← Back
Walk-up apt, over six families with stores
5624 6 AVENUE
BROOKLYN · BIN 3015405
💬 Discuss this project
1906Year Built
4Stories
C7Building Class
R6AZoning
7,760 sfGross Floor Area
12Units
Rent Stabilized30 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · 2,517 sf lot · 3.08 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 41p · 1 filing · 3 docs
Floor 3
Floor 2
Floor 1
Cellar2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PONDOSA DESIGN INC208/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLBG AND HTG INCPlumbing407/08/2026
GEORGE WONGElectrical203/21/2026
ALLAN TANGElectrical103/21/2026
COMBINED ELECL CONTNG INCElectrical103/22/2026
DHC CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PONDOSA DESIGN INC.5126208/20/2021
Building Lifecycle
All (64)Filed (2)Permit Issued (2)Signed Off (1)Violation (53)Inspection (2)Objection (4)
04/30/2026
Violation issued (HPD, closed)
A
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
C
10/14/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, open)
B
08/30/2024
Violation issued (HPD, closed)
C
04/03/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
04/11/2022
Signed off — Alteration
INTERIOR RENOVATION AT APT 2B, 3B AND 4A: REPLACE KITCHEN CABINETS AND COUNTER TOP; ERECT NEW SHEETROCK WALL; NEW FLOORING AND CEILING ENTIRE; NO CHANGE IN BULK; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
B00551845-I1
03/04/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2022
Violation issued (HPD, closed)
A
11/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2021
Permit issued — Plumbing
B00563703-I1-PL
10/14/2021
Violation issued (HPD, open)
C
10/14/2021
Violation issued (HPD, open)
A
10/14/2021
Violation issued (HPD, open)
B
10/14/2021
Violation issued (HPD, open)
A
10/14/2021
Violation issued (HPD, open)
B
10/14/2021
Violation issued (HPD, open)
C
10/04/2021
Permit issued — General Construction
B00551845-I1-GC
08/27/2021
Objection resolved — Addressed
08/20/2021
Filed — Alteration
B00563703-I1
08/12/2021
Objection resolved — Addressed
08/05/2021
Objection raised — Fire_Protection
08/05/2021
Objection raised — Estimated Cost
07/30/2021
Filed — Alteration
INTERIOR RENOVATION AT APT 2B, 3B AND 4A: REPLACE KITCHEN CABINETS AND COUNTER TOP; ERECT NEW SHEETROCK WALL; NEW FLOORING AND CEILING ENTIRE; NO CHANGE IN BULK; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
B00551845-I1
05/07/2021
Violation issued (HPD, open)
A
05/07/2021
Violation issued (HPD, closed)
C
05/07/2021
Violation issued (HPD, closed)
C
05/07/2021
Violation issued (HPD, closed)
C
05/07/2021
Violation issued (HPD, open)
A
05/07/2021
Violation issued (HPD, open)
A
05/07/2021
Violation issued (HPD, open)
B
05/07/2021
Violation issued (HPD, open)
A
05/07/2021
Violation issued (HPD, open)
A
05/07/2021
Violation issued (HPD, open)
B
05/07/2021
Violation issued (HPD, open)
B
05/07/2021
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
09/26/2019
Violation issued (HPD, closed)
A
09/26/2019
Violation issued (HPD, closed)
B
09/26/2019
Violation issued (HPD, closed)
B
09/26/2019
Violation issued (HPD, closed)
C
09/26/2019
Violation issued (HPD, closed)
A
10/12/2018
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/25/2021
DOB NOWGeneral ConstructionSigned-offALEXANDER CHAN10/04/2021
BISPLISSUEDEBM PLUMBING CORP06/07/1996
BISBLISSUEDEBM PLUMBING CORP06/07/1996
2 jobs · most recent 10/07/2021
General Wiring
FiledStatusContractorScope
10/07/2021CompleteCOMBINED ELECL CONTNG INCGeneral Wiring
10/09/2019CompleteCOMBINED ELECL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00563703-I1Request digital key ↗
08/14/2026B00551845-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00551845-I1Open ↗
09/01/2026B00563703-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00563703-I1Open ↗
08/14/2026B00551845-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026B00551845-I1Open ↗