| Owner | Filings | Most Recent |
|---|---|---|
| City Recycling | 15 | 03/22/2026 |
| Mountain Man Sand & Gravel | 13 | 10/04/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/30/2021 | $8.9M | — | Private party → 47TH STREET & 58TH ROAD LLC | $1,754/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| KBN Services | 13 | 10/01/2026 |
| Dynamic Engineering Consultants | 5 | 02/12/2024 |
| Gensler | 3 | 12/14/2023 |
| MG Engineering | 7 | 12/13/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| Ragnarok Consultants | 12 | 03/21/2026 |
| KBN Services | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Unity Construction Services | General Contractor | 16 | 07/08/2026 |
| NY Drilling | specialty_contractor | 7 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Vitello Sewer W.M. H&P Services | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| S&S Concrete & Soil Testi | 1008 | 4 | 04/27/2026 |
| Atlas ATC Engineering | 8011 | 8 | 12/14/2023 |
| Atlantic Engineeringlabor | 1381 | 1 | 10/06/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | NY Drilling | 05/07/2025 |
| DOB NOW | General Construction | Permit Issued | NY Drilling | 04/30/2025 |
| DOB NOW | General Construction | Permit Issued | NY Drilling | 02/18/2025 |
| DOB NOW | Plumbing | Signed-off | Vitello Sewer W.M. H&P Services | 01/05/2024 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 12/27/2023 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 05/19/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 02/07/2023 |
| DOB NOW | Plumbing | Signed-off | Bedrock Plumbing & Heating | 01/11/2023 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 01/06/2023 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 01/06/2023 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 06/15/2022 |
| BIS | MH | ISSUED | Municipal Building Consultats | 10/19/1999 |
| BIS | OT | ISSUED | Petroluem Tank Cleaners | 12/16/1997 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/01/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MSZ-HX18NL; matched with HP-1 MUZ-HX18NL. Nominal 1.5 tons; COP 3.32 at 47F is matched-system rating. Included in HP-1 system totals; no additional system capacity. 18,000 BTU · Fan Coil Indoor ×1 MUZ-HX18NL; matched with IDU-1 MSZ-HX18NL. Nominal 1.5 tons; system rated heat 18,000 BTU/hr and COP 3.32 at 47F; rated cool 17,200 BTU/hr at 95F; 20 SEER2. 18,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/19/2023 | Complete | Cogen Electrical Services | General Wiring |
| 03/17/2022 | Complete | Patriot Electric | 1 meters |
| 03/01/2022 | Cancelled | Patriot Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | Permit Issued | NY Drilling | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/27/2026 | Permit Issued | NY Drilling | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/17/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/10/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/16/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/02/2024 | Fail-Final PL - Underground | Fail | View ↗ |
| 01/18/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 10/06/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/29/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/24/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/17/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/26/2026 | Final | — | progress |
| 09/26/2026 | Mechanical Systems | — | special |
| 04/22/2026 | Insulation placement and R values | GLEN LANGER | energy_progress |
| 04/22/2026 | Fire-Resistant Penetrations and Joints | GLEN LANGER | special |
| 04/22/2026 | Fenestration areas | GLEN LANGER | energy_progress |
| 04/22/2026 | Fenestration and door U-factor and product ratings | GLEN LANGER | energy_progress |
| 04/22/2026 | Air barrier - visual inspection | GLEN LANGER | energy_progress |
| 04/22/2026 | Fenestration air leakage | GLEN LANGER | energy_progress |
| 04/22/2026 | Interior lighting power | GLEN LANGER | energy_progress |
| 04/22/2026 | Lighting controls | GLEN LANGER | energy_progress |
| 09/08/2025 | Subgrade Inspections | GLEN LANGER | special |
| 09/08/2025 | Subsurface Conditions – Fill Placement & In-Place Density | GLEN LANGER | special |
| 09/08/2025 | Final | GLEN LANGER | progress |
| 09/08/2025 | Concrete - Cast-In-Place | GLEN LANGER | special |
| 09/08/2025 | Excavations - Sheeting, Shoring, and Bracing | GLEN LANGER | special |
| 09/08/2025 | Post-installed Anchors | GLEN LANGER | special |
| 09/08/2025 | Structural Stability – Alterations of existing buildings | GLEN LANGER | special |
| 09/08/2025 | Footing and Foundation | GLEN LANGER | progress |
| 09/08/2025 | Structural Steel - Details | GLEN LANGER | special |
| 09/08/2025 | Structural Steel - High Strength Bolting | GLEN LANGER | special |
| 09/08/2025 | Structural Steel - Welding | GLEN LANGER | special |
| 02/20/2025 | Subgrade Inspections | — | special |
| 02/20/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 02/20/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 12/15/2023 | Fenestration areas | GIORGI KHARDZEISHVILI | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Concrete Solutions NYC | Office | Floor 1 | Project Q01115035 |