← Back
STATEN ISLAND
5639 AMBOY ROAD
STATEN ISLAND · BIN 5176683
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureCivil
Floor 36p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUPERSONIC GROUP INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, PC405/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OWR DEVELOPERS LLCGeneral Contractor603/21/2026
SKYRISE GENERAL CONSTRUCTGeneral Contractor206/28/2026
ANI ELECTRIC CORPElectrical103/22/2026
CROWN PLUMBING INCPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738205/22/2026
Building Lifecycle
All (53)Filed (4)Permit Issued (6)Signed Off (2)Inspection (9)Objection (2)Special Inspection (30)
06/02/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
06/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/02/2026
Special inspection requirement — Mechanical Systems
anthony santoro
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
06/02/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
06/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
06/02/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/02/2026
Special inspection requirement — Footing and Foundation
anthony santoro
06/02/2026
Special inspection requirement — Final
anthony santoro
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/02/2026
Special inspection requirement — Maintenance information
anthony santoro
06/02/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
06/02/2026
Special inspection requirement — Fenestration areas
anthony santoro
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
06/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
06/02/2026
Special inspection requirement — Permanent certificate
anthony santoro
06/02/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
06/02/2026
Special inspection requirement — Air barrier — testing
anthony santoro
06/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
06/02/2026
Special inspection requirement — Metering
anthony santoro
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
06/02/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
06/02/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
06/02/2026
Special inspection requirement — Interior lighting power
anthony santoro
06/02/2026
Special inspection requirement — Structural Steel - Details
anthony santoro
05/22/2026
Filed — New Building
FILED IN CONJUNCTION WITH S01034868
S01034868-P1
01/27/2026
Signed off — Alteration
S01015849-I1
01/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/06/2025
Signed off — New Building
FILED IN CONJUNCTION WITH S01034868
S01034868-S1
08/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2025
Permit issued — General Construction
S01034868-I1-GC-CX
05/07/2025
Permit issued — Curb Cut
S01015849-I1-CC
03/03/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/12/2024
Permit issued — Plumbing
S39574865-S1-PL
09/25/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/28/2024
Permit issued — Plumbing
S01034868-S1-PL
05/23/2024
Permit issued — Earth Work
S01034868-I1-GC-CX
05/23/2024
Permit issued — General Construction
S01034868-I1-FO-EA
05/15/2024
Objection resolved — Addressed
05/14/2024
Objection raised — Scope
04/18/2024
Filed — New Building
FILED IN CONJUNCTION WITH S01034868
S01034868-S1
04/16/2024
Filed — New Building
FILED IN CONJUNCTION WITH S01034868
S01034868-I1
03/08/2024
Filed — Alteration
S01015849-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOWR DEVELOPERS LLC06/30/2025
DOB NOWCurb CutSigned-offOWR DEVELOPERS LLC05/07/2025
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC12/12/2024
DOB NOWPlumbingSigned-offCROWN PLUMBING INC08/28/2024
DOB NOWEarth WorkPermit IssuedSKYRISE GENERAL CONSTRUCT05/23/2024
DOB NOWGeneral ConstructionPermit IssuedSKYRISE GENERAL CONSTRUCT05/23/2024
1 project · most recent 05/22/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2026Permit IssuedOWR DEVELOPERS LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg LUU240HV 9,600 BTU · Split System ×1
LUU360HHV 14,400 BTU · Split System ×1
LUU480HV 18,000 BTU · Vrf Outdoor ×1
Heating
Lg LVN241HV4 10,800 BTU · Vrf Indoor ×1
LVN361HV4 16,000 BTU · Vrf Indoor ×1
LVN480HV 19,000 BTU · Vrf Indoor ×1
Ventilation
Broan B130E65RT 130 CFM · Erv ×1
ERVH100 100 CFM · Erv ×1
1 project · most recent 05/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/22/2026Signed-offCROWN PLUMBING INCStorm, Water/Sanitary
2 projects · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025CancelledANI ELECTRIC CORPGeneral Wiring
12/20/2024CompleteANI ELECTRIC CORPGeneral Wiring
1 project · most recent 05/22/2026
Steel Wood
FiledStatusContractorScope
05/22/2026Permit IssuedOWR DEVELOPERS LLCSteel, Wood
1 project · most recent 05/22/2026
Earthwork
FiledStatusContractorScope
05/22/2026Permit IssuedOWR DEVELOPERS LLCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
08/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/02/2026Structural Steel - Detailsanthony santorospecial
06/02/2026Subgrade Inspectionsanthony santorospecial
06/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
06/02/2026Mechanical Systemsanthony santorospecial
06/02/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
06/02/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/02/2026Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
06/02/2026Concrete - Cast-In-Placeanthony santorospecial
06/02/2026Structural Steel - High Strength Boltinganthony santorospecial
06/02/2026Fire-Resistance Rated Constructionanthony santoroprogress
06/02/2026Structural Wood Frameanthony santoroprogress
06/02/2026Energy Code Compliance Inspectionsanthony santoroprogress
06/02/2026Footing and Foundationanthony santoroprogress
06/02/2026Finalanthony santoroprogress
06/02/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
06/02/2026Maintenance informationanthony santoroenergy_progress
06/02/2026Air barrier - visual inspectionanthony santoroenergy_progress
06/02/2026Fenestration areasanthony santoroenergy_progress
06/02/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
06/02/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
06/02/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
06/02/2026Permanent certificateanthony santoroenergy_progress
06/02/2026Fenestration air leakageanthony santoroenergy_progress
06/02/2026Air barrier — testing anthony santoroenergy_progress
06/02/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
Latest 25 of 65.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026S01015849-I1Request digital key ↗
08/16/2026S01034868-P1Request digital key ↗
08/16/2026S01034868-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01034868-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01034868-S1Open ↗
09/01/2026S01034868-S1Open ↗
08/29/2026S01034868-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026S01034868-S1Open ↗
08/16/2026S01034868-I1Open ↗
08/16/2026S01034868-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S01034868-I1Open ↗
08/29/2026S01034868-I1Open ↗
08/25/2026S01034868-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01034868-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01034868-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01034868-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01034868-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026S01034868-P1Open ↗
08/13/2026S01034868-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026S01034868-I1Open ↗
08/16/2026S01034868-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01034868-I1Open ↗