← Back
Multi-story retail building (2+)
564 WEST 181 STREET
MANHATTAN · Washington Heights (North) · BIN 1063636
💬 Discuss this project
1914Year Built
2Stories
K2Building Class
C4-4Zoning
17,200 sfGross Floor Area
5Units
5 Open Violations ▸
Multi-story retail building (2+) · Owner of record: SUL 620/564 LLC · 9,450 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof15p · 3 filings · 20 docs
Floor 31p · 1 filing · 4 docs
Floor 216p · 2 filings · 20 docs
Floor 149p · 6 filings · 20 docs
Cellar16p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 5 docs
Filed — no permit issued6p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUL 620 5645707/30/2026
NEWMARK KNIGHT FRANK503/22/2026
INTERSYSTEMS303/21/2026
SAME103/21/2026
SUL 620 564 LLC C O COLLIERS INT703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MESZAROS ENGINEERING PLLC403/21/2026
M-DIS DESIGN GROUP303/21/2026
EA DESIGN GROUP803/21/2026
KENNY LEE ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LINKED MECHANICAL LLCGeneral Contractor603/21/2026
OPTIMUS CONSTRUCTION&DEV*General Contractor407/08/2026
SITE ENTER INCGeneral Contractor407/08/2026
TMS PLUMBING & HTG CORPFire Protection307/08/2026
KORMAN DESIGN & BUILDGeneral Contractor203/21/2026
DDS MECHANICAL FPS CORPFire Protection207/30/2026
D.D.S. MECH PBG&HTG CORPPlumbing207/08/2026
FLUSHING PLUMBING CORPPlumbing107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIG SPECIAL INSPECTIONS885310/28/2024
MESZAROS ENGINEERING PLLC963210/18/2022
SEAD ENGINEERING PC2665206/28/2022
PAKNIA ENGINEERING, PC1462306/23/2021
Building Lifecycle
All (143)Filed (13)Permit Issued (15)Signed Off (8)Violation (26)Inspection (10)Objection (41)Special Inspection (30)
08/04/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2026
Permit issued — Plumbing
M01110201-S2-EW-SP
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/08/2026
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & ROOF AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
M01110201-S1
11/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2024
Permit issued — Sprinklers
M01110201-S2-EW-SP
11/14/2024
Permit issued — Mechanical Systems
M01110201-S1-MS
11/14/2024
Permit issued — Plumbing
M01110201-S2-PL
10/28/2024
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & ROOF AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
M01110201-S1
10/28/2024
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & ROOF AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
M01110201-S2
10/17/2024
Permit issued — General Construction
M01110201-I1-GC
10/07/2024
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR & ROOF AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
M01110201-I1
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
10/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Dave Wall
10/02/2024
Special inspection requirement — Shutoff dampers
Dave Wall
10/02/2024
Special inspection requirement — Fenestration areas
Dave Wall
10/02/2024
Special inspection requirement — Interior lighting power
Dave Wall
10/02/2024
Special inspection requirement — Maintenance information
Dave Wall
10/02/2024
Special inspection requirement — Air barrier - visual inspection
Dave Wall
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
10/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
Dave Wall
10/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Dave Wall
10/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
Dave Wall
10/02/2024
Special inspection requirement — Lighting controls
Dave Wall
09/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Dave Wall
09/17/2024
Special inspection requirement — Final
Dave Wall
09/17/2024
Special inspection requirement — Sprinkler Systems
Dave Wall
09/17/2024
Special inspection requirement — Mechanical Systems
Dave Wall
09/17/2024
Special inspection requirement — Final
Dave Wall
09/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
05/29/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2024
Signed off — Alteration
Installation of new sprinkler heads on cellar and 1st floor and addition/modification of sprinkler heads on the 2nd floor in conjunction with ALT. 2 job #: 123750618. No change to use, means or egress.
M00377650-I1
02/12/2024
Permit issued — Sprinklers
M00377650-I1-EW-SP
03/28/2023
Signed off — Alteration
M00766180-I1
11/04/2022
Signed off — Alteration
REPLACEMENT OF AWNING WITH BUSINESS INFORMATION ON FRONT FACADE AT 1ST FLOOR LEVEL. NO DISTURBING EXTERIOR WALL & NO EXTERIOR LIGHTING WORK.
M00770101-I1
10/28/2022
Signed off — Alteration
HEREWITH FILE TO INSTALL TEMPORARY CONSTRUCTION FENCE FOR RETAIL STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00765345-I1
10/21/2022
Signed off — Alteration
INSTALLATION OF NEW 5-TON AND 7.5-TON SPLIT SYSTEM FOR COMMERCIAL SPACE.
