Bobst Library
567 LA GUARDIA PLACE · BIN 1008626
💬 Discuss this project
1973Year Built
12Stories
W6Building Class
R7-2Zoning
470,400 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FISP: SAFE
Other college and university · Owner of record: NEW YORK UNIVERSITY · 51,205 sf lot · 9.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneralOther
Floor 111p · 1 filing · 14 docs
Floor 105p · 2 filings · 14 docs
Floor 91p · 1 filing · 14 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31p · 1 filing · 13 docs
Floor 2
Floor 111p · 2 filings · 20 docs
Sub-Cellar3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYU CONT 500 KMBL103/22/2026
NYU603/22/2026
COLGATE ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK UNIVERSITY903/21/2026
YAO W GUO ARCHITECT, PC403/21/2026
AE DESIGN SOLUTION403/21/2026
RIZZO GROUP403/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
J A EXPEDITING203/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
KTSE ENGINEERING, P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGHMARK TEC & CHILLERGeneral Contractor603/21/2026
BRENNAN OPERATING INCGeneral Contractor607/08/2026
BROSNA CONSTRUCTION CORPOGeneral Contractor507/08/2026
PALACE HOISTING & SCAFFOLDINGGeneral Contractor207/08/2026
PENGUIN MAINTENANCE & SERGeneral Contractor207/08/2026
PJP INSTALLERS INCGeneral Contractor203/21/2026
STAR-DELTA ELECTRIC, LLCElectrical103/22/2026
DENKO MECHANICAL INCFire Protection107/08/2026
UNITED PLBG MECHANICAL INCFire Protection107/08/2026
EAST COAST MECHANICAL LLCPlumbing107/08/2026
ARCADIA ELECT'L CO. INC.Electrical103/22/2026
TRISTATE PLBG SVCS CORPPlumbing107/08/2026
BOYKO, JElectrical103/21/2026
CONDUCTOR ELECL SVCS INCElectrical103/22/2026
KILPATRICK, DONALDElectrical103/21/2026
MADZY, JOHNElectrical103/21/2026
P.E. STONE INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267710/06/2025
FENAGH, INC6942204/23/2025
GROUP-S LLC5216109/27/2022
KLINE ENGINEERING, PC1007909/23/2022
LEE KANTOR, P.E.5988109/10/2019
Building Lifecycle
All (174)Filed (24)Permit Issued (21)Signed Off (16)Facade (FISP) (15)Violation (60)Inspection (6)Objection (2)Special Inspection (30)
08/14/2026
Cycle 10 facade report submitted
08/13/2026
Cycle 10 facade report signed — SWARMP
08/05/2026
Cycle 10 facade inspection completed
04/13/2026
Signed off — Alteration
IRA Facade Inspection
M01378185-I1
04/01/2026
Permit issued — Suspended Scaffold
M01378185-I1-SC
03/31/2026
Objection raised — Other
03/31/2026
Objection resolved — Addressed
03/25/2026
Filed — Alteration
IRA Facade Inspection
M01378185-I1
02/11/2026
Signed off — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-S2
11/07/2025
Signed off — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-I1
11/06/2025
Signed off — Alteration
M01125749-I1
10/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
10/06/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-P3
10/02/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
10/02/2025
Special inspection requirement — Final
Matthew Wavro
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
09/29/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-P2
09/09/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-P1
09/05/2025
Signed off — Alteration
Replacement of 196 Fan Coil Units. No change in use, egress or occupancy.
M00785149-I1
09/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
Matthew Wavro
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
09/04/2025
Special inspection requirement — Maintenance information
Matthew Wavro
09/04/2025
Special inspection requirement — Final
Matthew Wavro
09/04/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
09/04/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
09/04/2025
Special inspection requirement — Lighting controls
Matthew Wavro
09/04/2025
Special inspection requirement — Interior lighting power
Matthew Wavro
09/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
07/10/2025
Permit issued — Mechanical Systems
M01155723-S1-MS
07/10/2025
Permit issued — General Construction
M01155723-I1-GC
06/27/2025
Signed off — Alteration
INSTALLATION OF SECURITY WALL AND DOOR, TO ATRIUM CONVINIENCE STAIR AT 10TH FLOOR LEVEL AS INDICATED ON PLANS SUBMITTED HEREWITH.
M01213931-I1
05/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2025
Permit issued — General Construction
M01213931-I1-GC
04/24/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
04/24/2025
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
04/23/2025
Filed — Alteration
INSTALLATION OF SECURITY WALL AND DOOR, TO ATRIUM CONVINIENCE STAIR AT 10TH FLOOR LEVEL AS INDICATED ON PLANS SUBMITTED HEREWITH.
