← Back
Elevator apt, fireproof without stores
Williams & Georgia Towers
563 DUMONT AVENUE · BIN 3084438
💬 Discuss this project
1971Year Built
6Stories
D3Building Class
R6Zoning
50,640 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized44 Open Violations 43 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: WILLIAMS AND GEORGIA TOWERS HOUSING DEVE LOPMENT FU · 30,000 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof3p · 2 filings · 19 docs
Floor 61p · 1 filing · 12 docs
Floor 51p · 1 filing · 12 docs
Floor 41p · 1 filing · 12 docs
Floor 31p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 13p · 2 filings · 19 docs
Cellar5p · 2 filings · 20 docs
1 job · most recent 03/18/2025
FiledStatusContractorScope
03/18/2025———
1 job · most recent 03/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/18/2025Signed-offTHE METRO GROUP PLBG LLCGas, Water/Sanitary
7 jobs · most recent 11/28/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/28/2025CompleteTUXEDO ELEC'L CONTR'G INC—
02/18/2025CompleteTHE METRO GROUP ELECTRICBoiler Controls
04/16/2024CompleteTHE METRO GROUP ELECTRICGeneral Wiring
10/18/2023CompleteTHE METRO GROUP ELECTRICGeneral Wiring
08/09/2023CompleteHIGH QUALITY ELECTRIC OF—
08/27/2020CompleteHOME RUN ELECTRICGeneral Wiring
12/10/2019Permit IssuedALL WAYS ELECTRIC CORP.W—
Building Lifecycle
All (180)Filed (10)Permit Issued (14)Signed Off (3)Violation (60)Inspection (1)Objection (62)Special Inspection (30)
08/13/2026
Signed off — Alteration
FILING FOR MECHANICAL WORK IN CONJUNCTION WITJ APPL # B00693358. NO CHANGE IN USE, EGRESS OR OCUPANCY
B00698269-I1
07/16/2026
Objection resolved — Open
07/14/2026
Objection raised — Cost
07/06/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Other
06/18/2026
Filed — Alteration
B00693358-P1
06/18/2026
Special inspection requirement — Masonry
Hamidreza Saghari
06/18/2026
Special inspection requirement — Final
ANTHONY ORLANDO
06/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
06/03/2026
Permit issued — Sprinklers
B00698271-I1-PL
06/02/2026
Violation issued (HPD, open)
A
06/02/2026
Violation issued (HPD, closed)
C
06/02/2026
Violation issued (HPD, open)
B
06/02/2026
Violation issued (HPD, open)
B
06/02/2026
Violation issued (HPD, open)
B
06/02/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (ECB, open)
Elevators
02/14/2026
Violation issued (HPD, closed)
C
02/14/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
01/27/2026
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2025
Signed off — Alteration
B01020366-I1
08/25/2025
Violation issued (HPD, closed)
C
07/14/2025
Permit issued — General Construction
B00693358-I1-GC
05/27/2025
Violation issued (HPD, closed)
B
05/27/2025
Violation issued (HPD, closed)
B
05/27/2025
Violation issued (HPD, closed)
B
05/27/2025
Violation issued (HPD, closed)
B
05/27/2025
Violation issued (HPD, open)
C
05/27/2025
Violation issued (HPD, closed)
B
04/15/2025
Permit issued — Sprinklers
B00698271-I1-PL
03/25/2025
Special inspection requirement — Maintenance information
jamal taha
03/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Hamidreza Saghari
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hamidreza Saghari
03/25/2025
Special inspection requirement — Sprinkler Systems
Hamidreza Saghari
03/25/2025
Special inspection requirement — Energy Code Compliance Inspections
jamal taha
03/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
jamal taha
03/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
jamal taha
03/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
jamal taha
03/18/2025
Filed — Alteration
FILING FOR PLUMBING AND SPRINKLER WORK AS PER PANS. NO CHANGE IN USE, EGRES OR OCUPANCY.
B00698271-P1
03/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hamidreza Saghari
03/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
jamal taha
03/10/2025
Special inspection requirement — Maintenance information
jamal taha
03/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
jamal taha
03/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
jamal taha
03/10/2025
Special inspection requirement — Energy Code Compliance Inspections
jamal taha
03/10/2025
Special inspection requirement — Sprinkler Systems
Hamidreza Saghari
02/23/2025
Violation issued (HPD, closed)
B
02/23/2025
Violation issued (HPD, closed)
C
02/18/2025
Signed off — Alteration
Insulation of heavy duty sidewalk shed as per chapter 33 of New York City building code. No change in use, egress or occupancy under this application
B00911349-I1
01/28/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
Latest 60 of 180 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRESTIGE MANAGEMENT3207/08/2026
WILLIAMS GEORGIA TOWERS HDFC2503/22/2026
ELVA MCZEAL HOUSING DEVEL103/22/2026
ARCO MANAGEMENT ELVA MCZE103/22/2026
ELVA MCZEAL TENANT ASSOC.203/22/2026
ELVA-UHAB HOUSING DEV FUND403/21/2026
NEIGHBORHOOD RESTORE103/21/2026
ELVA-UHAB HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWLESS & MANGIONE606/18/2026
MOHAMMAD AHEAD, PE311/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & ASSOCIATES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AM&G WATERPROOFING LLCGeneral Contractor507/08/2026
THE METRO GROUP, INCGeneral Contractor407/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor307/08/2026
NAT'L MECH. SVCS PLBG LLCPlumbing207/08/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187606/18/2026
KZ ENGINEERING, P.C.4665103/19/2024
AMKA & ASSOCIATES LLC8239209/13/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offTHE METRO GROUP PLBG LLC06/03/2026
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC07/14/2025
DOB NOWSprinklersSigned-offTHE METRO GROUP PLBG LLC04/15/2025
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC10/18/2024
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC10/16/2024
DOB NOWBoiler EquipmentSigned-offRICHARD MORTMAN09/05/2024
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC07/25/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL07/25/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC04/23/2024
