| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/03/2026 | Permit Issued | CORE FOUR CONSTRUCTION IN | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation Renewaire HE4XINH 2,200 CFM · Erv ×1 |
| 01/14/2026 | Permit Issued | CORE FOUR CONSTRUCTION IN | Ventilation Systems | Ventilation Renewaire EV Premium M 200 CFM · Erv ×1 |
| 12/01/2025 | Permit Issued | NICON BUILD LLC | Heating and Air Conditioning Systems | Heat / Cool Water Furnace USH018 2 tons · Ahu ×2 |
| 10/28/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | Cooling Towers, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 03/20/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PEFY-P54NMAU-E4 54,000 BTU · Vrf Indoor ×2 PQHY-P120TLMU-A2 120,000 BTU · Vrf Outdoor ×2 PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×1 PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1 PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×1 PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×1 Ventilation Renewaire HE-3XJINV 2,075 CFM · Erv ×1 |
| 12/26/2019 | — | — | Air Conditioning Systems, Heating Systems | Cooling Mitsubishi Electric PUHY-P120TJMU-A 10 tons · Vrf Outdoor ×1 PUHY-P120TSJMU-A 10 tons · Vrf Outdoor ×1 Heating Mitsubishi Electric PEFY-P48NMHU-E2 4 tons · Vrf Indoor ×10 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/03/2026 | Permit Issued | SEAN COAKLEY P & H INC | 315 heads |
| 01/14/2026 | Permit Issued | SEAN COAKLEY P & H INC | Sprinkler System |
| 12/01/2025 | Permit Issued | ALLSTATE SPRINKLER LLC | Sprinkler System |
| 10/28/2025 | Permit Issued | SEAN COAKLEY P & H INC | 10 heads, 2 outlets |
| 03/20/2025 | Permit Issued | SEAN COAKLEY P & H INC | Sprinkler System |
| 11/09/2023 | Permit Issued | CROSSFIELD PLBG.&HTG.CORP | 17 heads |
| 09/01/2020 | Signed-off | F.S. SITE CORP | 32 heads |
| 08/23/2019 | Signed-off | FULL CAPACITY FIRE CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/03/2026 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 01/14/2026 | Signed-off | SEAN COAKLEY P & H INC | Water/Sanitary |
| 12/01/2025 | Permit Issued | M. EARLY PLBG & HTG CORP | Water/Sanitary |
| 10/28/2025 | Permit Issued | BEDROCK PLBG. & HTG., INC | Storm, Water/Sanitary |
| 03/20/2025 | Signed-off | SEAN COAKLEY P & H INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | DENALI ELECTRIC CORP | General Wiring |
| 06/11/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 12/05/2025 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring |
| 07/11/2025 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 07/11/2025 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 07/10/2025 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 06/17/2025 | Permit Issued | 5 J'S ELECTL CONTS CORP | — |
| 05/14/2024 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 07/21/2023 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 04/20/2023 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 02/01/2023 | Permit Issued | BRUNI ELECTRIC INC | General Wiring |
| 12/08/2021 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 09/02/2021 | Complete | JUMPER ELECTRIC CORP | General Wiring |
| 09/30/2020 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 08/12/2020 | Permit Issued | HV ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/10/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | Steel, Concrete |
| 10/31/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | Steel, Concrete |
| 09/02/2025 | Signed-off | LTM CONSTRUCTION LLC | Concrete |
| 07/21/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | 1 scope_items |
| 03/20/2025 | Permit Issued | CORE FOUR CONSTRUCTION IN | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | Permit Issued | NEW AMSTERDAM RESTORATION | Scaffold |
| 06/10/2025 | Permit Issued | URBAN INTELLIGENCE, INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2024 | Permit Issued | P-GOOM INC | Suspended Scaffold (SC) |
| 02/09/2024 | Permit Issued | — | — |
| Owner | Filings | Most Recent |
|---|---|---|
| 138 WOOSTER ST | 17 | 07/08/2026 |
| 568 BROADWAY PROPERTY | 232 | 07/08/2026 |
| AURORA CAPITAL ASSOCIATES | 34 | 07/08/2026 |
| Y LLC-SCF MANAGEMENT LLC | 2 | 03/22/2026 |
| ROCK GROUP NY | 4 | 03/22/2026 |
| SATO CONSTRUCTION | 2 | 03/22/2026 |