M01213931-P1
04/22/2025
Filed — Alteration
INSTALLATION OF SECURITY WALL AND DOOR, TO ATRIUM CONVINIENCE STAIR AT 10TH FLOOR LEVEL AS INDICATED ON PLANS SUBMITTED HEREWITH.
M01213931-I1
04/14/2025
Permit issued — Plumbing
M01155723-S2-EW-SP
04/10/2025
Permit issued — Mechanical Systems
M01155723-S1-MS
04/10/2025
Permit issued — Sprinklers
M01155723-S2-PL
04/04/2025
Permit issued — General Construction
M01155723-I1-GC
01/30/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-S2
01/30/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-S1
01/29/2025
Filed — Alteration
modification of existing hvac system, ductwork and associated piping as per plans filed herewith.
M01155723-I1
01/15/2025
Permit issued — Mechanical Systems
M01125749-I1-GC-CX
12/13/2024
Filed — Alteration
M01125749-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2024
Permit issued — Mechanical Systems
M00785149-I1-MS
06/02/2023
Signed off — Alteration
HEAT EXCHANGER REPLACEMENT
M00547724-I1
04/13/2023
Signed off — Alteration
Mechanical modifications for HVAC installation to the 3rd floor as per plans filed herewith. No change in use, egress or occupancy.
M00594243-I1
04/11/2023
Signed off — Alteration
Filing for Mechanical modifications for the installation of HVAC units on the 3rd, 5th, 9th, 11th and 12th floors as pre plans filed herewith. No change in use, egress or occupancy.
M00268449-I1
12/21/2022
Signed off — Alteration
FILING HEREWITH APPLICATION FOR MECHANICAL DUCTWORK AND PIPING ON SUB-CELLAR AND 10TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00653135-I1
12/13/2022
Signed off — Alteration
M00653124-I1
10/18/2022
Permit issued — Mechanical Systems
M00785149-I1-MS
09/27/2022
Filed — Alteration
Replacement of 196 Fan Coil Units. No change in use, egress or occupancy.
M00785149-I1
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSUPERSTARS CONTRACTING IN04/01/2026
DOB NOWMechanical SystemsPermit IssuedBRENNAN OPERATING07/10/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING07/10/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO04/24/2025
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC04/14/2025
DOB NOWMechanical SystemsPermit IssuedBRENNAN OPERATING04/10/2025
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP04/10/2025
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING04/04/2025
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO01/15/2025
DOB NOWMechanical SystemsSigned-offHIGHMARK TEC & CHILLER01/31/2024
DOB NOWMechanical SystemsSigned-offHIGHMARK TEC & CHILLER10/18/2022
DOB NOWPlumbingSigned-offEAST COAST MECHANICAL LLC04/11/2022
DOB NOWMechanical SystemsSigned-offPENGUIN MAINTENANCE & SER03/09/2022
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO01/25/2022
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO01/19/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC12/18/2020
DOB NOWMechanical SystemsSigned-offPENGUIN MAINTENANCE & SER01/15/2020
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC10/04/2019
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING10/03/2019
DOB NOWSupported ScaffoldSigned-offPALACE HOISTING & SCAFFOL09/24/2018
DOB NOWSidewalk ShedSigned-offPALACE HOISTING & SCAFFOL07/11/2018
BISOTISSUEDBRENNAN OPERATING INC07/17/2023
BISOTISSUEDBRENNAN OPERATING INC07/17/2023
BISMHISSUEDBRENNAN OPERATING INC07/17/2023
BISOTISSUEDBRENNAN OPERATING INC07/17/2023
BISPLISSUEDCARDOZA PLUMBING CORP05/08/2023
BISSPISSUEDUNITED PLBG MECHANICAL INC04/21/2023
BISMHISSUEDBRENNAN OPERATING INC09/26/2022
