Elevator cooperative
565 WEST END AVENUE
MANHATTAN · BIN 1033974
💬 Discuss this project
1937Year Built
20Stories
D4Building Class
R10AZoning
155,906 sfGross Floor Area
100Units
LL97 CoveredRent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 565 EQUITIES INC · 10,090 sf lot · 15.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 12 docs
Floor 6Under Construction9p · 1 filing · 11 docs
Floor 5
Floor 4
Floor 3
Floor 2Under Construction5p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
1 job · most recent 12/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/08/2025Permit IssuedNEW YORK PARK PLBG&HTG COGas, Water/Sanitary
15 jobs · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
04/13/2026Permit IssuedALBA ELECTRIC CORPGeneral Wiring
02/19/2026Permit IssuedIKAROS ELECTRICAL ENT INCGeneral Wiring
12/17/2025Permit IssuedTM SELECT ELECTRIC CORPGeneral Wiring
10/24/2025Permit IssuedINDY ELECTRIC CORP.General Wiring
03/14/2025CompleteAMSTERDAM ELECTRIC CORP—
02/06/2025CancelledURBANO'S ELECTRICAL CORPGeneral Wiring
08/02/2022CompleteELPO ELECTRICAL CONTG INC—
02/14/2022CompleteTOP SHELF ELECTRIC CORP—
09/27/2021CompleteLINA ELECTRIC, CORP—
09/09/2021CompleteWCK ELECTRIC CORP.General Wiring
06/22/2021CompleteSTRONG ISLAND ELECTRIC LLGeneral Wiring
11/14/2019CompleteR.J. ELEC AND MAINTENANCEGeneral Wiring
06/25/2019CompleteROBERT CHIMENTIGeneral Wiring
11/19/2018CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
2 jobs · most recent 10/21/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/21/2022Permit IssuedUNIVERSAL SYSTEMS INCSidewalk Shed
07/11/2022Permit IssuedTWO-TONE CONTRACTING CORPScaffold
2 jobs · most recent 01/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/20/2026Permit IssuedM&M PLUMBING & HEATING INTenant Protection Plan 72 Hour
12/08/2025Permit IssuedNEW YORK PARK PLBG&HTG COTenant Protection Plan 72 Hour
Building Lifecycle
All (129)Filed (12)Permit Issued (14)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (7)Objection (6)Special Inspection (12)
05/20/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Permit issued — Plumbing
M01321211-S1-PL
02/18/2026
Permit issued — General Construction
M01321211-I1-GC
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Scope
02/05/2026
Objection raised — Scope
01/21/2026
Objection resolved — Addressed
01/20/2026
Filed — Alteration
Modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
M01321211-S1
01/20/2026
Objection raised — Scope
01/07/2026
Filed — Alteration
Modification of plumbing fixtures as shown on submitted plans. No change in occupancy, use or egress.
M01321211-I1
12/17/2025
Permit issued — Plumbing
M01278308-S1-PL
12/16/2025
Permit issued — General Construction
M01278308-I1-GC
12/08/2025
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES AND RANGE, RELOCATE LAVATORY IN APARTMENT 6A.
M01278308-S1
12/05/2025
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES AND RANGE, RELOCATE LAVATORY IN APARTMENT 6A.
M01278308-I1
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
08/27/2025
Special inspection requirement — Final
Steven Bendoraitis
09/28/2023
Cycle 9 facade report signed — SAFE
08/29/2023
Cycle 9 facade report submitted
08/09/2023
Signed off — Alteration
Repair/replace facade to include masonry, pointing, lintels, coping stones, waterproofing, caulking. Scrp[ae, prime, and paint existing window frames.
M00549439-I1
08/09/2023
Cycle 9 facade inspection completed
03/24/2023
Permit issued — General Construction
M00549439-I1-GC
02/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00790806-I1
10/21/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00683826-P3
09/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/07/2022
Signed off — Alteration
M00498828-I1
08/18/2022
Permit issued — Sidewalk Shed
M00790806-I1-SF
08/18/2022
Permit issued — Supported Scaffold
M00790806-I1-SH
08/12/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00683826-P2
08/11/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00790806-I1
08/11/2022
Permit issued — Supported Scaffold
M00790806-I1-SH
08/11/2022
Permit issued — Supported Scaffold
M00790806-I1-SF
08/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2022
Filed — Alteration
Supported scaffold installation as per plans filed herewith. No change in use, egress or occupancy.
M00771252-I1
07/11/2022
Permit issued — Supported Scaffold
M00771252-I1-SF
06/13/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00683826-P1
04/19/2022
Permit issued — General Construction
M00549439-I1-GC
03/28/2022
Filed — Alteration
Repair/replace facade to include masonry, pointing, lintels, coping stones, waterproofing, caulking. Scrp[ae, prime, and paint existing window frames.