| Y LLC-SCF MGMT LLC 568 BR | 1 | 03/22/2026 |
| 568BROADWAY PROPERTIES | 22 | 03/22/2026 |
| EQUINOX HOLDINGS, INC | 1 | 03/22/2026 |
| BROADWAY JOINT VENTURE | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| STUDIOS ARCHITECTURE | 7 | 05/21/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 3 | 05/14/2026 |
| EP ENGINEERING LLC | 12 | 03/03/2026 |
| SOHITH PERERA RA | 1 | 02/04/2026 |
| ROBERT SILMAN ASSOCIATES | 6 | 12/10/2025 |
| R.J. MCGEE ENGINEERING, PLLC | 3 | 12/01/2025 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 3 | 11/26/2025 |
| BLACK SHEEP ENGINEERING GROUP | 4 | 10/30/2025 |
| TERJESEN ASSOCIATES ARCHITECTS PC | 2 | 07/16/2025 |
| JENNIFER SZE | 1 | 06/30/2025 |
| COGEN ARCHITECTS | 1 | 06/11/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 06/10/2025 |
| SCHNACKEL ENGINEERS | 5 | 03/10/2025 |
| KEVIN C. GORE, AIA ARCHITECT | 2 | 01/29/2025 |
| JACK GREEN ASSOCIATES | 6 | 10/09/2024 |
| CORNERSTONE ENGINEERING, INC. | 2 | 07/16/2024 |
| TRICARICO ARCHITECTURE AND DESIGN | 3 | 09/27/2023 |
| CUSTOM DESIGNING & ENGINEERING | 3 | 09/27/2023 |
| BROMLEY CALDARI ARCHITECTS | 1 | 04/13/2023 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 03/01/2023 |
| BAZINI ENGINEERING, P.C. | 2 | 07/06/2022 |
| LL ENGINEERING PC | 4 | 05/16/2022 |
| F.P.VILLANO CONSULTING ENGINEER LLC | 1 | 08/18/2021 |
| CUSTODIO CONSULTING, LLC | 2 | 08/13/2021 |
| KANEKO ARCHITECTS, P.C. | 1 | 08/13/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 32 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 20 | 03/21/2026 |
| DVA Advisors | 12 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 8 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 7 | 03/21/2026 |
| UNIVERSAL SIGNS SERVICE | 4 | 03/21/2026 |
| DOMANI CONSULTING | 6 | 03/21/2026 |
| PEROTTO CONSULTING MANAGEMENT | 14 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| LOUIS STRIAR | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CORE FOUR CONSTRUCTION IN | General Contractor | 22 | 07/22/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 11 | 07/08/2026 |
| MK CONSTRUCTION GROUP | General Contractor | 8 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 8 | 09/16/2026 |
| NICON BUILD LLC | General Contractor | 6 | 03/21/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 6 | 07/08/2026 |
| NEW AMSTERDAM RESTORATION | General Contractor | 5 | 08/04/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 4 | 07/08/2026 |
| NEW YORK INTERIOR CONTR I | General Contractor | 4 | 03/21/2026 |
| SPK/LEWIS CONSTRUCTION LL | General Contractor | 3 | 07/08/2026 |
| TAURINO MANAGEMENT, INC | General Contractor | 3 | 03/21/2026 |
| SEAN COAKLEY P & H INC | Plumbing | 3 | 07/08/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 2 | 08/14/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| LTM CONSTRUCTION LLC | General Contractor | 2 | 07/08/2026 |
| A.S.K. ELECTRICAL CORP | Electrical | 2 | 03/22/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 2 | 07/08/2026 |
| UNIVERSAL SIGNS SVC | Scaffold | 2 | 07/08/2026 |
| BEACON CONSTRUCTION SERV | General Contractor | 1 | 07/08/2026 |
| ROBERTS, QUINSIE | Electrical | 1 | 03/21/2026 |
| EXTERIOR WALL & BUILDING | General Contractor | 1 | 04/09/2026 |
| FINALY GENL CONTR CORP | General Contractor | 1 | 07/08/2026 |
| DEANGELIS PLBG & HTG.INC | Plumbing | 1 | 07/08/2026 |
| O'CONNOR, MOXIE | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DOMANI INSPECTION SERVICE | 843 | 19 | 03/03/2026 |
| AMINOV DESIGN ENGINEER, P | 9365 | 3 | 12/01/2025 |
| QUALITY CONTROL LABORATOR | 406 | 2 | 09/02/2025 |
| URBAN INTEGRATIONS LLC | 7993 | 1 | 07/23/2025 |
| HANSEN ENGINEERING PC | 8174 | 6 | 07/16/2025 |
| SOCOTEC, INC. | 301 | 1 | 06/30/2025 |
| CONCRETE SOLUTIONS LAB CO | 5344 | 5 | 03/10/2025 |
| LEO Y LEE ASSOCIATES | 2481 | 1 | 07/17/2024 |
| GREGORY V. PEROTTO, P.E. | 947 | 4 | 09/27/2023 |
| THE EIPEL ENGINEERING GRO | 2714 | 1 | 03/01/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 09/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 08/13/2026 |
| DOB NOW | General Construction | Permit Issued | NEW AMSTERDAM RESTORATION | 08/03/2026 |
