← Back
Three families
566 HALSEY STREET
BROOKLYN · BIN 3046484
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,774 sfGross Floor Area
3Units
Rent Stabilized72 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 566 HALSEY STREET LLC · 2,000 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof18p · 1 filing · 20 docs
Floor 314p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
429 E 122807/08/2026
566 HALSEY STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/26/2025$1.6M—— → —$424/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSEN ENGINEERING, PC709/12/2025
KUSHNER STUDIOS308/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BADGER MANAGEMENT INCGeneral Contractor407/08/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA96051009/12/2025
Building Lifecycle
All (129)Filed (10)Permit Issued (5)Violation (60)Inspection (8)Objection (16)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
09/12/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P6
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
09/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/05/2025
Special inspection requirement — Structural Steel - Welding
JAMES CHUN
09/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JAMES CHUN
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
09/05/2025
Special inspection requirement — Structural Steel - Details
JAMES CHUN
09/05/2025
Special inspection requirement — Post-installed Anchors
JAMES CHUN
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
JAMES CHUN
09/05/2025
Special inspection requirement — Structural Cold-Formed Steel
JAMES CHUN
09/05/2025
Special inspection requirement — Structural Wood Frame
JAMES CHUN
09/05/2025
Special inspection requirement — Final
Cloud Lee
09/05/2025
Special inspection requirement — Wood – Seismic Resistance
JAMES CHUN
09/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/29/2025
Objection resolved — Addressed
08/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/27/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/27/2025
Objection raised — Other
08/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
08/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/22/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P5
08/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
08/19/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P3
08/18/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P2
08/18/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P4
08/18/2025
Special inspection requirement — Final
JAMES CHUN
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/18/2025
Special inspection requirement — Mechanical Systems
JAMES CHUN
08/13/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC#B01062533-I1
B01062533-P1
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
07/28/2025
Special inspection requirement — Structural Wood Frame
JAMES CHUN
07/28/2025
Special inspection requirement — Final
JAMES CHUN
07/28/2025
Special inspection requirement — Wood – Seismic Resistance
07/28/2025
Special inspection requirement — Structural Steel - Welding
JAMES CHUN
07/28/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JAMES CHUN
07/28/2025
Special inspection requirement — Structural Steel - Details
JAMES CHUN
07/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
07/28/2025
Special inspection requirement — Structural Cold-Formed Steel
JAMES CHUN
06/09/2025
Permit issued — Plumbing
B01062533-S1-PL
06/09/2025
Violation issued (HPD, closed)
A
05/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/06/2025
Permit issued — Structural
B01062533-S3-ST
04/29/2025
Objection raised — Other
04/29/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/11/2025
Permit issued — General Construction
B01062533-I1-GC
04/10/2025
Permit issued — Plumbing
B01062533-S1-PL
04/09/2025
Permit issued — Mechanical Systems
B01062533-S2-MS
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/09/2025
DOB NOWStructuralSigned-offBADGER MANAGEMENT05/06/2025
DOB NOWGeneral ConstructionSigned-offBADGER MANAGEMENT04/11/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/10/2025
DOB NOWMechanical SystemsPermit IssuedBADGER MANAGEMENT04/09/2025
1 project · most recent 09/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Signed-offBADGER MANAGEMENT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 3MXL24WMVJU9 24,000 BTU · Condensing Unit ×6
4MXL36WVJU9 36,000 BTU · Condensing Unit ×6
DAIKIN 2MXL18WMVJU9 18,000 BTU · Condensing Unit ×2
Ventilation
— N/A 95 CFM · Exhaust Fan ×9
N/A n/a 95 CFM · Exhaust Fan ×9
1 project · most recent 09/12/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
09/12/2025Signed-offT & T PLUMBING INCGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 04/13/2025
General Wiring
FiledStatusContractorScope
04/13/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 09/12/2025
Steel Concrete Wood
FiledStatusContractorScope
09/12/2025Signed-offT & T PLUMBING INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/27/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
09/12/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/11/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/05/2025Structural Steel - WeldingJAMES CHUNspecial
09/05/2025Structural Steel - High Strength BoltingJAMES CHUNspecial
09/05/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
09/05/2025Structural Steel - DetailsJAMES CHUNspecial
09/05/2025Post-installed AnchorsJAMES CHUNspecial
09/05/2025Concrete - Cast-In-PlaceJAMES CHUNspecial
09/05/2025Structural Cold-Formed SteelJAMES CHUNspecial
09/05/2025Structural Wood FrameJAMES CHUNprogress
09/05/2025FinalCloud Leeprogress
09/05/2025Wood – Seismic ResistanceJAMES CHUNspecial
08/25/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
08/25/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
08/25/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
08/21/2025Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
08/21/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
08/21/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
08/18/2025FinalJAMES CHUNprogress
08/18/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
08/18/2025Mechanical SystemsJAMES CHUNspecial
08/11/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
07/28/2025Structural Wood FrameJAMES CHUNprogress
07/28/2025FinalJAMES CHUNprogress
07/28/2025Wood – Seismic Resistance—special
Latest 25 of 35.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01062533-S2Request digital key ↗
08/21/2026B01062533-S1Request digital key ↗
08/21/2026B01062533-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/21/2026B01062533-P2Open ↗
08/21/2026B01062533-P5Open ↗
08/13/2026B01062533-S2Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B01062533-S2Open ↗
09/01/2026B01062533-P6Open ↗
08/31/2026B01062533-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026B01062533-S3Open ↗
08/21/2026B01062533-S2Open ↗
08/21/2026B01062533-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01062533-S2Open ↗
08/29/2026B01062533-I1Open ↗
08/28/2026B01062533-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/21/2026B01062533-S2Open ↗
08/21/2026B01062533-S1Open ↗
08/21/2026B01062533-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/21/2026B01062533-P5Open ↗
08/13/2026B01062533-P1Open ↗
08/13/2026B01062533-I1Open ↗