M00549439-I1
02/21/2022
Permit issued — Sidewalk Shed
M00683826-I1-SH
02/18/2022
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00683826-I1
02/16/2022
Cycle 9 facade report submitted
02/16/2022
Cycle 9 facade report signed — UNSAFE
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2022
Cycle 9 facade inspection completed
11/29/2021
Permit issued — General Construction
M00498828-I1-GC
06/29/2021
Special inspection requirement — Energy Code Compliance Inspections
JAMES BLUM
06/29/2021
Special inspection requirement — Air barrier - visual inspection
JAMES BLUM
06/29/2021
Special inspection requirement — Fenestration air leakage
JAMES BLUM
06/29/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES BLUM
06/29/2021
Special inspection requirement — Masonry
JAMES BLUM
06/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES BLUM
06/29/2021
Special inspection requirement — Final
JAMES BLUM
06/25/2021
Permit issued — General Construction
M00498828-I1-GC
Latest 60 of 129 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIVERSAL SYSTEMS1303/22/2026
TWO TONE CONTRACTING503/22/2026
565 EQUITES INC.7803/22/2026
STOW CONTRACTING103/22/2026
VERALON103/22/2026
TUDOR REALTY SERVICES503/22/2026
56R EQUITIES203/21/2026
ARGO REALTY203/21/2026
565 EQUITI803/21/2026
565 OWNERS CORP C O ARGO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTANTS403/21/2026
S M EXPEDITING403/21/2026
EUROCELT EXPEDITING, INC803/21/2026
HIERARCH-E203/21/2026
D D EXPEDITORS203/21/2026
CODE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWO-TONE CONTRACTING CORP.General Contractor507/08/2026
LEMX CORPGeneral Contractor407/08/2026
MY CONTRACTING COMPANY I*General Contractor407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
ROCK CONSTRUCTION NY INCGeneral Contractor303/21/2026
UNIVERSAL SYSTEMS INCGeneral Contractor303/21/2026
QEC ELECTRICAL SVCE CORPElectrical103/22/2026
TOMASZ MILEWSKIElectrical103/21/2026
URBANO'S ELECTRICAL CORPElectrical103/22/2026
WCK ELECTRIC CORP.Electrical103/22/2026
KANARIS CONTRACTING CORPGeneral Contractor104/09/2026
M&M PLUMBING & HEATING INPlumbing107/08/2026
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
GLEICH, BERNARDElectrical103/21/2026
JOHN HAPSISElectrical103/21/2026
KATZ MICHAELElectrical103/21/2026
MICHAEL KATZElectrical103/21/2026
MORALES, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VAKOTA ARCHITECTURE7281101/07/2026
EC SPECIAL INSPECTIONS8355212/08/2025
JOSEPH K. BLUM CO. LLP1741103/28/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM&M PLUMBING & HEATING IN03/03/2026
DOB NOWGeneral ConstructionPermit IssuedKANARIS CONTRACTING CORP02/18/2026
DOB NOWPlumbingPermit IssuedNEW YORK PARK PLBG&HTG CO12/17/2025
DOB NOWGeneral ConstructionPermit IssuedROCK CONSTRUCTION NY INC12/16/2025
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP03/24/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP08/18/2022
DOB NOWSupported ScaffoldSigned-offLEMX CORP08/18/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC08/11/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC08/11/2022
DOB NOWSupported ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP07/11/2022
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP04/19/2022
DOB NOWSidewalk ShedPermit IssuedUNIVERSAL SYSTEMS INC02/21/2022
DOB NOWGeneral ConstructionSigned-offMY CONTRACTING COMPANY I*11/29/2021
DOB NOWGeneral ConstructionSigned-offMY CONTRACTING COMPANY I*06/25/2021
BISPLISSUEDFLYTIGER P & H LTD06/21/2019
BISPLISSUEDBENT MECHANICAL CORP12/21/2018
BISOTISSUEDGEC DESIGN GROUP LTD12/19/2018
BISOTISSUEDRIGID INTERIOR CONSTR LLC11/05/2018
BISOTISSUEDEVERLAST SOLUTIONS CORP11/30/2017
BISEQISSUEDUNIVERSAL SYSTEMS INC08/08/2017
BISPLISSUEDJ&M PLUMBING OF WESTCHESTER07/26/2017
BISOTISSUEDMCCORMACK CONTRACTING INC.06/19/2017
BISPLISSUEDR.J.C. MECHANICAL CORP02/06/2017
BISMHISSUEDNEW WAVE DESIGN & CONTRACTING02/02/2017
BISOTISSUEDNEW WAVE DESIGN & CONTRACTING01/11/2017
BISOTISSUEDEVERLAST SOLUTIONS CORP12/09/2016
BISOTISSUEDEVERLAST SOLUTIONS CORP09/26/2016
BISPLISSUEDAAA TOTAL PLUMBING, INC07/15/2016
BISOTISSUEDBNH CONSTRUCTION NY INC07/08/2016
BISEQISSUEDEVEREST SCAFFOLDING INC07/06/2016
BISPLISSUEDARANDA PLBG & HTG CORP05/10/2016
BISOTISSUEDRIGID INTERIOR CONSTR LLC03/23/2016
BISPLISSUEDR.J.C. MECHANICAL CORP11/09/2015
BISMHISSUEDNEW WAVE DESIGN & CONTRACTING11/02/2015
BISPLISSUEDARANDA PLBG & HTG CORP10/23/2015
BISOTISSUEDRIGID INTERIOR CONSTR LLC10/20/2015
BISOTISSUEDNEW WAVE DESIGN & CONTRACTING10/19/2015
BISPLISSUEDARANDA PLBG & HTG CORP06/10/2015
BISOTISSUEDRIGID INTERIOR CONSTR LLC06/03/2015
BISPLISSUEDARANDA PLBG & HTG CORP12/30/2014
+ 24 more permits on file
