT OPEN SPACE PER DRAWING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01162185-I1
08/09/2026
Violation issued (HPD, open)
A
08/09/2026
Violation issued (HPD, open)
C
07/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2026
Violation issued (ECB, open)
Unknown
04/30/2026
Violation issued (HPD, closed)
A
12/23/2025
Permit issued — Supported Scaffold
B01294390-I1-SF
12/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Evodia Ibrahim
11/14/2025
Special inspection requirement — Post-installed Anchors
Evodia Ibrahim
11/01/2025
Objection raised — Inspections
11/01/2025
Objection raised — Scope
10/03/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01294390-I1
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
C
09/03/2025
Violation issued (HPD, closed)
A
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
A
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
A
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
C
08/28/2025
Violation issued (HPD, open)
C
08/28/2025
Violation issued (HPD, open)
A
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, closed)
A
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
A
08/28/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
A
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
B
08/28/2025
Violation issued (HPD, open)
A
08/28/2025
Violation issued (HPD, open)
B
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2025
Permit issued — General Construction
B01203876-I1-GC
06/05/2025
Violation issued (HPD, closed)
A
04/18/2025
Filed — Alteration
B01203876-I1
03/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/06/2025
Violation issued (ECB, closed)
Construction
02/20/2025
Violation issued (ECB, closed)
Construction
02/20/2025
Violation issued (ECB, closed)
Construction
01/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/07/2025
Violation issued (ECB, closed)
Construction
01/03/2025
Filed — Alteration
SUBMIT SIDEWALK SHED WORK AT OPEN SPACE PER DRAWING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01162185-I1
01/03/2025
Permit issued — Sidewalk Shed
B01162185-I1-SH
12/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSTEEL CONSTRUCTION LLC12/23/2025
DOB NOWGeneral ConstructionPermit IssuedY & W NY CONSTRUCTION INC07/29/2025
DOB NOWSidewalk ShedSigned-offACER CONSTRUCTION INC01/03/2025
BISBLISSUEDDYCKMAN PLBG AND HTG INC07/28/2015
BISMHISSUEDYUNG WAY CONSTRUCTION INC.11/19/2014
BISPLISSUEDDYCKMAN PLBG AND HTG INC05/16/2014
BISMHISSUEDYUNG WAY CONSTRUCTION INC.05/01/2014
BISEQISSUEDYUNG WAY CONSTRUCTION INC.05/01/2014
BISFBISSUEDBLUE DIAMOND FUEL OIL CORP05/26/2004
2 projects · most recent 09/15/2025
General Wiring
FiledStatusContractorScope
09/15/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
12/30/2024Permit IssuedKWONG MING ELECTRIC INC—
2 projects · most recent 10/03/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/03/2025Permit IssuedSTEEL CONSTRUCTION LLCScaffold
01/03/2025Signed-offACER CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/14/2025Alternative Materials - OTCR Buildings Bulletin NumberEvodia Ibrahimspecial
11/14/2025Post-installed AnchorsEvodia Ibrahimspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B01162185-I1Request digital key ↗
08/21/2026B01203876-I1Request digital key ↗
08/20/2026B01294390-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
07/30/2015320941344Open ↗
11/20/2014320941344Open ↗
11/20/2014320941344Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/04/2016301749400Open ↗
02/02/2015320941344Open ↗
11/28/2014320941344Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01162185-I1Open ↗
08/21/2026B01203876-I1Open ↗
08/20/2026B01294390-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/22/2015320941344Open ↗
04/22/2014320941344Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01294390-I1Open ↗
08/25/2026B01294390-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/02/2015320941344Open ↗
11/28/2014320941344Open ↗
04/22/2014320941344Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
08/13/2015320941344Open ↗
08/04/2015320941344Open ↗
05/11/2015320941344Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/22/2014320941344Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01203876-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/22/2015320941344Open ↗
04/22/2014320941344Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/22/2015320941344Open ↗
▸Inspections & Test Reports2
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION2
08/19/2015320941344Open ↗
05/11/2015320941344Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/22/2015320941344Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/22/2014320941344Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/22/2015320941344Open ↗
04/22/2014320941344Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
06/30/2015320941344Open ↗
03/31/2015320941344Open ↗
02/02/2015320941344Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
04/22/2014320941344Open ↗
▸Other Documents1
▸BISOP-4 - Special Report1
09/22/2015320941344Open ↗