BISOTISSUEDBRENNAN OPERATING INC09/26/2022
BISOTISSUEDBRIGHT POWER INC06/30/2022
BISSPISSUEDUNITED PLBG MECHANICAL INC03/04/2022
BISOTISSUEDBRIGHT POWER INC02/24/2022
BISOTISSUEDBRENNAN OPERATING INC11/16/2021
BISMHISSUEDBRENNAN OPERATING INC11/16/2021
BISOTISSUEDBRIGHT POWER INC07/09/2021
BISOTISSUEDBRENNAN OPERATING INC07/15/2020
BISOTISSUEDSPK/LEWIS CONSTRUCTION LL03/09/2020
BISOTISSUEDBRENNAN OPERATING INC08/06/2019
BISOTISSUEDBRENNAN OPERATING INC07/22/2019
BISOTISSUEDSKYLINE RESTORATION INC02/28/2019
+ 31 more permits on file
1 project · most recent 10/06/2025
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2025Signed-offBRENNAN OPERATING INCHeating Systems, Ventilation Systems
Heating
Titus DESV-6; DESV-6; DESV-10; DESV-7; DESV-7 2,980 CFM · Vav Box ×10
Ventilation
Titus DESV-6; DES-4; DESV-4 715 CFM · Vav Box ×6
Greenheck BSQ-160 2,825 CFM · Exhaust Fan ×2
1 project · most recent 10/06/2025
FiledStatusContractorScope
10/06/2025Signed-offDENKO MECHANICAL INC90 heads
1 project · most recent 10/06/2025
Water/Sanitary
FiledStatusContractorScope
10/06/2025Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
18 projects · most recent 12/03/2025
General Wiring Lighting
FiledStatusContractorScope
12/03/2025CompleteMATROS AUTOMATED ELEC'L CGeneral Wiring
01/14/2025CompleteCONDUCTOR ELECL SVCS INC—
05/03/2023CompleteRIGID ELECTRIC, INC.—
10/31/2022CompleteRIGID ELECTRIC, INC.—
06/15/2022CompleteHUGH O'KANE ELEC. CO. INCGeneral Wiring
05/20/2022CompleteBIGMAN BROS., INC.General Wiring
05/17/2022CompleteRIGID ELECTRIC, INC.General Wiring
02/02/2022CompleteARCADIA ELECT'L CO. INC.—
01/24/2022CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
12/15/2020CompleteTOP SHELF ELECTRIC CORP—
12/10/2020CompleteHUGH O'KANE ELEC. CO. INCGeneral Wiring
07/15/2019Permit IssuedP.E. STONE INCGeneral Wiring
07/03/2019Permit IssuedHUGH O'KANE ELEC. CO. INCGeneral Wiring
04/16/2019Permit IssuedJAM ELECTRICAL CORP—
10/26/2018Permit IssuedP. E. STONE, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
10/20/2025Sprinkler SystemsMatthew Wavrospecial
10/02/2025Post-installed AnchorsMatthew Wavrospecial
10/02/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/02/2025FinalMatthew Wavroprogress
09/04/2025FinalMatthew Wavroprogress
09/04/2025Maintenance informationMatthew Wavroenergy_progress
09/04/2025Interior lighting powerMatthew Wavroenergy_progress
09/04/2025HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
09/04/2025Sprinkler SystemsMatthew Wavrospecial
09/04/2025HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
09/04/2025Lighting controlsMatthew Wavroenergy_progress
09/04/2025Energy Code Compliance InspectionsMatthew Wavroprogress
09/04/2025Mechanical SystemsMatthew Wavrospecial
09/04/2025Duct leakage testing, insulation and designMatthew Wavroenergy_progress
04/24/2025FinalAILANTO DANIEL MINAWIprogress
04/24/2025Post-installed AnchorsAILANTO DANIEL MINAWIspecial
09/26/2022Energy Code Compliance InspectionsARNOLD KLINEprogress
09/26/2022Mechanical SystemsARNOLD KLINEspecial
09/26/2022FinalARNOLD KLINEprogress
09/26/2022Shutoff dampersARNOLD KLINEenergy_progress
09/26/2022HVAC-R and service water piping design and insulationARNOLD KLINEenergy_progress
09/26/2022HVAC-R and service water heating system controlsARNOLD KLINEenergy_progress
09/26/2022HVAC-R and service water heating equipmentARNOLD KLINEenergy_progress
09/26/2022Mechanical SystemsARNOLD KLINEspecial
09/26/2022FinalARNOLD KLINEprogress
Latest 25 of 61.