DOB NOWBoiler EquipmentSigned-offRICHARD MORTMAN03/06/2024
DOB NOWSprinklersSigned-offNAT'L MECH. SVCS PLBG LLC11/06/2023
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC10/20/2023
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC09/14/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL08/04/2023
BISOTISSUEDTOTAL RESTORATION INC08/04/2020
BISOTISSUEDTOTAL RESTORATION INC07/20/2020
BISPLISSUEDCC CONTROLLED PLBG CO INC03/09/2011
BISOTISSUEDELVA-UHAB HDFC09/25/2009
BISPLISSUEDN KOFSKY & SON INC08/04/2009
BISFBISSUEDC C CONTROLLED COMBUSTION08/04/2009
BISPLISSUEDAMOK INC03/27/2008
BISOTISSUEDMDG DESIGN & CONSTR LLC03/20/2008
BISOTISSUEDMDG DESIGN & CONSTR LLC12/28/2007
BISPLISSUEDAMOK INC07/03/2007
BISOTISSUEDMDG DESIGN & CONSTR LLC06/26/2007
BISEQISSUEDYORK SCAFFOLDING EQUIPMENT CORP02/03/1997
BISOTISSUEDMOSTAFA CONTRACTING CO.03/22/1995
BISEQISSUEDMOSTAFA CONTRACTING CO.03/22/1995
BISBLISSUEDC C CONTROLLED COMBUSTION01/27/1995
BISFBISSUEDC C CONTROLLED COMBUSTION01/13/1995
BISPLISSUEDN.KOFSKY01/13/1995
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/28/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/18/2026MasonryHamidreza Sagharispecial
06/18/2026FinalANTHONY ORLANDOprogress
06/18/2026Tenant Protection Plan Compliance—special
06/18/2026Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
03/25/2025Maintenance informationjamal tahaenergy_progress
03/25/2025Tenant Protection Plan ComplianceHamidreza Sagharispecial
03/25/2025Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
03/25/2025Sprinkler SystemsHamidreza Sagharispecial
03/25/2025Energy Code Compliance Inspectionsjamal tahaprogress
03/25/2025HVAC-R and service water heating equipmentjamal tahaenergy_progress
03/25/2025HVAC-R and service water piping design and insulationjamal tahaenergy_progress
03/25/2025HVAC-R and service water heating system controlsjamal tahaenergy_progress
03/10/2025Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
03/10/2025HVAC-R and service water heating system controlsjamal tahaenergy_progress
03/10/2025Maintenance informationjamal tahaenergy_progress
03/10/2025Tenant Protection Plan Compliance—special
03/10/2025HVAC-R and service water heating equipmentjamal tahaenergy_progress
03/10/2025HVAC-R and service water piping design and insulationjamal tahaenergy_progress
03/10/2025Energy Code Compliance Inspectionsjamal tahaprogress
03/10/2025Sprinkler SystemsHamidreza Sagharispecial
03/19/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/19/2024Post-installed AnchorsKarol Zdancewiczspecial
09/13/2023Fire-Resistant Penetrations and JointsHamidreza Sagharispecial
08/30/2023Energy Code Compliance Inspectionsjamal tahaprogress
08/30/2023HVAC-R and service water piping design and insulationjamal tahaenergy_progress
Latest 25 of 38.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00693358-I1Request digital key ↗
08/27/2026B00911349-P2Request digital key ↗
08/27/2026B00911349-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
08/04/2020340724229Open ↗
07/24/2020322087460Open ↗
09/25/2009320068788Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
07/24/2020322087460Open ↗
04/23/2020340724229Open ↗
09/15/2009320068788Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWSpecial Inspector Seal & Signature12
09/25/2026B00693358-I1Open ↗
09/23/2026B08034894-I1Open ↗
09/23/2026B08034894-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00693358-I1Open ↗
08/27/2026B00693358-P1Open ↗
08/27/2026B00911349-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/25/2026B00693358-I1Open ↗
09/23/2026B08034894-I1Open ↗
09/02/2026B00693358-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/24/2020322087460Open ↗
09/15/2009320068788Open ↗
09/15/2009320068788Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2020322087460Open ↗
03/19/2008310106505Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/19/2008310106505Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2020322087460Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/23/2020340724229Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
04/08/2008310106505Open ↗
03/19/2008310106505Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/29/2008310106505Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
04/23/2020340724229Open ↗
07/24/2020322087460Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00693358-I1Open ↗
08/15/2026B00693358-P1Open ↗
08/13/2026B00698269-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/15/2009320068788Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/23/2020340724229Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/19/2020340724229Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/19/2008310106505Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/19/2020340724229Open ↗
04/23/2020340724229Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/19/2020340724229Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/24/2020322087460Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/07/2020322087460Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/10/2026B08034894-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/19/2020340724229Open ↗
10/07/2020322087460Open ↗
04/23/2020340724229Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/15/2026B00693358-P1Open ↗
08/13/2026B00693358-I1Open ↗
08/13/2026B00698271-P1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/19/2020340724229Open ↗
10/07/2020322087460Open ↗
05/22/2008310106505Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/15/2009320068788Open ↗
03/19/2008310106505Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/19/2020340724229Open ↗
10/07/2020322087460Open ↗
07/24/2020322087460Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
07/24/2020322087460Open ↗
09/15/2009320068788Open ↗
03/19/2008310106505Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/23/2020340724229Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01020366-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01020366-I1Open ↗