M00772477-I1
10/20/2022
Permit issued — General Construction
M00770101-I1-GC
10/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
10/20/2022
Special inspection requirement — Maintenance information
Christian Meszaros
10/20/2022
Special inspection requirement — Permanent certificate
Christian Meszaros
10/20/2022
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
10/20/2022
Special inspection requirement — Final
Christian Meszaros
10/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
10/20/2022
Special inspection requirement — Preliminary
Christian Meszaros
10/20/2022
Special inspection requirement — Post-installed Anchors
Christian Meszaros
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
10/20/2022
Special inspection requirement — Mechanical Systems
Christian Meszaros
10/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
10/18/2022
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXISTING RETAIL SPACE WITH NEW HANDICAPPED TOILET W/ASSOCIATED PIPING WORK (GEN. CONST. FILED UNDER SEPARATE APPLICATION). NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00765352-I1
10/18/2022
Filed — Alteration
INSTALLATION OF NEW 5-TON AND 7.5-TON SPLIT SYSTEM FOR COMMERCIAL SPACE.
M00772477-P1
10/17/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
10/17/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2022
Permit issued — General Construction
M00772477-I1-GC
09/21/2022
Permit issued — General Construction
M00772477-I1-MS
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDDS MECHANICAL FPS CORP07/29/2026
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP11/15/2024
DOB NOWMechanical SystemsSigned-offOPTIMUS CONSTRUCTION&DEV*11/14/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP11/14/2024
DOB NOWGeneral ConstructionSigned-offOPTIMUS CONSTRUCTION&DEV*10/17/2024
DOB NOWSprinklersSigned-offTMS PLUMBING & HTG CORP02/12/2024
DOB NOWGeneral ConstructionSigned-offKORMAN DESIGN & BUILD10/20/2022
DOB NOWGeneral ConstructionSigned-offLINKED MECHANICAL09/29/2022
DOB NOWGeneral ConstructionSigned-offLINKED MECHANICAL09/21/2022
DOB NOWPlumbingSigned-offFLUSHING PLUMBING CORP09/08/2022
DOB NOWGeneral ConstructionSigned-offSITE ENTER INC07/25/2022
DOB NOWConstruction FenceSigned-offSITE ENTER INC07/25/2022
DOB NOWSprinklersSigned-offTMS PLUMBING & HTG CORP02/15/2022
DOB NOWSprinklersSigned-offTMS PLUMBING & HTG CORP09/17/2020
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL09/16/2020
BISPLISSUEDARCH PLUMBING & HTNG CORP07/21/2020
BISOTISSUEDJC CONTRACTING.MGMT LLC08/30/2019
BISMHISSUEDLJPY CORP11/01/2017
BISFPISSUEDCITYWIDE FIRE SYS PLBG EN08/20/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC08/18/2014
BISPLISSUEDORION PLUMBING & HTG CORP07/15/2014
BISOTISSUEDSTRUCTURETECH ENGINEERING05/22/2014
BISEQISSUEDRELIABLE H.I. INC04/14/2011
BISOTISSUEDRELIABLE H.I. INC04/14/2011
BISOTISSUEDGBI INDUSTRY CORP03/08/2011
BISEQISSUEDJ&C RESTORATION CORP10/25/2010
BISOTISSUEDJ&C RESTORATION CORP10/06/2010
BISEQISSUEDINTERSYSTEMS CORPORATION04/06/2010
BISOTISSUEDPRO TECH WATERPROOF. CORP05/19/2005
BISEQISSUEDPERIMETER BRIDGE SCAFF.05/18/2005
BISOTISSUEDMC GOWAN BUILDERS INC10/29/2004
BISMHISSUEDMC GOWAN BUILDERS INC10/29/2004
BISOTISSUEDBERGER SIGN FABRICATION INC.07/01/2002
BISOTISSUEDSOMERSET CONSTRUCTION CORP06/04/2001
BISEQISSUEDATY CONTR03/07/2001
BISOTISSUEDATY CONTR03/07/2001
BIS—ISSUEDNOVA PLUMBING , HEATINGS INC.12/06/2000
BIS—ISSUEDSVC SIGN & ERECTORS06/01/2000
BISSPISSUEDAVON PLBG & HTG INC02/24/2000
BISPLISSUEDAVON PLBG & HTG INC02/24/2000
+ 12 more permits on file
1 project · most recent 10/28/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/28/2024Signed-offOPTIMUS CONSTRUCTION&DEV*Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×1
PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck CSP-B1050 800 CFM · Exhaust Fan ×1
SP-B150 100 CFM · Exhaust Fan ×1
1 project · most recent 10/28/2024
FiledStatusContractorScope
10/28/2024Signed-offDDS MECHANICAL FPS CORP—
1 project · most recent 10/28/2024
Water/Sanitary
FiledStatusContractorScope
10/28/2024Signed-offD.D.S. MECH PBG&HTG CORPWater/Sanitary
5 projects · most recent 10/26/2024
General Wiring
FiledStatusContractorScope
10/26/2024CompleteETRICITY ELECTRICAL CO INGeneral Wiring
10/25/2022CompleteASKO ELEC CONST & MAIN INGeneral Wiring
06/12/2020Permit IssuedMLS ELECTRIC LLCGeneral Wiring
03/06/2020CompleteJAM ELECTRICAL CORP—
10/03/2019Permit IssuedF & F ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/04/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2022Pass-Final Fence Non-Directive 14PassView ↗
10/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
10/07/2024Energy Code Compliance InspectionsDave Wallprogress
10/02/2024HVAC-R and service water heating system controlsDave Wallenergy_progress
10/02/2024HVAC-R and service water piping design and insulationDave Wallenergy_progress
10/02/2024Shutoff dampersDave Wallenergy_progress
10/02/2024Fenestration and door U-factor and product ratingsDave Wallenergy_progress
10/02/2024Fire-Resistant Penetrations and JointsDave Wallspecial
10/02/2024Fenestration areasDave Wallenergy_progress