| DOB NOW | Structural | Permit Issued | CORE FOUR CONSTRUCTION IN | 07/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 07/02/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 06/18/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | URBAN INTELLIGENCE, INC | 05/19/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NEW AMSTERDAM RESTORATION | 05/14/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | NEW AMSTERDAM RESTORATION | 04/27/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 04/08/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 03/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | SEAN COAKLEY P & H INC | 03/19/2026 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 03/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 03/05/2026 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 02/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | SEAN COAKLEY P & H INC | 02/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 01/30/2026 |
| DOB NOW | Plumbing | Signed-off | SEAN COAKLEY P & H INC | 01/30/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 01/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | ALLSTATE SPRINKLER LLC | 12/15/2025 |
| DOB NOW | Standpipe | Permit Issued | SEAN COAKLEY P & H INC | 12/12/2025 |
| DOB NOW | Sprinklers | Permit Issued | SEAN COAKLEY P & H INC | 12/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NICON BUILD LLC | 12/09/2025 |
| DOB NOW | General Construction | Permit Issued | NICON BUILD LLC | 12/09/2025 |
| DOB NOW | Plumbing | Permit Issued | M. EARLY PLBG & HTG CORP | 12/08/2025 |
| DOB NOW | Structural | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/24/2025 |
| DOB NOW | Structural | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/24/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/12/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/10/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/07/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/06/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 11/05/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | ARSENAL SCAFFOLD INC | 10/31/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 10/16/2025 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 09/23/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NEW AMSTERDAM RESTORATION | 09/23/2025 |
| DOB NOW | General Construction | Signed-off | VOLK INDUSTRIAL SERVICES | 09/05/2025 |
| DOB NOW | General Construction | Permit Issued | NEW AMSTERDAM RESTORATION | 09/02/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 08/27/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | Pass-Final SD - Up to 9 Requested Floors | Pass | View ↗ |
| 05/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/19/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/21/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 09/21/2026 | Mechanical Systems | JOHN MCMONAGLE | special |
| 09/21/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 09/21/2026 | Final | JOHN MCMONAGLE | progress |
| 09/18/2026 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 12/12/2025 | Structural Stability – Alterations of existing buildings | JOHN MCMONAGLE | special |
| 12/12/2025 | Final | JOHN MCMONAGLE | progress |
| 12/12/2025 | Structural Steel - High Strength Bolting | JOHN MCMONAGLE | special |
| 12/12/2025 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 12/12/2025 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 12/12/2025 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 12/12/2025 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 12/09/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 12/04/2025 | Final | JOHN MCMONAGLE | progress |
| 12/04/2025 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 12/04/2025 | Final | JOHN MCMONAGLE | progress |
| 12/04/2025 | Mechanical Systems | JOHN MCMONAGLE | special |
| 12/04/2025 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 12/04/2025 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 12/04/2025 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 12/04/2025 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 12/02/2025 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 12/02/2025 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 12/02/2025 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 12/02/2025 | Final | JOHN MCMONAGLE | progress |