HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROVIDE 20 GUAGE METAL ALL ACCESSIBLE OPENINGS REAR YARD. C92286H.
HPD12/08/2004SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 3RD STORY APT 2, KITCHEN AND BATHROOM.
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROVIDE TEMPORARY SEAL UP OF ALL ACCESSIBLE OPENING.
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE - CERAMIC TILE WALL AT BATHROOM, BASEMENT APT.
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE - WALL OF BASEMENT PUBLIC HALL.
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE - WOOD FLOOR UNDER KITCHEN SINK, BASEMENT APT.
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROVIDE TEMPORARY SEALING OF ALL ACCESSIBLE OPENINGS REAR
HPD12/08/2004SECTION 27-2005 ADMIN. CODE: PROVIDE TEMPORARY RESEAL ALL ACCESSIBLE OPENINGS TO BUILDING.
HPD08/03/1987SECTION 27-2005 ADM CODE PROVIDE RESEAL ALL ACCESSIBLE OPENINGS BLDG THRU OUT ER1.
Two family converted from one family · 2,000 sf lot · 1.26 FAR built · Flood zone X