10/02/2024Energy Code Compliance InspectionsDave Wallprogress
10/02/2024Air barrier - visual inspectionDave Wallenergy_progress
10/02/2024Interior lighting powerDave Wallenergy_progress
10/02/2024Lighting controlsDave Wallenergy_progress
10/02/2024Maintenance informationDave Wallenergy_progress
10/02/2024HVAC-R and service water heating equipmentDave Wallenergy_progress
09/17/2024FinalDave Wallprogress
09/17/2024Fire-Resistance Rated ConstructionDave Wallprogress
09/17/2024FinalDave Wallprogress
09/17/2024Mechanical SystemsDave Wallspecial
09/17/2024Sprinkler SystemsDave Wallspecial
09/17/2024Fire-Resistant Penetrations and JointsDave Wallspecial
10/20/2022HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
10/20/2022Post-installed AnchorsChristian Meszarosspecial
10/20/2022Fire-Resistant Penetrations and JointsChristian Meszarosspecial
10/20/2022Mechanical SystemsChristian Meszarosspecial
10/20/2022PreliminaryChristian Meszarosprogress
10/20/2022Energy Code Compliance InspectionsChristian Meszarosprogress
Latest 25 of 67.
▾Documents — 237 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
09/02/2026M00765352-I1Request digital key ↗
09/02/2026M00766180-I1Request digital key ↗
09/02/2026M00765345-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00377693-I1Request digital key ↗
08/15/2026M00377693-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00377650-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION17
08/30/2019123750618Open ↗
06/14/2019123750618Open ↗
11/01/2017123148343Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION13
07/21/2020123750618Open ↗
08/30/2019123750618Open ↗
11/02/2017123148343Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications105
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M00770101-I1Open ↗
09/01/2026M01110201-I1Open ↗
09/01/2026M01110201-I1Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
06/14/2019123750618Open ↗
11/17/2017123148343Open ↗
11/15/2017123148343Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026M01110201-I1Open ↗
08/30/2026M00772477-I1Open ↗
08/30/2026M01110201-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00377693-I1Open ↗
09/02/2026M00765352-I1Open ↗
09/02/2026M00766180-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/02/2017123148343Open ↗
03/09/2015122287113Open ↗
08/26/2014122104301Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/14/2019123750618Open ↗
11/01/2017123148343Open ↗
03/09/2015122287113Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/01/2011120619376Open ↗
10/28/2010120510553Open ↗
10/13/2010120493509Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/06/2014140235582Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/06/2014140235582Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/14/2019123750618Open ↗
03/09/2015122287113Open ↗
07/25/2014122017888Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
02/26/2015122017888Open ↗
09/12/2014122017888Open ↗
08/13/2014122017888Open ↗
▸BISEQUIPMENT USE PERMITS1
11/13/2017123148343Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/13/2017123148343Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
11/01/2017123148343Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00651351-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/04/2026M00377693-I1Open ↗
09/02/2026M00765352-I1Open ↗
09/02/2026M00766180-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/01/2011120619376Open ↗
12/11/2010120548381Open ↗
10/28/2010120510553Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/14/2019123750618Open ↗
08/26/2014122104301Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/06/2010120311359Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
10/13/2010120493509Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/14/2019123750618Open ↗
11/17/2017123148343Open ↗
11/02/2017123148343Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/17/2017123148343Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00766180-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/12/2021123750618Open ↗
08/06/2014140235582Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/21/2021123750618Open ↗
11/17/2017123148343Open ↗
11/17/2017123148343Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
10/01/2012121395695Open ↗
03/01/2011120619376Open ↗
12/11/2010120548381Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/09/2012120548381Open ↗
06/15/2011120493509Open ↗
05/23/2011120619376Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/01/2012121395695Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
04/21/2021123750618Open ↗
06/14/2019123750618Open ↗
11/01/2017123148343Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET11
06/14/2019123750618Open ↗
11/01/2017123148343Open ↗
03/09/2015122287113Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM2
11/17/2017123148343Open ↗
11/15/2017123148343Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/06/2014140235582Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/18/2014122104301Open ↗
01/18/2011120311359Open ↗
▸BISPLOT DIAGRAM1
10/01/2012121395695Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M00651351-I1Open ↗