DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB03/15/2018V-DOB VIOLATION - ACTIVE
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB03/03/2017V-DOB VIOLATION - ACTIVE
DOB12/01/2016VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB03/18/2016V-DOB VIOLATION - ACTIVE
DOB01/29/2015V-DOB VIOLATION - ACTIVE
DOB05/30/2014VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
DOB02/27/2009V-DOB VIOLATION - ACTIVE
DOB03/21/2008V-DOB VIOLATION - ACTIVE
DOB04/02/2007V-DOB VIOLATION - ACTIVE
DOB10/01/2005V-DOB VIOLATION - ACTIVE
DOB11/19/2004V-DOB VIOLATION - ACTIVE
DOB04/21/2004V-DOB VIOLATION - ACTIVE
DOB03/21/2003V-DOB VIOLATION - ACTIVE
DOB02/19/2002V-DOB VIOLATION - ACTIVE
DOB03/08/2001V-DOB VIOLATION - ACTIVE
DOB03/10/2000V-DOB VIOLATION - ACTIVE
DOB01/20/1999V-DOB VIOLATION - ACTIVE
DOB01/06/1998V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB03/08/1996V-DOB VIOLATION - ACTIVE
DOB02/14/1996VP-VIOLATION UNSERVED ECB-ACTIVE
DOB04/17/1995V-DOB VIOLATION - ACTIVE
DOB05/31/1994V-DOB VIOLATION - ACTIVE
DOB06/28/19931
DOB04/07/19921
ECB01/08/2008CEASE USE.16L10,66Z09,05L10,85BB05,51B12,54B12.CU-16L10 BASEMENT HATCHWAY DOOR WON'T CLOSE PROPERTY & THE BASEMENT LOCK IS JUMPED CAR RUNS W/DOOR OPEN.BEFORE RETURNING BACK TO SERVICE CALL DOB AT 212-566-5544Nothing owed — awaiting certificate of correction
ECB01/17/200785U05.Nothing owed — awaiting certificate of correction
ECB04/26/2006WORK W/O PERMIT. WORK NOTED: STEEL I BEAMS WERE ERECTED BETWEEN 2 BLDGTO CREATE AN ENCLOSED STORAGE AREA. CARROGATED SHEET METAL WAS INSTALLED ON BOTH THE OUTSIDE WALL & ROOF TO CREATE THIS STORAGE ROOM. ELECTRNothing owed — awaiting certificate of correction
ECB04/26/2006ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. A BUILDING BUILT WITH STEEL I BEAMS & CORROGATED SHEET METAL BTWN 2 BUILDING WITHOUT A PERMIT, ALTERING THE CERTIFICATE OF OCCUPANCY.Nothing owed — awaiting certificate of correction
ECB04/26/2006WORK W/O PERMIT. WORK NOTED: AN OPENING WAS CREATED AND A ROLL DOWN GATE INSTALLED. THE CURB WAS PAINTED YELLOW. THE OPENING IS APPROX. 12'-0" X 5'-0". REMEDY: OBTAIN A PERMIT OR RESTORE TO PRIOR LEGAL CONDITIONothing owed — awaiting certificate of correction