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/20/2026Fail-Final Boiler Equipment InspectionFailView ↗
05/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/05/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
12/05/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
11/26/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
08/27/2025FinalSteven Bendoraitisprogress
06/29/2021Energy Code Compliance InspectionsJAMES BLUMprogress
06/29/2021Air barrier - visual inspectionJAMES BLUMenergy_progress
06/29/2021Fenestration air leakageJAMES BLUMenergy_progress
06/29/2021Fenestration and door U-factor and product ratingsJAMES BLUMenergy_progress
06/29/2021MasonryJAMES BLUMspecial
06/29/2021Structural Stability – Alterations of existing buildingsJAMES BLUMspecial
06/29/2021FinalJAMES BLUMprogress
04/06/2021FinalBrian Gillenprogress
▾Documents — 612 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00498828-I1Contact architect ↗
09/02/2026M00549439-I1Contact architect ↗
09/02/2026M00771252-I1Contact architect ↗
Showing 3 of 12 on file for this type
▸Applications & Permits120
▸BISWORK PERMIT APPLICATION57
06/24/2019102524653Open ↗
12/21/2018123414910Open ↗
12/20/2018123414910Open ↗
Showing 3 of 57 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION56
02/27/2024104875501Open ↗
07/09/2019102524653Open ↗
07/08/2019102524653Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M01321211-I1Open ↗
08/13/2026M00549439-I1Open ↗
08/13/2026M01278308-S1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/29/2016120115963Open ↗
▸Seals & Professional Certifications127
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
08/01/2019123414910Open ↗
07/31/2019102524653Open ↗
07/09/2019102524653Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00771252-I1Open ↗
08/19/2026M01321211-S1Open ↗
08/19/2026M01321211-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026M00498828-I1Open ↗
08/26/2026M01278308-I1Open ↗
08/25/2026M00549439-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/11/2017123105932Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/11/2017123105932Open ↗
08/12/2016140535151Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/12/2016140535151Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/12/2016140535151Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026M01278308-S1Open ↗
08/26/2026M01278308-I1Open ↗
08/25/2026M00549439-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment65
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
07/09/2019102524653Open ↗
06/26/2019102524653Open ↗
11/28/2018123414910Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS4
12/09/2016122410462Open ↗
10/27/2016122410462Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/10/2016122410462Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes10
11/28/2018123414910Open ↗
10/03/2018123467596Open ↗
07/24/2018122770518Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos34
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
11/28/2018123414910Open ↗
10/04/2018104119525Open ↗
10/03/2018123467596Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026M01321211-I1Open ↗
08/19/2026M01321211-S1Open ↗
08/13/2026M00549439-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
08/01/2019123414910Open ↗
11/28/2018123414910Open ↗
07/24/2018122770518Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
08/01/2019123414910Open ↗
07/24/2018122770518Open ↗
05/16/2018122454780Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00549439-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
10/27/2016122410462Open ↗
▸Approvals, Objections & Sign-offs70
▸BISLANDMARKS APPROVAL30
08/01/2019123414910Open ↗
07/31/2019102524653Open ↗
10/04/2018104119525Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
08/01/2019123414910Open ↗
07/31/2019102524653Open ↗
07/08/2019123467596Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT54
08/01/2019123414910Open ↗
07/08/2019123467596Open ↗
11/28/2018123414910Open ↗
Showing 3 of 54 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/28/2018123414910Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/27/2024104875501Open ↗
▸Filing & Intake Forms62
▸BISEFILING COVER SHEET29
11/28/2018123414910Open ↗
10/03/2018123467596Open ↗
08/11/2017123105932Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION16
11/05/2018123467596Open ↗
12/26/2017122848847Open ↗
08/24/2017123043321Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM12
08/01/2019123414910Open ↗
07/31/2019102524653Open ↗
07/09/2019102524653Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/12/2016140535151Open ↗
Showing 1 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
11/25/2016122848847Open ↗