▾Documents — 1,296 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch16
09/06/2026M00059598-I1Request digital key ↗
09/06/2026M00079695-I1Request digital key ↗
09/03/2026M00547724-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00196229-I1Request digital key ↗
09/05/2026M00268449-P1Request digital key ↗
09/05/2026M00268449-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00440640-I1Request digital key ↗
08/15/2026M00440640-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00196259-I1Request digital key ↗
▸Applications & Permits253
▸BISPLAN / WORK APPROVAL APPLICATION130
12/08/2023103153212Open ↗
11/29/2023103153212Open ↗
11/29/2023103153212Open ↗
Showing 3 of 130 on file for this type
▸BISWORK PERMIT APPLICATION120
05/08/2023123442970Open ↗
03/07/2022123378638Open ↗
07/09/2021141003401Open ↗
Showing 3 of 120 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
10/19/2021123724005Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications335
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION166
03/20/2020140801327Open ↗
03/20/2020140801327Open ↗
03/11/2020123724005Open ↗
Showing 3 of 166 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST42
03/11/2020123724005Open ↗
08/05/2019123711395Open ↗
Showing 2 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
07/01/2021141003401Open ↗
03/11/2020123724005Open ↗
08/05/2019123711395Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M01155723-I1Open ↗
09/01/2026M00594243-P1Open ↗
09/01/2026M00594243-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00059598-I1Open ↗
09/06/2026M00079695-I1Open ↗
09/05/2026M00268449-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026M01155723-I1Open ↗
09/01/2026M01155723-P2Open ↗
09/01/2026M00594243-P1Open ↗
Showing 3 of 16 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/01/2021141003401Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/01/2021141003401Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment102
▸BISSELF-CERT PLUMBING NOTICE34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING16
07/13/2023123378638Open ↗
05/24/2023123378638Open ↗
Showing 2 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
06/27/2019123378638Open ↗
06/25/2019123378629Open ↗
Showing 2 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS14
01/26/2024123378629Open ↗
01/26/2024123378629Open ↗
01/26/2024123378629Open ↗
Showing 3 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
09/20/2021122780348Open ↗
06/28/2019123603555Open ↗
Showing 2 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
01/26/2024123378629Open ↗
01/03/2024123378629Open ↗
01/03/2024123378629Open ↗
Showing 3 of 6 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/02/2021141003401Open ↗
▸Environmental & Asbestos66
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
07/01/2021141003401Open ↗
03/11/2020123724005Open ↗
Showing 2 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00268449-I1Open ↗
08/25/2026M01125749-I1Open ↗
08/13/2026M00268449-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/21/2026M01155723-S2Open ↗
08/21/2026M01155723-S1Open ↗
08/21/2026M01155723-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
08/06/2019123711395Open ↗
06/26/2019123764051Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance88
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS49
03/20/2020140801327Open ↗
03/11/2020123724005Open ↗
11/04/2019123711395Open ↗
Showing 3 of 49 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
03/20/2020140801327Open ↗
11/04/2019123711395Open ↗
11/04/2019123764051Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
05/23/2023123378629Open ↗
05/17/2023123378629Open ↗
05/11/2023123378629Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/21/2023123378629Open ↗
04/27/2023123442970Open ↗
10/27/2022141003401Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00653135-I1Open ↗
08/13/2026M00653124-I1Open ↗
08/13/2026M00594243-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/01/2021141003401Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/21/2023123378629Open ↗
10/27/2022141003401Open ↗
▸BISELECTRIC MOTORS1
12/21/2023123378629Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/27/2022141003401Open ↗
▸BISINTERIOR LIGHTING POWER1
12/21/2023123378629Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00653135-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/01/2023123378638Open ↗
08/01/2023123378638Open ↗
05/23/2023123378638Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
12/21/2023123378629Open ↗
08/01/2023123378638Open ↗
10/27/2022141003401Open ↗
Showing 3 of 4 on file for this type
▸BISMECHANICAL SYSTEMS3
12/21/2023123378629Open ↗
04/27/2023123442970Open ↗
04/27/2023123442970Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
10/27/2022141003401Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs126
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST59
01/05/2024123378629Open ↗
08/15/2023123378638Open ↗
05/11/2023123442970Open ↗
Showing 3 of 59 on file for this type
▸BISADMINISTRATIVE OBJECTIONS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/06/2026M00059598-I1Open ↗
09/06/2026M00079695-I1Open ↗
09/05/2026M00268449-I1Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
11/28/2023103153212Open ↗
11/15/2023103153212Open ↗
Showing 2 of 7 on file for this type
▸BISFINAL4
12/21/2023123378629Open ↗
08/01/2023123378638Open ↗
02/15/2023123442970Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/13/2020140801327Open ↗
Showing 1 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
05/08/2023123442970Open ↗
▸Cost, Insurance & Ownership117
▸BISCOST AFFIDAVIT112
09/20/2021122780348Open ↗
07/01/2021141003401Open ↗
03/20/2020140801327Open ↗
Showing 3 of 112 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/21/2023123378629Open ↗
08/15/2023123378638Open ↗
08/15/2023123378638Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms124
▸BISEFILING COVER SHEET75
03/11/2020123724005Open ↗
08/05/2019123711395Open ↗
Showing 2 of 75 on file for this type
▸BISBOROUGH INTAKE FORM32
05/08/2023123442970Open ↗
03/07/2022123378638Open ↗
03/20/2020140801327Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION9
07/31/2023123378638Open ↗
06/12/2023123378638Open ↗
05/23/2023123378629Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet8
07/01/2021141003401Open ↗
Showing 1 of 8 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
03/11/2020123724005Open ↗
Showing 1 of 19 on file for this type
▸BISSupporting Document: Fee Deferment3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01378185-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00059598-I1Open ↗